Laserfiche WebLink
PERMIT NO.: 1022-6SV.0147 <br />PERMITTEE: Ground Zero Analysis, Inc. <br />[SATE: March 9, 2022 <br />In accordance with General Provision No. 6, SEVEN (7) WORKING DAYS PRIOR to the start of <br />this work, Permittee shall notify the State Representative JOE VALDEZ at (209) 601-5074 or by <br />email: joseph.a.valdezdot.ca.aov, P.O. Box 2048, Stockton, CA 95201, if no traffic controls will be <br />needed to accomplish the permit work. A pre job meeting and/or conference with the <br />Permittee/Permittee's Contractor, and State Representative is required prior to start of work <br />unless waived by the State Representative, Permittee shall contact the State Representative and <br />arrange for the pre job meeting. <br />Notwithstanding General Provision No. 4, your Contractor is required to apply for and <br />obtain an encroachment permit prior to start of work. Contractor will be charged <br />applicable inspection fees. <br />This permit is not valid until Permittee has obtained permission from adjacent property <br />owners, Irrigation Districts, Cities, Counties or other interested parties to perform the <br />proposed work. <br />All work done under this permit must meet with the approval of the State Representative. <br />Failure on the Permittee's part to comply with any provision will be cause for revocation of this <br />permit. <br />Permittee shall, prior to commencement of any work, provide the State Representative with the <br />name and phone number of the person in responsible charge of the work to be performed under <br />this permit. <br />Before commencing work, Permittee must obtain written concurrence from the State Highway <br />Resident Engineer on the scheduling of the proposed work. This requirement is applicable when <br />the permit work is located within or adjacent to an active Caltrans construction work zone. <br />Permittee/Contractor shall work with the State representative to request traffic control <br />reservations for shoulder work and/or lane closure(s) needed to accomplish the work under this <br />permit. Requests shall be submitted to State representative by Monday Noon of the week <br />prior to when the work is scheduled to occur. <br />The State representative will submit the traffic control request(s) to District 10 Traffic Management <br />(DTM) using the Lane Closure System (LCS). Upon LCS approval by DTM, the State <br />representative will forward the traffic control ID back to the Permittee/Contractor by Friday <br />afternoon of the week prior to the scheduled work. No shoulder or lane closures are allowed <br />without prior LCS approval. <br />All Lane closures shall be called in by either the Permittee or the Permittee's Contractor, <br />whichever is agreed upon. This shall be accomplished when jobsite traffic control is set, and then <br />again when removed for the day. The assigned traffic control ID provided shall be called into the <br />District 10 Traffic Management Center (TMC). The traffic control status codes are: <br />• 10-97 when traffic control begins <br />• 10-98 when traffic control ends <br />• 10-22 when traffic control is cancelled <br />2of6 <br />