My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085490
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2900 - Site Mitigation Program
>
SR0085490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 2:07:52 PM
Creation date
10/4/2022 10:04:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085490
PE
2903
FACILITY_ID
FA0025419
FACILITY_NAME
NESTLE USA, INC.( FORMER NESTLE USA INC. FACILITY)
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25939025 (NEAR)
ENTERED_DATE
7/6/2022 12:00:00 AM
SITE_LOCATION
230 INDUSTRIAL AVE
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RIPON PERMIT NO.: 102 7.2- <br /> ENGINEERING DEPARTMENT <br /> 259 N.Wilma Avenue,Ripon,CA 95366 EXPIRATION DATE: <br /> Phone(209)599-2108/Fax(209)599-2685 EXTENSION DATE: <br /> Website:www.cityofripon.org <br /> ENCROACHMENT PERMIT APPLICATION <br /> Required for all activities in the Public Right-of-Way(ROW)or Public Easement <br /> Complete all items below. APPLICATION IS NOT COMPLETE UNTIL ALL REQUIRED SUBMITTALS ARE INCLUDED. <br /> Visit our website at www cltyofripon oro/ptv l�iWeoartments/engineerin for submittal requirements. <br /> PROJECT INFORMATION <br /> • Site Address: Intersection of 1st Street and South Stockton Ave, Ripon CA <br /> • Is this Permit associated with any existing project1permit9 D Yes ® No • If Yes.Project/Permit No. <br /> • Projected Start Date: 6/13/2022 • Projected Completion Date 12/31/2022 <br /> • Check all appropriate categories which describe the project: X New Construction f--� Maintenance or Repair <br /> Streets Public utilities Other Utilities Company <br /> ❑ Curb and Gutter D Water Service(s) ❑ Gas ❑ PG&E <br /> ❑ Driveway Approach(es) D Sewer Service(s) D Electrical O Wave Broadband <br /> ❑ Sidewalk D Storm Drain Connection(s) ❑ Service Hookup(s) <br /> ❑ Street Tree(s) El Street Light(s) ❑ Excavation/Trench Traffic Control <br /> ❑ City Landscaping ® Boring D Yes, Using Caltrans Standards <br /> ❑ Street Surfacing ❑ Overhead D Traffic Control Plan Submitted <br /> ❑Asphalt Patching ❑ Testing/Surveying ❑ Lane Closure(s) <br /> • Fully describe work within City Right-of-Way: <br /> Advance one boring (up to 16 feet deep)to install one soil vapor monitoring well and collect soil vapor samples. <br /> LICENSED CONTRACTOR INFORMATION <br /> • Company Name. Geocentric Drilling Inc • E-mail: mike@geocentricdrilling.com <br /> • Contact Person: Mike Cramer • Phone No.: (916) 304-2665 <br /> • Mailing Address: 1980 S. River Road, Suite E • Contractor License No.: 1073146 ✓ <br /> West Sacramento, CA 95691 • Business License No.. 1.3-101 <br /> • City/State/Zip: <br /> APPLICANT INFORMATION I CERTIFICATION <br /> • Applicant Name: Haley&Aldrich, Inc • E-mail: jgalvin@haleyaldrich.com <br /> • Mailing Address: <br /> 426 17th Street, Suite 700 • Phone No.: (510) 879-4579 <br /> • City/State/Zip: Oakland/CA/94612 <br /> The undersigned hereby requests the City to permit encroachment inion the City right-of-way as described above. It is understood that the <br /> encroachment,when constructed, shall be in accordance with the sketch attached and made a part hereof, and no work other than that specifically <br /> mentioned above.is hereby authorized. Undersigned agrees to be bound by the provisions of the ordinances,specifications and regulations of the City <br /> of Ripon,including but not limited to Section 12.12 of the City of Ripon Municipal Code, and all the terms, conditions and restrictions as general or <br /> special provisions on any part of this form,and/or attached hereto. Accepting this permit or starting work herein described shall constitute acceptance <br /> and agreement to all the conditions and requirements as set forth and will be adhered to as such. <br /> Ograey SWee by Jennifer GaMn <br /> Applicant/Authorized Agent SIGNATURE: Jennifer Galvin <br /> Dale,202205.17 172923-oro_ Date: •/ Z <br /> APPROVAL(OFFICE USE ONLY) <br /> Permission is hereby granted to the applicant to do the bed vrin corrinUfffice wi Chapter 12.12 of the City of Ripon Municipal Code. �I <br /> of Ripon Authorized Agent SIGNATURE: ` Date: ~v� <br /> UPON APPROVAL PO HIS PERMIT AT WORK SITE <br /> Contact the Engineering Dept. at 209-599-2108 at least 48 hours prior to construction <br /> 1,120iEncroach nenr Permils�Forms Version 202/.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.