My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward, Inc. Solar Evaporation Pond Hydrologic Balance <br /> 1980-1982 (continued) <br /> From these calculations, it is evident that a surplus storage <br /> capacity is available at the present time. All material <br /> placed in solar evaporation Ponds 1-5 is accounted for in <br /> the hydrologic waste balance calculations. There is no <br /> unexplained or unaccountable losses that could indicate <br /> any seepage has occurred at the Forward, Inc. , site. <br /> Other Considerations <br /> 1. The ponds are lined with compacted clay soil to meet <br /> State permeability requirements of 10-6 cm/sec or less, <br /> of penetration of liquids. <br /> 2. The incoming volume of drilling water and mud <br /> is probably 10% less than estimated because vacuum <br /> tankers are typically not loaded to greater than 90% <br /> of capacity. this factor (which was not used in these <br /> calculations) would reduce the input volumes. <br /> 3. The approved site operations plan requires that pond <br /> liners be replaced at two to three year intervals. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.