Laserfiche WebLink
5. i • <br /> January 19, 1983 <br /> Project 116-1.3 <br /> - 2 - <br /> Industrial wastes consisting of wet-solid sludges from FMC Corporation were <br /> accepted for disposal in the Group 1 Trench Landfill Area and were placed <br /> in Trench #3. Trench #3 was filled and covered during the 4th quarter of <br /> 1982. Additional cover material was being placed, compacted and graded <br /> over all Group 1 Trenches when we were forced by heavy rain to stop work. <br /> Following completion of Trench #3, we accepted approximately 5 loads of <br /> additional FMC waste. This material was stored in a bermed enclosure near <br /> the north end of Group 1 Trench #2. Further shipments of FMC waste were <br /> not accepted following receipt of your letter of 28, December, 1982. <br /> Evaporation Ponds #1, #2 and #3 were cleaned during the 3rd calendar quarter, <br /> 1982. Soil samples were subsequently collected both by Dwight Baier (Baier <br /> Agronomy) and by BETA ASSOCIATES. The results of chemical analyses on these <br /> samples were completed in November, 1982. We are currently working with <br /> Mr. Dennis Wescott of your staff on the interpretation of these analytical <br /> results. A complete report detailing the results of the field and laboratory <br /> investigation will be forwarded to your office when the interpretive work <br /> has been completed. <br /> Subsequent to cleaning and testing of the evaporation ponds listed above, <br /> new pond liners were placed to a thickness of 3.0 feet, compacted to 90% <br /> of maximum density at optimum moisture +2% and tested to determine permeability. <br /> A summary of the test results are attached to this report. Since there are <br /> still unanswered questions regarding chloride ion concentrations in the <br /> soil, we discontinued accepting brine waste from gas wells. Drilling mud <br /> waste however, is being accepted in Evaporation Pond #3. Table 2 below <br /> provides volume data on Group 1 wastes (FMC) and drilling mud waste for <br /> the 4th quarter, 1982. <br /> TABLE 2 - GROUP 1 WASTE, DRILLING MUD, BRINE <br /> F14C Drilling Mud Brine <br /> Month . (cu.yds. ) (Bbls. ) (Bbls. ) <br /> October 1982 1260 1800 2523 <br /> November 1982 1240 2550 -0- <br /> December 1982 200 6492 -0- <br /> TOTALS 2,700 10,842 2,523 <br /> Note: 1 Bbl. = 42 gallons <br /> ccordance with the Revised Monitoring and Reporting Program dated <br /> 22, December, 1982, we submit the. analysis of wastewater from Evaporation <br /> Ponds #3, #4 and #5 in Table 3 following. Ponds #1 and #2 are empty. <br /> Beta Associates <br />