Laserfiche WebLink
S = Sufficient <br />= Insufficient <br />S 1 6.0 PERCOLATION TEST INFORMATION SECTION <br />❑ 6.1 Site map showing the location, with concise and accurate dimensions of the percolation test holes on the parcel. <br />❑ 6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br />❑ 6.3 Description of the date, time and protocol used to prepare the test hole, including depth and dimensions of hole, <br />( preparation of hole, and depth of water used to presoak (minimum 12 inches). <br />❑ 6.4 Description of the date, time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br />depth to water remaining in hole, etc.) <br />❑ 6.5 The test conformed to SJC Policy EHD 02-02 (correct depth, diameter, 2" gravel, 6" water refill, correct readings <br />,�( Elrecorded ). <br />6.6 Complete Percolation Test Form (including readings) was provided with REHS verification signature. The rate <br />/2 was correctly calculated using the last reading. <br />❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br />❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br />7.0 CONCLUSION SECTION <br />❑ 7.1 The report was signed and stamped by the appropriately registered individual <br />Reviewed By: <br />Reviewed Date: <br />EHD 26-03 Page 2 of 3 SOIL SUITABILITY STUDY CKLST <br />9-25-07 <br />