My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 5-1739-1 <br /> H. KLEINFELDER & ASSOCIATES February 22, 1982 <br /> TABLE I/Page 2 of 2 <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Dry Laboratory Specified <br /> Test Moisture Density Compaction Relative Relative <br /> No. Date Test Location -Depth % Dry Wt. P.C.F. Curve No. Compaction Compaction <br /> 13 02/05 Berm N S At FG 16.4 104.0 1 92 90% <br /> Center <br /> 14 02/05 Berm N S At FG . 16.5 106.4 1 95 90% <br /> N End <br /> 15 02/05 Berm West FG 16.4 106.7 1 95 90% <br /> End At <br /> Center <br /> Denotes Finished Grade <br /> Accepted engineering and testing procedures were used for These tests. The above data is presented for in- <br /> formation purposes only. In the absence of continuous observations of our personnel at the site. we can not <br /> express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the <br /> guarantee of construction. nor do we relieve the contractor of his primary responsibility to produce a com- <br /> pleted project conforming to the project plans and specifications. <br /> IHK&A Form R-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.