Laserfiche WebLink
PLUMBING SPECIFICATIONS. <br />��� •'a^'K°"'a` <br />i CODESANDREGULATIONSALLWGRKANOIMTERIALSSWULBENACCORDANCEWITH THEFOLLOWINGCODES <br />AS ADOPTED AND AMENDED BY THE AUTHORITY HAVING AIRISDICTION NOTHING IN THESE DRAYANGS OR <br />SPECIFICATIONS IS TO BE CONSTRUED TO PERMIT WORT( HOT CONFORMING TO THESE CODES <br />--»rtw ra..rz <br />A CAIFORNIA BUILDING CODS-CBC-20tB <br />B CALIFORNIA PLUN8ING CODE -LPC - M19 <br />C CAUFORMIA CODE OF REGULATHONSTITLE B.MDIISTRIAL RELATIONS <br />REVISIONS <br />D CALIPORWA CODE OF REGULATIONS, TITLE 24, BUILDING STNIDARD9 <br />E. TITLE 24, PART II, CALIFORNIA GREEN BUILDING CODE, M19 EDITION <br />ADDENMM I-OTNTR016 <br />°'••°'• ' a. "'T u� <br />wAi <br />2 PERMIT ,WD INSPECTION CHARGES OBTAIN ALL PERMITS REQUIRED FOR PERFORA9NO VAMK AND PAY ALL <br />RELATED FEES CALL FOR ALL REQUIRED INSPECTIONS AND PAY ALL RELATED FEES <br />3 GUARANTEETHE CONTRACTOR SHALL REPAIR ANY DEFECTS DUE TOFANILTY MATERIALS OR WORgMNSHN'AND <br />CLEANOUT TO GRADE DETAILPAY <br />A <br />A <br />FOR ANY DAMAGE TO OTHER YORK RESULTING THERE FROM IN APPEARS VI T A PERIOD OF ONE <br />YEAR FROM DATE OF ACCEPTANCE OF - <br />GENERAL NOTES: Pl0 <br />a. MATERIALS. EQUIPMENT AND INSTALLATON EACH ITEM REFERRED TO ON THE DRAWINGS AND IN THE <br />SPECIFICATIONS REPRESENTS THE STANDARD DF QUALITY DESIRED FOR MATERIALS, EQUIPMENT AND <br />1. THE INTENT OF THE DRAWING AND SPECIFICATIONS IS TO CONSTRUCT TH£8UILDING INACCORDANCE WITH <br />THE 2019 EDITION OF TITLE 21, CALIFORNIA CODE OF REGULATIONS, CHANGES TO THE STRUCTURAL, <br />INSTALLATION. ALL SUBSTITUTIONS MUST BE REVIEWED IN WARRING BY THE ENGINEER ALL MATERIALS AND <br />EQUIPMENT SHALL BE NEW AND FREE FROM DEFECTS. ALL INSTALLATION. SOUL BE AS RECOMMENDED BY THE <br />ACCESSIB)LRYOR FIREAND LIFE-SAFETYPORTIONSOF THEAFPROVED PLANS AND SPECIFICATIONS SHALL <br />MANUFACTURER ANO AS SHOWN ON DRAWNNGS <br />BE MADE BY AN ADDENDUM OR CONSTRUCTION CHANGE DOCLJAENTAS REQUIRED IN SECTION 1338, PART 1, <br />TITLE 21, CCR AND SHALL BE SUBMITTED TO AND APPROVED BY DSA PRIOR TO COMMENCEMENT OF THE <br />5 SUBMITTALS VBTHWN W DAYS OF CONTRACT AWARD THE CONTRACTOR SHALL SUGAR TTREE COPIES OFSHOP <br />DRAWINGS FOR PROPOSED FOR USE ON THHS PROJECT. PIESOF L OR <br />�j�1r�C11 <br />WORK DOCUMENTS SHALL BE PREPARED AND SUBMITTED TO OSA IN COMPLIANCE WITH DSA <br />ALL MATERWS. EQUIPMENT. ERC, <br />EOUIPMENT SHALL NOT BE ORDERED DR INSTALLED UNTIL WRITTEN REVIEW IS PROCESSED BY THE EN WM_ <br />INTERPRETATION OF REGULATION IR A-6. <br />ANY ITEM OMITTED FROM TIE SUSNTTAL S BE PROVIDED AS SPECIFIED WITHOUT SUBSTRTUTNHN. <br />2. LAYOUT OF MATERIALS. EQUIPMENTAND SYSTEMS IS GENERALLY DIA GRAMMA TIC UNLESS SPECIFICALLY <br />6 PIPING LAYOUT: ROUTE PIPING TO AVOID CUTDNG STRUCTURAL MEMBERS WHERE. CUTTING OR NOTCHING IS <br />DIMENSIONED. SOME WORK MAY BE SHOWN OFFSET FOR CLARITY THE HVAC BUILDING PLANS HAVE BEEN <br />REOUIRED, THE STRUCTURAL MEMBER SHALL BE REINFORCED IN ACCORDANCE WITH THE UNIFORM BUILDING <br />PREPARED TO MATCH THEARCH ITECTURAL PLANS IF DIFFERENCES OCCUR, THE ARCHITECTURAL PLANS ARE <br />CODE. PPNG SWILL BE INSTALLED TO ENSURE LMRESTRIC-EO FLOW AND PERMIT COMPLETE DRAINAGE CF THE <br />TUTAKE PRECEDENCE THEA TUALLOCATIONS OF ALL MATERIALS, PIPING. DUCT WDRKFIXTURES. <br />SYSTEM <br />�P <br />EQUIPMENT SUPPORTS.ETC. SHALL BECAREFUUYPLANNED, PRIOR TO WSTALLADONOFANYWORK TO <br />AVOIDALLINTERFERENCEWITHEACHOTTERORMI STRUCTURAL,ELECTRICAL,ARCWTECTURALOR <br />I PIPING MATERIALS. <br />OTHER ELEMENTS ALL DUCTAND PIPE OFFSETELBOWS FORCDORDINATIONBETWEEN TRADES ARE NOT <br />A SOL, WASTE A VENT PIPING. POLYVINYL CHLORIDE (PVC), SOR35. ASTM DXU. SOLVENT WELD, WITH PVC <br />SHOWN. CONTRACTOR SHALL INCLUDE SUFFICIENT FUNDS FOR THE COORDINA ITON OFFSETS IN THE BID <br />SOLVENT WELD FITTNG8 PIPING WITH LESS THAN 2A' OF COVER OUTSIDE BUILDING WALLS SHALL BE <br />VERIFY THE PROPER VOLTAGE AND PHASE OF ALL EQUIPMENT WITH THE ELECTRICAL PLANS. ALL CONFLICTS <br />CAST IRON <br />SHALL BE CALLED TO THE ATTENTION OF THEAROHITECT AND THE ENGINEER PRIOR TO THE INSTALLATION OF <br />ANY WORK OR THE ORDERING OF ANY EQUIPMENT <br />B. PERFORATED GRAIN PIPING, PVC PERFORATED MAN PIPE WTM BELL ENDS ASTM D17U SOLVENT WELD <br />3. WHEN INSTALLING DRIUEDVN ANCHORS ANDOR POWDERJDIUVEN PINS IN EXISTING NONPRESTRESSED <br />FITTINGS. TWO ROWS OF HOLES yr IN DWIETER ON S' CENTERS AND IN' ANGLE APART.. SON. JAI <br />EAGLE NC. <br />CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REWFORCING BARS <br />B DISTRIBUTION BOX: PRECAST RE ED CONCRETE BO' INSIDE DIAM R. DEPTH AS REOUIRED. SINGLE <br />WHEN INSTALLING THEM INTO EXISTING PRESTRESSED CONCRETE(PRE-ORPOST-TENSIONED). LOCATE THE <br />INLET TWELVE OUTLETS I-1? (MIN) LOWER THAN INLET 1' INLET AND F OUTLETS, CONCRETE WN6-WM <br />PRESTRESSED TENDONSBYUSINGANON-DESTRUCTIVE METHOOPRIOR TOINSTALLATIGN EXERCISE <br />COMPRESSIVE STRENGTH 30W PS AT N DAYS 21' GAS TM.HT CAST IRON RING AND BOLTED COVER M C. <br />EXTREME CARE AND CAUTION TO VOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION. <br />NOTTINGRAM PRECAST. JEMSEN <br />MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REWFORCEMENTAND THE DRILLEDPW ANCHOR <br />AAC OR PIN, <br />1. ALL MECHANICAL, PLUMBING AND ELECTRICAL COMPONENTS SHALL BE ANCHORED AND INSTALLED PER THE <br />9 TESTS: PERFORM ALL TESTS AS REQUIRED BY APPLICABLE CODES IN PRESENCE Of PROJECT INSPECTOR. <br />1'—TT MM FR uL <br />•'� <br />DETAILSONTIEDSAAPPROVEDCONSTRUCTIONDOCUMENTS- WHERETHERENODETAILISINDICATED,TME <br />FOLLOWING COMPONENTS SHALL BEANCHORED OR BRACED TO MEET THE FORCEAND DISPLACEMENT <br />_Tl.I ET <br />iwvNw <br />� AB AlGAI® <br />REOUIREMENTS PRESCRIBED IN THE 2016 CBC. SECTIONS 161BA1. 16 MROUGH IB16A1.26 AND ASCE 7-10 <br />CHAPTERS 13, M AND 30. <br />lY IN 211! Ifs-S;fW4 <br />RIHo <br />1. ALL PERMANENTEQUIPAIENTAND COMPONENTS. <br />IMMINIC . <br />r'� <br />N <br />J <br />2. TEMPORARY OR MOVABLE EQUIPMENT THATIS PERMANENTLYATTACHEO(EG. HARD WIRED) 10 THE <br />BUILDING UTILITY SERVICES SUCH AS ELECTRICITY GAS OR WATER. <br />y <br />3 MOVABLE EOOPMENT WHICH IS STATIONED IN ONE PLACE FOR MORE TINNN B HOURS AND <br />U <br />HEAVIER THAN 100 POUNDS ARE REQUIRED TO BE ANCHORED WITH TEMPORARY <br />ATTACHMENTS <br />_ <br />� aM NET <br />8 N S <br />WHET <br />PK <br />3i <br />K W mPTIMMIS, <br />PIPING, DUCTWORK. AND ELECTRICALDISTRIBUTION SYSTEMBRACWG NOTE <br />AM <br />WE <br />L TT <br />(rQy <br />}9 <br />PIPING, DUCTWORK, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO COMPLY WITH THE <br />W U U <br />FORCES NO DISPLACEMENTS PRESCRIBED W ASCE 740 SECTION 133 AS DEFINED IN ASCE 7-10 SECTION <br />J Q <br />136.& 13.8. T, 136.6.6 AND 2016 CBC SECTIONS 161&1.1.23 161"12/, 1616A, 1.2& 1616A. 1.28. <br />$IDE VIEW IEDWQOD 19HAOE 60MID5 <br />7,500 GALLON LOW PROFILE �'""�° " °""� <br />F <br />Lu 11 <br />THE METHOD OF SHOWING BRACING AND ATTACHMENTS TO THE STRUCTURE FOR THE IDENTIFIED <br />DISTRIBUTION SYSTEMAREAS NOTED BELOW WNENBRACINGANDATTACHMENTSAR MSEDONA <br />BATTERY SEPTIC TANK <br />d' O Q <br />ow ow <br />PREAPPROVED INSTALLATION GUIDE (EG., SMACNA OR OSHPD OPAL). COPIES OFTNE BRACING SYSTEM <br />R <br />DILL <br />INSTA TIONGODEORMANUALSHALLBEAVAILA6LEON THE JOBSITE PRIOR TO THE STARTOF AND DURING <br />THE HANGING AND BRACING OF THE DISTRIBUTION SYSTEMS THE STRUCTURAL ENGINEER OF RECORD SHALL <br />MODEL 3XJP= I•"P���T <br />TRAFFIC RATED <br />w <br />O <br />VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS. <br />...............______ ,.______________..___-___ .______.._____..______, <br />Z <br />MECHANICAL PIPING (MP). MECHANICAL DUCTS (AD), PLUMBING PIPING (PP): <br />000 000 000 <br />Y <br />MP0MDC1PP] OPTIONI: DETAILED ON THE APPROVED DRAWINGS WFTH PRODECTSPECIFIC <br />1 I. <br />m <br />NOTESANDOETAILS <br />---_ %�- •---%_______ ______ _I_--____. _.__J:_—. <br />Q y <br />MPOMOpPPM OPTION2' SHALL COMPLY WITH THE APPLICABLEOSHPO PREdPPROVAL MASON WEST <br />OPMM101}I3 <br />PLAN 14 <br />_ _ <br />O <br />K i <br />LL S <br />MP�MDOPP� OPTION 3: SHALL COMPLY WITHTHE SMACNA SEISMIC RESTRAINTMANUAL <br />�wFIE <br />[oRcR/IHECCWK)WED _TLS LI) (P) LIQUID CAPACITY: 7,500 GALLONS <br />OSHPD EDITION (2W9), INCLUDING ANY ADDENDA. FASTENERS <br />• TUM DESIGNED FOR NS20-11 TRAFFIC wHm LOAD NTH DRY SOL CONDITIONS. <br />PORTAlLE <br />AND OTHER ATTACHMENTS NOT SPECIFICALLYIDENTIFIED IN THE <br />SMACNA SEISMIC RESTRAIN MANUAL, OSHPD EDITION, ARE <br />(WATER TABLE mOW TAM(). EARTH MVEA OVER TMX NOT TO F)ILTLD 6 FT. <br />CWSSROOMS <br />DETAILED ON THE APPROVED DRAWINGS WITH PROJECT SPECFIC <br />-SUITABLE NATIVE OR SIB -BASE SHALL BE PREPARED TO HANDLE ANTICIPATED LOADS <br />nuMe)N6 srECs <br />NOTESANDOETAILS THEDETALLSSHALLACCOUNTFORTHE <br />APPLICABLE SEISMIC HAZARD LEVEL A AND CONNECTION LEVEL 1FOR <br />THE EXCAVATION SHALL BE BEDDED WITH SUITABLE GRANULAR MATERIAL AND SHALL <br />BE COMPACTED TO 90%MAXIMUM MY DENSITY, OR TO REQUIREMENTS OF THE PROJECT <br />s UETaIs <br />THE PROJECTAND CONDITIONS <br />GEOTECHNICAL ENGINEER. <br />• FOR COMPETE DESIGN AND PRDOUCT WORIIATIM 16EIR O <br />PRECAST. <br />�I`:CREMEI�T ) <br />6. ADSA CERTIFIED PROJECT INSPECTOR (CLASS 3) EMPLOYED BY THE DISTRICT 6 APPROVED BY DSA SHALL <br />CONTACT JENSEN <br />PROVIDE CONTINUOUS WSPECTICN OF THE WORK. THE DUTIES OF THE INSPECTOR ARE DEFINED IN SECTION <br />CLEANOUT TO GRADE DETAIL <br />1-33& PART 1. TITLE 21. CCR <br />7. A DSA ACCEPTED TESTNGLABORATORYD/RECRYEMROYEDBYTHEDISTRICTSHALJLCONOUCTALLTHE <br />REQUIRED TESTS AND INSPECTIONS FOR THE PROJECT. <br />- LAWRENCE <br />pq•O <br />LNGINlC0.1NG GROUP <br />rJ <br />