My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085076_OWTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AHERN
>
29700
>
4200 – Liquid Waste Program
>
SR0085076_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 4:13:58 PM
Creation date
9/29/2022 9:09:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0085076
PE
4201
FACILITY_NAME
AHERN TRUCK STOP
STREET_NUMBER
29700
Direction
S
STREET_NAME
AHERN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25502014
ENTERED_DATE
3/29/2022 12:00:00 AM
SITE_LOCATION
29700 S AHERN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1Grencollo <br /> Determine the pounds per day of Average Day Organic Load, OLA using Equation 131 from Appendix B: <br /> OLA2 = (28 mg/L) *(8.34 x 10-6 lbs•L/mg•gal) * (10,500 gpd) = 2.45 lbs/d <br /> Determine the textile area required based on Average Day Organic Load,AoLRA using Equation 1.1: <br /> (2.45 lbs/d) z <br /> AOLRA = 0.02 lbs/ft2d — 123 ft <br /> Hydraulic Loading—Second Stage <br /> Design average HLRA is 75 gpd/ft' (from page 15). Use Equation 1.2 to determine the textile area required based on Average Day Hydraulic <br /> Load,AHLRA: <br /> (10,500 gal/d) <br /> f z <br /> AHLRA — 75 gal/ft2d = 140 t <br /> Total Nitrogen Loading—Second Stage <br /> Design average TNLRA is 0.007 lbs TN/ft'.Use Equation B6 from Appendix B to determine the value of First-Stage AdvanTex effluent TKNe: <br /> TKNe = 160 mg/L x(1 — 0.95) = 8 mg/L <br /> Determine the pounds per day of Average Day TKN Load,TKNe, using Equation 131 from Appendix B <br /> TKNe = (8 mg/L) * (8.34 x 10-6 lbs•L/mg•gal)*(10,500 gpd) = 0.70 lbs/d <br /> Determine the textile area required based on Average Day Nitrogen Load,ArNLRA using Equation 1.3: <br /> (0.70 lbs/d) <br /> f z <br /> AT"LRA = 0.007lbs/ftzd = 100 t <br /> The area associated with the Design Maximum Day Hydraulic Loading Rate is the most restrictive and therefore the second stage AdvanTex <br /> area should be a minimum of 140 ft'. <br /> Treatment Unit Options—Second Stage <br /> Option 1: Using AX-Max units —140 ft'area <br /> AX-MAX150-28 (Max unit includes recirc-blend tankage and discharge tankage) <br /> Option 2: Using AX pod units —140 ft'area <br /> (2)AX100, 2625-gallon recirc tank, 2100-gallon discharge tank(Recirculation-blend tank sized at minimum of 25%of OM per page 17 of <br /> the Design Criteria; Discharge tank size based on local regulation, but typically sized at minimum of 20% of OM) <br /> Other Design Notes <br /> • Ensure access to treatment site for maintenance activities. <br /> • Ensure availability of water at treatment site for maintenance activities. <br /> Orenco Systems®•800-348-9843•+1541-459-4449•www.orenco.com NDA-ATX-1 <br /> Rev.8,©10/20 <br /> Page 37 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.