Laserfiche WebLink
S = Sufficient <br />I = Insufficient <br />S I <br />❑ <br />❑ <br />Fut <br />V3- El <br />LP ❑ <br />54 ❑ <br />® ❑ <br />6.0 PERCOLATION TEST INFORMATION SECTION <br />6.1 Site map showing the location, with concise and accurate dimensions of the percolation test holes on the parcel. <br />6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br />6.3 Description of the date, time and protocol used to prepare the test hole, including depth and dimensions of hole, <br />preparation of hole, and depth of water used to presoak (minimum 12 inches). <br />6.4 Description of the date, time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br />depth to water remaining in hole, etc.) <br />6.5 The test conformed to SJC Policy EHD 02-02 (correct depth, diameter, 2" gravel, 6" water refill, correct readings <br />recorded). <br />6.6 Complete Percolation Test Form (including readings) was provided with REHS verification signature. The rate <br />was correctly calculated using the last reading. <br />6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br />6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br />7.0 CONCLUSION SECTION <br />❑ 7.1 The report was signed and stamped by the appropriately registered individual Q <br />Reviewed By: -? Cit g ���6,�,!_ l� Reviewed Date: 1127127, <br />EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />