Laserfiche WebLink
F- <br /> ■ <br /> 0 0 IL ING H I <br /> HOLLY MMER E CENTER SIEGFRIED <br /> TRACY, CALIFORNIA Stoc Brookside Road <br /> tockton,California 95219 <br /> 209-943-2021 <br /> Fax: 209-942-0214 <br /> www.siegfriedeng.com <br /> QRpF ESS/ON <br /> SC Nl <br /> s�qT CIV <br /> FOF Cp, <br /> DATE SIGNED:-09/1 322 <br /> 0 <br /> APPLICABLE CODE INFORMATION — — — — —THE PLANS SHALL COMPLY WITH TITLE 24, PARTS 1 THROUGH 12 <br /> H <br /> BUILDING- 2019 CALIFORNIA BUILDING CODE V I I I <br /> 2019 CALIFORNIA EXISTING BUILDING CODE <br /> MECHANICAL- 2019 CALIFORNIA MECHANICAL CODE <br /> PLUMBING- 2019 CALIFORNIA PLUMBING CODE Q <br /> ELECTRICAL- 2019 CALIFORNIA ELECTRICAL CODE ' I 0 <br /> ACCESSIBILITY- 2019 CALIFORNIA BUILDING CODE, I V1 <br /> CHAPTER 11 B (TITLE 24-DISABLED ACCESS) <br /> ENERGY CODE- 2019 CALIFORNIA ENERGY CODE I I I SHEET INDEX: <br /> (TITLE 24) SUGAR ROAD I I I <br /> SHEET NO. DESCRIPTION <br /> FIRE/LIFE SAFETY- 2019 CALIFORNIA FIRE CODE - — _ — — _ — - - - Cs COVER SHEET— — — — — — <br /> FIRE ALARMS: NFPA 72 <br /> 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE c1.o GENERAL NOTES <br /> 2019 CALIFORNIA REFERENCED STANDARD CODEC2.0 OVERALL TOPOGRAPHIC& <br /> l I I I DEMOLITION PLAN <br /> ADDITIONAL CODES: l I <br /> C2.1 TOPOGRAPHIC& DEMOLITION <br /> PLAN I <br /> GRADING- 2019 CALIFORNIA BUILDING CODE APPENDIX J-GRADING TOPOGRAPHIC&DEMOLITION <br /> PROJECT TEAM — — c2.2 PLAN II <br /> C3.0 OVERALL PAVING PLAN <br /> CIVIL ENGINEER > I ' PROJECT C3.1 PAVING PLAN I PHELAN <br /> SIEGFRIED I C3.2 PAVING PLAN II D EVELOPM ENT <br /> 3428 BROOKSIDE RD ' LIMITS C4.0 OVERALL GRADING PLAN p P <br /> STOCKTON, CA 95219 � 450 Newport Center Drive, Suite 230 <br /> CONTACT: PAUL SCHNEIDER, P.E. QSD/QSP Newport Beach, CA 92660 <br /> J C4.1 GRADING PLAN I <br /> PHONE: (209)943-2021 J C4.2 GRADING PLAN II <br /> FAX: (209)942-0214 <br /> EMAIL: PJS@SIEGFRIEDENG.COM = I 1 I I C4.3 GRADING DETAILS I <br /> I I III <br /> LANDSCAPE ARCHITECT C4.4 GRADING DETAILS II BUILDINGS H&I <br /> GREEN DESIGN I I C5.0 OVERALL UTILITY PLAN <br /> LANDSCAPE ARCHITECTS, INC C5.1 UTILITY PLAN I HOLLY COMMERCE CENTER <br /> 1464 POPIN JOY DRIVE _ — — _ <br /> RENO, NV 89509 — — � � —_ — _ _ ARB R AVENUE C5.2 UTILITY PLAN II <br /> CONTACT: BARBARA M. HATCH, RLA,ASLA — — —_ _ — — — — — — — — — — — C6.0 EROSION CONTROL PLAN <br /> PHONE: (775)829-1364 C7.0 DETAILS I <br /> FAX: (775)829-1364 9375 SUGAR RD <br /> EMAIL: BHATCH00@CHARTER.NET C7.1 DETAILS II TRACY, CA 95304 <br /> S oA Z I C7.2 DETAILS III p <br /> GEOTECHNICAL ENGINEER I I Q I C8.0 FIRE ACCESS PLAN <br /> ENGEO INCORPORATED COURT <br /> 17278 GOLDEN VALLEY PARKWAY () MILESTONES: <br /> LATHROP, CA 95330 <br /> CONTACT: LAUREN BECKER W 28 JANUARY 2022 <br /> PHONE: (209)835-0610 BUILDING DEPARTMENT SUBMITTAL <br /> FAX: (888)279-2698 � =I <br /> W <br /> I I W <br /> BASIS OF CONTROL LARCH ROAD - INTERSTATE-205 <br /> HORIZONTAL AND VERTICAL CONTROL FOR THIS PROJECT IS — <br /> BASED ON THE"GEODETIC CONTROL NETWORK-CITY OF <br /> TRACY"AS SHOWN ON THE RECORD OF SURVEY FILED IN REVISIONS: <br /> BOOK 36 OF SURVEYS,AT PAGE 118, SAN JOAQUIN COUNTY 06-1 -22 <br /> RECORDS. PER SAID SURVEY,THE HORIZONTAL DATUM IS zk� PC 1 CORRECTIONS <br /> NAD83(2001.0)AND THE VERTICAL DATUM IS NAVD88. REFER 09-14-22 <br /> TO SAID SURVEY FOR MORE DETAILED INFORMATION. Z� PC 2 CORRECTIONS <br /> VICINITY MAP <br /> NOT TO SCALE <br /> cD <br /> 0 <br /> tY <br /> w <br /> 0 <br /> U <br /> I <br /> U <br /> I <br /> n <br /> 0 <br /> r\ <br /> w <br /> cn <br /> z <br /> 0 <br /> / <br /> to <br /> c� <br /> z <br /> 0 <br /> J_ <br /> m <br /> / <br /> to <br /> Z <br /> g <br /> n <br /> z <br /> w <br /> w <br /> 0 <br /> ry <br /> n <br /> a <br /> PROJECT: 17017 <br /> ry f:\17projects\17017 holly sugar industrial\improvement <br /> plans\BUILDINGS H&I\Onsite\17017-CS-Cover.dwg <br /> (n <br /> DATE: 9/13/2022 <br /> DRAWN BY: LSF/MWK <br /> to <br /> 0 0 <br /> BENCH MARK SHEET TITLE: <br /> z CITY OF TRACY CONTROL POINT NO. 2010 1 DOVER SHEET <br /> 0 <br /> CD Q Qo ELEVATION = 18.71'NAVD88 ALL WORK ASSOCIATED <br /> o� WITH BUILDING H SHALL BE <br /> DESCRIPTION: 2" BRASS DISK IN MONUMENT WELL LOCATED AT THE INTERSECTION OF <br /> U THE CENTERLINES OF ARBOR AVENUE AND MCARTHUR DRIVE. THE BRASS DISK HAS A PERFORMED UNDER <br /> 0 Know what's below. PUNCH MARK,AND IS STAMPED"TRACY LS 4479". <br /> Call before you dig. BUILDING PERMIT #2202552 <br /> LL <br /> UNIFORM DRAWING SYSTEM - U.S.NATIONAL CAD STANDARD VERSION 3.1 <br />