Laserfiche WebLink
S A N i�J 0 A Q U I N Environmental Health Department <br /> COUNTY <br /> Jasjit Kang, REHS, Director <br /> Greatness grows here. MuniappaNaidu, REHS,AssistantDirector <br /> c��iFoa?`P <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco, REHS, RDI <br /> Willy Ng,REHS <br /> Steven Shih, REHS <br /> Michelle Henry, REHS <br /> Elena Manzo, REHS <br /> September 26, 2022 <br /> To: San Joaquin County Community Development Department, <br /> Attention: Stephanie Stowers <br /> From: Aldara Salinas; (209) 616-3019 <br /> Environmental Health Specialist 6CP <br /> RE: PA-2200186, (SPP), Early Consultation, S00015158 <br /> 1400 W. Frewert Rd., Lathrop <br /> The following requirements have been identified as pertinent to this project. Other <br /> requirements may also apply. These requirements cannot be modified. <br /> 1. A valid Commercial Cannabis License is required to conduct Commercial Cannabis <br /> Activities. An approved Certification of Occupancy is required. Applicant shall contact <br /> Steven Shih, Program Coordinator, at (209) 468-9850 to obtain an application for <br /> Commercial Cannabis License.. (San Joaquin County Development Title, Section 4-10007 <br /> and 4-10013) <br /> 2. Applicant shall contact Natalia Subbotnikova, Program Coordinator, Small Public Water <br /> System Program, at (209) 616-3048, to determine if the existing well can be permitted as <br /> a public water system prior to issuance of building permits. If a public water system is <br /> required, applicant shall submit a Small Public Water System preliminary technical report <br /> to the California State Water Resources Control Board, Division of Drinking Water (Water <br /> Board) at least six months before initiating construction of any water related improvement, <br /> as defined. The issuance of a permit to operate a small public water system by the local <br /> primacy agency (EHD) is prohibited without the concurrence of the Water Board. Please <br /> contact Brian Kidwell, P.E. with the SWRCB Division of Drinking Water at (209) 948-3963 <br /> concerning the requirements for preliminary technical report submittal prior to issuance of <br /> building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water <br /> source, a permit application to operate Small Public Water System shall be submitted to <br /> the EHD for approval prior to issuance of building permits. To issue a permit to operate, <br /> concurrence from the Water Board is required. A yearly permit to operate a public water <br /> system will be required by the EHD prior to sign off of the certificate of final occupancy <br /> (San Joaquin County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> 3. The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />