Laserfiche WebLink
240 - <br />230 <br />220 <br />210 <br />a 200 <br />a 190 <br />v <br />v 180 <br />J <br />L <br />c; 170 <br />�a <br />m <br />160 <br />C <br />'FL 150 <br />E <br />D 140 <br />130 <br />120 <br />110 <br />100 <br />DON PEDRO PUMP <br />1930 S. Walnut Rd <br />Turlock, CA 95380 <br />209 632 3161 <br />donpedropump.com <br />-- - - ' Setting: 10" x 400' Discharge: 1 80f <br />Masellis Drilling -Neilson -Jack Tone Rd <br />06/13/22 22-0651 <br />0 500 1000 1500 2000 2500 3000 3500 <br />Gallons Per Minute (GPM) <br />SWL <br />112 <br />AVG Yield <br />29.17 <br />GPM <br />PWL <br />Yield <br />Sand <br />500 <br />127 <br />33.33 <br />clear <br />1000 <br />142.4 <br />32.89 <br />clear <br />1500 <br />162.9 <br />29.47 <br />clear <br />2000 <br />184.6 <br />27.55 <br />clear <br />2500 <br />208 <br />26.04 <br />clear <br />3000 <br />228.6 <br />25.73 <br />clear, trace sand <br />Masellis Drilling -Neilson -Jack Tone Rd -22-0651 <br />Recovery <br />130.4 <br />127.2 <br />126.6 <br />124.4 <br />123.8 <br />5hr constant rate @ 2000gpm <br />10min <br />191.2 2hr <br />192.9 <br />20min <br />192.2 3hr <br />193.2 <br />30min <br />1919.4hr <br />193.8 <br />1 hr <br />192.0 5hr <br />193.9 <br />Masellis Drilling -Neilson -Jack Tone Rd -22-0651 <br />Recovery <br />130.4 <br />127.2 <br />126.6 <br />124.4 <br />123.8 <br />