Laserfiche WebLink
PROJECT: Ahern Road Fueling Station February 28, 2022 <br /> Job No: 20-544 Ross P.Shod,Civil Engineer <br /> Installation Specifications for Filters, tanks and Floats <br /> All equipment elevations must be calculated from the invert of the outlet of the septic tank. See attached <br /> elevation sheet for details. No tank shall be buried deeper than recommended by the manufacturer. Spacing shall <br /> also be as recommended by the manufacturer or as plumbing allows. <br /> Float settings are shown on Exhibit#6. All Floats are coupled to the timers in the TCOM panel. Timers to be reset <br /> by service provider after initial operation break-in. <br /> The installation and setup of all Orenco°equipment is to be overseen by the supplier of the equipment. <br /> Page 11 Of 11 <br />