Laserfiche WebLink
Phase E - San Joaquin River, French Camp, and Duck Creek <br />Approximate <br />Reach ID USACE ID Latitude <br />Approximate <br />Longitude Drill Method APN <br />SJC-30R CF -22-001 37.94686023 <br />-121.3374382 CPT - Seismic 14502013 <br />SJR -30R 2F-22-002 37.94682063 <br />-121.3372203 Mud Rotary 14502013 <br />