My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085493_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HANSEN
>
26603
>
2600 - Land Use Program
>
SR0085493_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2022 1:05:26 PM
Creation date
9/21/2022 1:02:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0085493
PE
2602
FACILITY_NAME
ALL STAR INDUSTRIES
STREET_NUMBER
26603
Direction
S
STREET_NAME
HANSEN
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911004
ENTERED_DATE
7/7/2022 12:00:00 AM
SITE_LOCATION
26603 S HANSEN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ors <br />�.•,a„�� ,o 3A.tV J VAYU11V l.V UlV 1 Y <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue Stockton CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 464-0138 Web: www.sjgov.org/ehd <br />9L�FOR� <br />NITRATE LOADING STUDY REQUIREMENT CHECKLIST <br />PA #. <br />SITE LOCATION: ` <br />�tJ® �1h�1G�1�• 11l/��� REPORT DATE: �2U2z <br />S = Sufficient <br />I = Insufficient <br />San Joaquin County Development Title Chapter 9-1105, Section 9-1105.2 <br />S <br />I <br />1.0 <br />CHEMICAL AND PHYSICAL PROPERTIES OF SOIL <br />[� <br />❑ <br />1.1 <br />Description of the chemical and physical properties of the soils underlying the site. <br />❑ <br />❑ <br />1.2 <br />Description of the mass transport properties of the soils underlying the site with respect to nitrate and/or any other <br />these sources to the project site. <br />❑ <br />constituent of concern identified for the project site. <br />l_ Zb <br />load from these sources to the project site. <br />ANALYSIS �J}�'VgJ`1R'�Uv�i, <br />❑ <br />3.5 Calculated mass balance of nitrogen loading considering all potential sources identified. Use of <br />2.0 <br />GROUNDWATER <br />J�y�� <br />UT -� ® ' 6 1 q✓. `) & ) <br />Hanztch/Finnemore, or other appropriate formula/model, if applicable. <br />❑ <br />❑ <br />�Y' j <br />ff <br />❑ <br />2.1 <br />Description of: depth to groundwater, seasonal fluctuations of groundwater depth, direc-flonal flow and gradient. <br />❑ <br />2.2 <br />Description/discussion of any existing or potential groundwater contamination issues in the general location of the <br />site. <br />❑ <br />2.3 <br />Description of the current use of groundwater at the site and of the future expected use of groundwater as related <br />to the proposed development project. <br />3.0 SOURCES AND CALCULATED IMPACT OF NITRATE TO GROUNDWATER <br />[✓� <br />❑ <br />3.1 Description of all current off-site sources of nitrate to soil and groundwater in the general up gradient area and the <br />contribution of nitrate load from these sources to the project site. <br />❑ <br />3.2 Description of impact of rainfall contribution of nitrate load to the project site. <br />❑ <br />3.3 Description of all current on-site sources of nitrate to soil and groundwater and the contribution of nitrate load from <br />these sources to the project site. <br />❑ <br />3.4 Description of all proposed future on-site sources of nitrate to soil and groundwater and the contribution of nitrate <br />load from these sources to the project site. <br />❑ <br />❑ <br />3.5 Calculated mass balance of nitrogen loading considering all potential sources identified. Use of <br />Hanztch/Finnemore, or other appropriate formula/model, if applicable. <br />❑ <br />❑ <br />3.6 Calculated impact of nitrogen loading from site project to down gradient wells, rivers, lakes etc. <br />4.0 DISCUSSION OF NITRATE LOADING RESULTS RELATIVE TO PROPOSED METHOD <br />OF WASTEWATER DISPOSAL <br />❑ ❑ 4.1 Discussion of total nitrate impact from proposed project. <br />❑ ❑ . 4.2 Description of the methods proposed to mitigate any known or future impact to soil and groundwater from nitrate, <br />and/or any other constituent of concern, at and/or around the proiect site. <br />5.0 CONCLUSIONS AND RECOMMENDATIONS SECTION <br />❑ 5.1 The report was signed, dated and stamped by a qualified environmental professional. <br />❑ ❑ 5.2 The attachments/appendices contain sufficient documentation to support claims made in the report. <br />Reviewed By: Th 1 Reviewed Date:. �5 <br />EBD 26-02 Page 1 of 2 Surface & Sub Checklist <br />7/14/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.