My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1982-1983
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1982-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:12:38 PM
Creation date
10/6/2022 3:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1982-1983
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l - File No. S-1739-1 <br /> September 2 6, 1983 <br /> ). H. KLEINFELDER & ASSOCIATES <br /> SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth From Dry Laboratory Specified <br /> Test Finished Moisture Density Compaction Relative Relotive <br /> No. Date Test Locotion Subgrade % Dry Wt. P.C.F. Curve No. Compaction Compaction <br /> FG* <br /> Compacted Embankment <br /> 67 8-27 Station 2+50 -21 14.5 113.0 3 98 90 <br /> Compacted Embankment <br /> 68 It Station -2+50 -16 15.5 107.6 3 93 90 <br /> Compacted Embankment <br /> 69 °' Station -0+75 -16 15;4 108.0 3 94 90 <br /> Compacted Embankment <br /> 70 Station 1+25 -16 15.0 112.1 3 97 90 <br /> Compacted Embankment <br /> 71 Station 2+25 -16 14.9 112.0 3 97 90 <br /> Compacted Embankment <br /> 72 8-29 Station -2+25 -13 15.1 111.2 3 97 90 <br /> Compacted Embankment <br /> 73 of Station -1+25 -13 15.8 107.2 3 97 90 <br /> Compacted Embankment <br /> 74 Station 0+75 -13 14.9 112.1 3 97 90 <br /> Compacted Embankment <br /> 75 Station 2+25 -13 15.3 108.3 3 94 90 <br /> N. Levee <br /> 76 E. Area -7 15.2 109.9 3 96 90 <br /> N. Levee <br /> 77 '° West Area -7 15.3 110.5 3 96 90 <br /> Compacted Embankment <br /> 78 Station 1+75 -11 14.9 112.3 3 97 90 <br /> Compacted Embankment <br /> 79 Station 1+10 -11 14.8 112.3 3 97 90 <br /> Compacted Embankment <br /> 80 '° Station -1+50 -11' 15.6 111.9 3 97 90 <br /> Accepted engi^ieering and testing procedures were used for these tests. The above data is presented for in- <br /> formation purposes only. In the absence of continuous observafions of our personnel at the site, we can not <br /> express an opinion as to the adequacy of site preparation or overall fill compaction. We do not undertake the <br /> guarantee of construction,nor do we relieve the contractor of his primary responsibility to produce a com- <br /> pleted project conforming to the project plans and specifications. <br /> IHK&A Form R-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.