Laserfiche WebLink
Gr <br /> ® 1 access of the drillers rig. For any ramps which are being con- <br /> 2 structed at Fonds 2 and 3 to allow San Joaquin Farm Bureau <br /> Federation sampling, and are unnecessary otherwise, San <br /> 4 Joaquin Farm Bureau Federation shall reimburse Forward, Inc. for <br /> the reasonable cost of construction and removal of said ramps, <br /> 6 within one week of billing therefore by Forward, Inc. <br /> 7 After Ponds 1, 2 and 3 are cleaned and dried, soil coring, dril- <br /> ling, angering or sampling will be conducted at some or all of <br /> 9 the locations described below, for Fonds 1, 2 and 3 only, or at <br /> 10 such nearby locations as are set by on-site concurrence between <br /> 11 driller, Bwight Baier, and Forward, Inc. personnel, one or ti- <br /> 12 <br /> i-1 sets of control samples from outside the pond area are to be <br /> 13 drilled and analyzed. <br /> 14 a. One control sample will be taken approximately on <br /> 15 <br /> hundred (100) yards south of the creek which intersects <br /> 16 the property. <br /> 17 b. Another control sample may be taken at a sate" on <br /> 18 direction approximately 90 degrees from the other <br /> 19 <br /> control sample. <br /> 20 C. Reasonable additional control samples may be taken as <br /> 21 requested by Forward, Inc. , at the expense of Forward, <br /> 22 Inc. <br /> 23 d. The dates for drilling will be selected according th <br /> 4 availability of the driller, the personnel of Forward, <br /> 25 <br /> Inc. , the Regional Water Quality ControlBoard nnc::, ' <br /> 26 <br /> Dwight Baier and Richard Konig. It is preferred that <br /> 7 drilling start on a Monday, Tuesday, . r11Wednesday. <br /> 28 <br /> -2- <br />