My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085267
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARBOR
>
9409
>
4200 – Liquid Waste Program
>
SR0085267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2022 11:04:33 AM
Creation date
10/6/2022 10:27:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
RECORD_ID
SR0085267
PE
2602
STREET_NUMBER
9409
Direction
W
STREET_NAME
ARBOR
STREET_TYPE
AVE
City
TRACY
Zip
95304
APN
21216020
ENTERED_DATE
5/12/2022 12:00:00 AM
SITE_LOCATION
9409 W ARBOR AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phelan Development Holly Master Plan - Buildings H & 1 <br /> 15188.000.006 Geotechnical Exploration <br /> - • <br /> EXPLTO GROUNDWATER ORATION GROUNDWATER <br /> ELEVATIONLOCATION (FEET) <br /> 4-CPT3 7 10 <br /> 4-CPT4 7'/2 10'/2 <br /> 4-CPT5 10'/4 9'/2 <br /> 4-CPT6 10 10 <br /> 4-CPT7 11'/2 8'/2 <br /> 4-CPT8 13 7 <br /> 4-CPT9 13 7 <br /> As part of previous studies performed by ENGEO for the larger Holly Sugar project, a piezometer <br /> (2-PZ4) was installed in the southeastern portion of the project site. Our records from fall 2018 <br /> show a high groundwater elevation of approximately 9'/2 feet, which corresponds to a depth of <br /> approximately 11'/2 feet bgs in the southeastern portion of the subject site. <br /> Fluctuations in the level of groundwater may occur due to variations in rainfall, irrigation practice, <br /> and other factors not evident at the time measurements were made. <br /> 2.6 LABORATORY TESTING <br /> We performed laboratory tests on selected soil samples to evaluate their engineering properties. <br /> For this project, we performed moisture content, dry density, unconfined compression, plasticity <br /> index, expansion index, hydrometer, resistance value, and soil corrosion potential testing. <br /> Moisture contents and dry densities are recorded on the boring logs in Appendix A; other <br /> laboratory data is included in Appendix B. <br /> 3.0 CONCLUSIONS <br /> From a geotechnical engineering viewpoint, in our opinion, the site is suitable for the proposed <br /> development, provided the geotechnical recommendations in this report are properly incorporated <br /> into the design plans and specifications. <br /> The primary geotechnical concerns that could affect development on the site are existing <br /> undocumented fill, shallow groundwater, expansive clay, and potentially liquefiable soil. We <br /> summarize our conclusions below. <br /> 3.1 EXISTING FILL <br /> Our test pits indicate that the portion of the site in the proposed vicinity of Building I is underlain <br /> by non-engineered, undocumented fill. Based on depth to fill encountered in our test pit <br /> explorations and their relative locations throughout the site, we estimate the volume of <br /> undocumented fill to be approximately 50,000 cubic yards. Figure 3 presents a subsurface cross <br /> section showing the geologic contacts of fill encountered in the vicinity of Building I. <br /> Non-engineered fills can undergo excessive settlement, especially under new fill or building loads. <br /> We recommend complete removal and recompaction of the existing fill. We present fill removal <br /> recommendations in Section 5.1. <br /> ENGEO December 13, 2021 <br /> Expect Exceltence <br />
The URL can be used to link to this page
Your browser does not support the video tag.