My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085076_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
4200 – Liquid Waste Program
>
SR0085076_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 4:13:58 PM
Creation date
9/29/2022 9:09:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0085076
PE
4201
FACILITY_NAME
AHERN TRUCK STOP
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25502014
ENTERED_DATE
3/29/2022 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> Paul W. Donoho, R.E.H.S. #6227 <br /> (530) 701-9972 <br /> AdvahTexo O&M <br /> COMMERCIAL TREATMENT SYSTEMS <br /> Inspection Points • • <br /> e.When the floats and filter cartridge are out of the tank,verify the Inspection Points—Pumps <br /> handles are long enough for easy access.It they are not,adjust <br /> them to the necessary length. When the panel has been inspected and powered up,the float inputs <br /> have been testa,and all pump voltage and phase information has been <br /> f. Reinstall the cartridge in the pump vault.Leave the float assembly verified,the pumps)can be powered up and tested. <br /> out of the tank or basin for use during pump run testing. <br /> 1.Manual pump operation: <br /> 7.Effluent pump:Verify the pump is easy to remove for service and <br /> maintenance and that the pump flow rate and voltage are correct. a.Switch the pump <br /> The ability to easily remove the pump is essential and depends upon breaker(s)In the control . <br /> careful installation in accordance with the instructions provided in panel to the"OM'position. a <br /> Appendix B.Set components on a plastic tarp or plastic sheeting b.Measure the static <br /> when they are out of the tank. voltage of the pumps) <br /> a.Switch the pump breakers) and eater the value(s)on <br /> in the control panel to fhe the start-up checklist. <br /> "OFF"position. c.Toggle the pump <br /> b.Verify the ball valve and "AUTO-OFF-MAN"switch to"MAN"The motor contactor will <br /> cam-tock fitfing or union on visibly and audibly engage at this point.It the motor contactor <br /> the discharge assembly is es. does not engage,check for an"RO"alarm condition.If there is <br /> within 24 inches(610 mm) no alarm condition,refer to the wiring diagram and verify the <br /> of the top of the riser. connections on the control circuit were properly terminated. <br /> c.Close the ball valve on WARNING:There is no motorprotection in TCOM panels and <br /> the discharge assembly if there is one and disconnect the panels without"HO'alarms Before runninga pump,always verify <br /> discharge assembly at the union or cam-lock fitting. that there is sufficient liquid in the tank orbasin. <br /> d.Verify there is enough slack in the pump cord for easy removal. NOTE:Refer to the"General Operating lnstructions"sechbn of the <br /> VCOM control panel documents to perform the"Manua!Test"if <br /> e.Pull the pump out of the vault by the discharge assembly and you are starling up a pump controlled by a VCOM panel. <br /> remove the pump from the tank <br /> d.Verify pump motor operation by checking the discharge plumbing <br /> WARNING:Lifting or lowering the pump by the cord can assembly for vibration. <br /> damage the pump and cord. – No vibration in the discharge plumbing assembly indicates a <br /> I. Check the voltage and phase values on the pump nameplate. pump wiring issue.Check the pump voltage and pump wiring <br /> Write them down in the start-up report.If there are pump motor terminations in the panel and in the splice box.Wires may be <br /> incorrectly terminated or wire insulation may be causing faulty <br /> stickers on the inside of the control panel door,check to see if contact between the wire and terminal lug. <br /> they match the pump nameplate. – Vibration in the discharge plumbing assembly with low or no <br /> WARNING:ff the pump does not match the panel voltage and flow from the pump indicates closed valves or line breakages. <br /> phase requirements,do not tum on the pump breakers. On duplex pumping systems with two discharge plumbing <br /> assemblies connected together to a single line,verify that there <br /> g.Reinstall the pump if the pump matches the panel voltage and are check valves on both pumps and that they are operating <br /> phase requirements. correctly.On three-phase systems,verify L1,L2 and L3 are <br /> wired correctly.A quick way to identify if the pump is wired <br /> h.Reconnect the discharge assembly at the union or cam-lock fitting correctly is to watch for clockwise torsion in the discharge <br /> and open the discharge assembly ball valve. plumotng assembly wizen me pump is nrst turned on. <br /> I. Switch the pump breaker(s)in the control panel to the"ON"position <br /> when finished. <br /> RIM-OM-ATX-3,Aev.�2.1,0.5!15 •• Copyright Orenco Syerems®.Inc•Properry of Orenee Systems°,Inc�Co no€reRroduce or tllsVihute without written authorization from 6renco�800-348-9943 <br />
The URL can be used to link to this page
Your browser does not support the video tag.