Laserfiche WebLink
6" Min f 6"i <br />(TYP) <br />3'-0" <br />Var �\------- <br />OD/2 <br />10" Min <br />OD <br />+ 20" Min <br />RIGID CONDUIT <br />Note 1 Below <br />� <br />Existing <br />Pavementt <br />See Note <br />2 Below <br />-Compact in <br />12" max <br />layers to a <br />min relative ; <br />compaction <br />of 95% <br />under pavement and <br />90% outside <br />pavement. <br />L/1, <br />-Compact in <br />24" max ; <br />layers to a min relative <br />compaction <br />of 85%. < <br />—Compact in <br />6" layers <br />to a min relative <br />compaction <br />of 90%. <br />10" Min 10" Min ---a <br />�6" 6" Min <br />(TYP) <br />3'-0" <br />G________J:K, Var <br />OD <br />+ 20" Min <br />FLEXIBLE CONDUIT <br />OD+12" <br />10" Min <br />NOTES: <br />1. New pavement shall be I" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1 " thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Wmidn for YOU <br />Approved by: <br />TYPICAL TRENCH BACKFILL�gz� <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-29 <br />