My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 13, 1983 <br /> Project 116-1.3 <br /> - 2 - <br /> Industrial Group 1 wastes from. FMC Corporation and other generators were <br /> not accepted for disposal in ,the Group 1 Trench Landfill Area. We <br /> anticipate completing work on"Group 1 Trench #4 during the second <br /> calendar quarter. We have discussed some design revisions with <br /> Mr. H. Eagle, State Water Resources Control Board, and are currently <br /> awaiting comments from your staff. <br /> Drilling mud waste was accepted in Evaporation Pond #3. Table 2 below <br /> provides volume data on drilling mud waste during the first quarter, ,1983.. <br /> r <br /> TABLE 2 - DRILLING MUD <br /> ( i <br /> Drilling Mud <br /> Month (Bbls.) <br /> January 1983 9900 <br /> February 1983 12,540 <br /> March 1983 14,740 <br /> TOTAL 37,180 <br /> r <br /> Note: 1 Bbl. = 42 gallons <br /> -At present,_ all evaporation ponds have 1.5 to 2.0 feet of freeboard and <br /> we do not anticipate accepting additional drilling mud or brine waste <br /> until additional storage capacity can be developed. In accordance with <br /> the Revised Monitoring and Reporting Program dated 22, December, 1982, we <br /> submit the analysis of wastewater from Evaporation Ponds #1 through #5 in <br /> Table 3. <br /> k <br /> GBetav4ssociates Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.