Laserfiche WebLink
Wesley, <br /> I ran the numbers through our design program, and have attached the results as part of this discussion. <br /> Here are my comments thus far: <br /> 1. For 50% reduction, the output is not requiring a post anoxic tank with carbon feed at this time. May be <br /> a good idea if you are planning more stringent nitrogen treatment requirements in the future. <br /> 2. Loading for first stage is requiring 5 AX-100 Pods and only a single AX-100 pod for the second stage. <br /> Again this is your call on adding that second AX unit for the second stage. <br /> 3.We would like to review the elevation drawings once they are ready. Other than that, you are good for <br /> sizing. <br /> Let me know if you have any further questions. <br /> David Lepre, P.E. <br /> Regional Engineer <br /> Orenco Systems Inc. <br /> 1-800-348-9843 ext. 481 (toll free) <br /> (541) 817-4243 Cell <br />