Laserfiche WebLink
, <br />Complaint Investigation Summary Report #: 5105, , <br />COMPLAINT ID: C00041663 Site Location: 2373 E MARIPOSA <br />Activity Summary <br />Activity Date <br />11/30/2017 MAILED NOTICE TO ABATE, DATED 11/29/2017, REGULAR TO: <br />TENANT: MAXIM CRANE WORKS, 2373 E. MARIPOSA RD., STOCKTON, CA <br />95205 <br />OWNER: WILLIAM JOHNS, 9175 JONATHON CT., STOCKTON, CA 95212 <br />12/07/2017 Mariposa 2373. Rtrn Mario's call. Left voice mail and told him I've received the <br />manifest for the removed solid but I've had a hard time identifying the date. Also <br />still need the plan for close-loop system. <br />Recorded by <br />MEUANGKHOTH <br />WONG <br />01/30/2018 MAILED SEWAGE DISPOSAL NOTICE TO ABATE, REGULAR TO TENANT MEUANGKHOTH <br />AND OWNER: <br />WILLIAM JOHNS <br />9175 JONATHON CT <br />STOCKTON, CA 95212 <br />MARIO BERMUDEZ <br />2373 S MARIPOSA RD <br />STOCKTON, CA 95205 <br />01/30/2018 Mariposa 2373. Issued 3rd NAI (2nd follow up) as there's still no engineer plan. <br />Accepted the non-HW manifest from Oct 2016. RE still wants them to destroy the <br />system if they're not going to do a close loop system for now. Spoke to Mario; <br />emailed him a copy of this new NAI and mailed hard copy to both him and property <br />owner. <br />WONG <br />02/01/2019 Mariposa 2373. Status check. No response to NAI from 1/2018 to date. Will WONG <br />contact owner before sending it to DA for referral. <br />01/08/2020 Mariposa 2373. Provided Jena a copy of the 2018 NAI. Requires submittal of 2 WONG <br />engineering plans for the new pressure washer at the same location of the wash <br />rack of this complaint (requirement on the BP as well) <br />08/02/2022 Mariposa 2373. non billed. Researched status before abating. The system was <br />upgraded back in 2020 as a closed loop system, where waste water is pump from <br />holding tank into a manhole, and from manhole to an above ground tank, as well <br />as working alarm under SR0082135 in 2020. I asked AG to do an inspection <br />before deciding if it can be abated. <br />WONG <br />08/03/2022 Stopped by the site as requested by JW. I Met the operation manager Kevin Bohn GOODERHAM <br />and he showed me to the truck wash facility, The truck wash is in use i <br />Documented that and left. Confirmed with jeff that the engineered system was <br />approved and inspected. I left a message with kevin noting that the engineer <br />requires daily inspection of the closed loop system. <br />08/03/2022 Mariposa 2373. AG confirmed wash rack is still being used and no release was <br />observed. Spoke to SS about if we still need to refer the past "potential" release <br />witnessed by Mike Escatto in around 2015 when he said the pipe connected to the <br />tank. No referral to RWQCB or WDR at this time because 1) EHD allowed the <br />engineered closed-system in 2020 as a part of land use requirement, and 2) the <br />system was verified by EHD, and there's no further release to the environment <br />since, and 3) neither Mike Escatto nor I observed any actual release. Abated <br />complaint after briefing SS my decision. Made some narrative entries for Mike E. <br />from 2016 retroactively. <br />WONG <br />5105 rpt <br /> Page 2 of 2