ROOM FINISH SCHEDULE GENERAL NOTES
<br /> WALLS 1 THE UNDERSIDE OF THE EXPOSED ROOF& FLOOR STRUCTURE TO BE PAINTED
<br /> ROOM# ROOM NAME FLOOR CEILING REMARKS THROUGHOUT. ALL EXPOSED NEW AND EXISTING SURFACES,STRUCTURAL
<br /> NORTH EAST SOUTH WEST MEMBERS, DUCTS, PIPES,SHEATHING, BACKING, ETC.TO BE PAINTED, PAINT Stu
<br /> dz FINISH BASE MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH COLOR PT-C. CONSULT WITH ARCHITECT IN FIELD WITH ANY QUESTIONS.
<br /> 0 2 ALL EXISTING GUARDRAILS AND HANDRAILS TO BE PAINTED U.O.N.,PAINT
<br /> ~ FIRST FLOOR COLOR PT-2.CONSULT WITH ARCHITECT INFIELD WITH ANY QUESTIONS. d
<br /> U
<br /> 100 LOBBY VCT-1/CPT-2 WB-1 GWB PT-6 * GWB PT-6 * GWB PT-6 * GWB PT-6 * E-GWB/GWB-1 PT-7 *WALL PAINTACCENT WHERE OCCURS;SEE INTERIOR ELEVATIONS 3 WHERE EXISTING SURFACES ARE TO REMAIN, REPAINT, REPAIR AND REFINISH
<br /> 101 RECEPTION/ADMIN. CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 E-GWB/GWB-1/ACT-1 PT-7 *WALLPAINTACCENTWHEREOCCURS;SEEINTER]ORELEVATIONS THE EXISTING SURFACES SO AS TO BEST MATCH NEW FINISHES FORA 0
<br /> U) 102 MEETING CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 UNIFORM AND EVEN APPEARANCE. �1 0
<br /> LU 4 PROTECT ALL(E)SURFACES TO REMAIN DURING DEMOLITION. PATCH IN (N) ��I( li trQ�tu rn
<br /> � 103 OPEN OFFICE CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-Z A U ll
<br /> w 103A OFFICE CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 CLEANLY SO AS TO BEST MATCH (E) FOR A UNIFORM AND EVEN APPEARANCE.
<br /> W 1038 OFFICE CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 5 PRIOR TO INSTALLING ANY FLOORING MATERIAL(E)SLAB SHALL BE TESTED FOR
<br /> LU 103C STORAGE CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 MOISTURE AND ALKALINITY TO ASSURE THEY ARE WITHIN MANUFACTURER'S
<br /> J 103D OFFICE CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 RECOMMENDATIONS. IF THEY DO NOT MEET THE RECOMMENDATIONS,A 110 LINDEN STREET I OAKLAND,CA 194607
<br /> m 510.836.6594 1 studiobondy.com
<br /> Q 104 CLASSROOM VCT-1jVCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 MANUFACTURER RECOMMENDED SEALER SHALL BE APPLIED.
<br /> U 105 CLASSROOM VCT-1 jVCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1
<br /> J 106 CLASSROOM VCT-1 j VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 6 REMOVE(E) RUBBER BASE,WHERE OCCURS,AND REPLACE W/NEW BASE PER
<br /> w
<br /> 0 107 CLASSROOM VCT-1/VCT-2/CPT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 SCHEDULE.
<br /> Q 107A RESTROOMS CT-2/GRT-2 CT-3/GRT-1 GWB/CT PT-7 j CT-1 */GRT-1 GWB PT-7 J CT-1 *J GRT-1 GWB PT-7/CT-1 *J GRT-1 GWB PT-7/CT-1 */GRT-1 GWB-1 PT-7 CERAMIC TILE WAI NSCOT;*ACCENT COLORS CT4 THRU CT-7;SEE BOYS' RESTROOMS INTERIOR ELEVTI ONS FOR COLOR SCHEME SAMPLE
<br /> 0 108 CLASSROOM VCT-1 j VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB/CT PT-6/CT-1/CT-4/GRT-1 GWB PT-6 ACT-1 CERAMI C TI LE AT SI NK WALL, *ACCENT COLORS CT4 THRU CT-7;SEE I INTER 10 R ELEVATIONS A B B R E V I A T 1 0 N S
<br /> U_ 109 CLASSROOM VCT-1 jVCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 ASPIRE
<br /> 110 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 KEY DESCRIPTION
<br /> Q 111 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1
<br /> z 112 FUTURE SERVERY RF-1 WB-2 GWB/ FRP PT-7/FRP-1 GWB/FRP PT-7/FRP-1 GWB/FRP PT-7/FRP-1 GWB/ FRP PT-7/FRP-1 ACT-3 FRP-1 ON ALL WALLS;SEE INTERIOR ELEVATIONS AB ACOUSTIC BOARD STOCKTON
<br /> Q 113 CAFETERIA VCT-3/VCT-3A WB-1 GWB PT-6 * GWB PT-6 * GWB PT-6 * GWB PT-6 * ACT-1 ACP ACOUTICAL CEILING PANEL,SUSPENDED
<br /> 113A STORAGE VCT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 E-GONG PT-6 GWB-1 PT-7 ACT ACOUSTICAL CEILING TILE,SUSPENDED BB BUTCHER BLOCK ELEMENTARY
<br /> 0 114 SP EC I AL ED.C LASSRO 0 M VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1
<br /> U
<br /> LU 114A MEETING CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 CB CEMENT BOARD SCHOOL
<br /> 0 114B MEETING CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 CK CORK WALLCOVERING
<br /> Of 115 (E) ELEVATOR RU-1 N/A PLAM PLAM-3 PLAM PLAM-3 PLAM PLAM-3 PLAM PLAM-3 NO PAINTED FINISHES CPT CARPET
<br /> 0- 116 (E) MECH. CONC-1 WB-1 * E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-7 * REPAIR/REPLACE EXISTING WALL BASE AS NEEDED CONC CONCRETE
<br /> LU 117 CIRCULATION VCT-1/ACCENTS * WB-1 GWB PT-6 * GWB PT-6 * GWB PT-6 * GWB PT-6 * ACT-1 *WALL PAI NTACC ENT WHERE0CCU RS;SEEINTER10RELEVATI0NS CT CERAMIC TILE PROJECT NO:: 2013.00
<br /> F- 118 CIRCULATION VCT-1/ACCENTS* WB-1 GWB PT-6 * GWB PT-6 * GWB PT-6* GWB PT-6 * ACT-1 *WALL PAI NTACC ENT WHERE0CCU RS;SEEINTER10RELEVATI0INS (E) EXISTING
<br /> 0 119 RESTROOM CT-2/GRT-2 CT-3/GRT-1 GWB/CT PT-7/CT-1/GRT-1 GWB J CT PT-7/CT-1 J GRT-1 GWB/CT PT-7/CT-1/GRT-1 GWB/CT PT-7/CT-1/GRT-1 GWB-1 PT-7 CERAMIC TILE WAI NSCOT;SEE INTERIOR ELEVATIONS EP EPDXY LABTOP 1605 EAST MARCH LANE I STOCKTON,CA 195210
<br /> * * * * * EXP EXPOSED TO STRUCTURE AND DECK P:000.000.0000 I F:000.000.0000
<br /> 120 GIRLS' RESTRDDMS CT-2/GRT-2 CT-3/GRT-1 GWB/CT PT-7/CT-1 GRT-1 GWB J CT PT-7 J CT-1 /GRT-1 GWB J CT PT-7/CT-1 /GRT-1 GWB J CT PT-7 j CT-1 j GRT-1 GWB-1 PT-7 CERAMIC TILE WAINSCOT; ACCENT COLORS CT4 THRU CT-7;SEE BOYS' RESTROOMS INTERIOR ELEVTIONS FOR COLOR SCHEME SAMPLE
<br /> Ir 121 BOYS' RESTRODMS CT-2 J GRT-2 CT-3/GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB J CT PT-7/CT-1 */GRT-1 GWB-1 PT-7 CERAMIC TILE WAI NSCOT;*ACCENT COLORS CT4 THRU CT-7;SEE BOYS' RESTROOMS INTERIOR ELEVTIONS FOR COLOR SCHEME SAMPLE FRP FIBERGLASS REINFORCED PLASTIC PANEL
<br /> LL 122 (E) I.T. CONC-1 WB-1 * E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-7 * REPAIR/REPLACE EXISTING WALL BASE AS NEEDED GL GLASS
<br /> LU 123 (E)JANITOR CONC-1 WB-1 * E-GWB/ FRP PT-7/FRP-1 E-GWB/FRP PT-7/FRP-1 E-GWB/FRP PT-7/FRP-1 E-GWB/FRP PT-7/FRP-1 E-GWB PT-7 * REPAIR/REPLACE EXI STI NG WALL BASE AS NEEDED GR SUSPENDED CURVED GYPSUM REFLECTOR CLOUD
<br /> 124 (E) ELECTRICAL CONC-1 WB-1 * E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-7 * REPAIR/REPLACE EXISTING WALL BASE AS NEEDED GWB GYPSUM WALLBOARD
<br /> cn 125 STORAGE/BIKES VCT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 GWB-1 PT-7 LI LINOLEUM STRUCTURAL ENGINEER
<br /> z 126 GIRLS' RESTROOMS CT-2 J GRT-2 CT-3/GRT-1 GWB J CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB-1 PT-7 CERAMIC TI LE WAI NSCOT;*ACCENT COLORS CT4 THRU CT-7;SEE BOYS' RESTROOMS I INTERIOR ELEVTI ONS FOR COLOR SCHEME SAMPLE LT LINOLEUM TILE
<br /> 127 BOYS' RESTRDDMS CT-2/GRT-2 CT-3/GRT-1 GWB/CT PT-7 J CT-1 *J GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB-1 PT-7 CERAMIC TI LE WAI NSCOT;*ACCENT COLORS CT4 THRU CT-7;SEE BOYS' RESTROOMS I NTERIOR ELEVTI ONS FOR COLOR SCHEME SAMPLE PLAM PLASTIC LAMINATE PEOPLES ASSOCIATE
<br /> cn STRUCTURAL ENGINEERS
<br /> PT PAINT 1150 CAMPBELL AVE, SAN JOSE, CA 95126
<br /> 0 S E C O N p FLOOR RB RESILIENT BASE CONTACT: MICHAEL DEIGERT
<br /> 201 CONFERENCE ROOM CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 RF RESILIENT FLOORING 408.957.9220 x 108 P
<br /> 202 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 RT RESILIENTTILE E-MAIL: mdeigert@pase.com
<br /> } 203 CLASSROOM VCT-1 jVCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 RU RUBBER FLOORING
<br /> Q 204 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 SLR SEALER,CLEAR
<br /> w 205 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 SS STAINLESS STEEL CIVIL ENGINEER
<br /> 206 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 ST STONE TILE SIEGFRIED
<br /> J 207 MEETING CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 TB TACKBOARD 3428 BROOKSIDE ROAD
<br /> Q 208 TEACHER'S BREAK ROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-2 TE TECTUM CEILING PANEL STOCKTON, CA 95825
<br /> zCONTACT: ADAM MERRIL
<br /> 0 209 OFFICE CPT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-Z TT TRAFFIC TOPPING
<br /> 210 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 UP UPHOLSTERY 209.943.2021 P
<br /> E-MAIL: amerrill@siegfriedeng.com
<br /> Q 211 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 VCT VINYL COMPOSITION TILE
<br /> zof 212 CLASSROOM VCT-1 jVCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 WD WOOD
<br /> LU 213 CLASSROOM VCT-1jVCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 N.I.C. NOT IN CONTRACT LANDSCAPE ARCHITECT
<br /> z 214 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1
<br /> zSIEGFRIED
<br /> — 215 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 3428 BROOKSIDE ROAD
<br /> 0 216 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1
<br /> z STOCKTON, CA 95825
<br /> Q 217 CLASSROOM VCT-1/VCT-2 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 ACT-1 CONTACT: ROBERT NORBUTAS
<br /> U) 218 CIRCULATION VCT-1jVCT-2 WB-1 GWB PT-6 * GWB PT-6 * GWB PT-6* GWB PT-6 * ACT-1 *WALL PAI NTACC ENT WHERE0CCU RS;SEEINTER10RELEVATI0NS 209.943.2021 P
<br /> 219 CIRCULATION VCT-1/VCT-2 WB-1 GWB PT-6 * GWB PT-6 * GWB PT-6 * GWB PT-6 * ACT-1 *WALL PAI NT ACC ENT W H E R E 0 CCU RS;S EE INTERIOR ELEVATIONS E-MAIL: bnorbutas@siegfriedeng.com
<br /> Q 220 (E)JANITOR CONC-1 WB-1 * E-GWB/ FRP PT-7/FRP-1 E-GWB J FRP PT-7/FRP-1 E-GWB/FRP PT-7/FRP-1 E-GWB J FRP PT-7/FRP-1 E-GWB PT-7 * REPAIR/REPLACE EXISTING WALL BASE AS NEEDED
<br /> J 221 RESTROOM CT-2/GRT-2 CT-3/GRT-1 GWB/CT PT-7/CT-1/GRT-1 GWB/CT PT-7 J CT-1/GRT-1 GWB/CT PT-7/CT-1/GRT-1 GWB/CT PT-7/CT-1 j GRT-1 GWB-1 PT-7 CERAMIC TILE WAI NSCOT;SEE INTERIOR ELEVATIONS
<br /> = 222 GI RLS' RESTROOMS(GRADES K-2) CT-2/GRT-2 CT-3/GRT-1 GWB J CT PT-7/CT-1 */GRT-1 GWB J CT PT-7/CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB J CT PT-7/CT-1 */GRT-1 GWB-1 PT-7 CERAMIC TILE WAI NSCOT;*ACCENT COLORS CT4 THRU CT-7;SEE BOYS' RESTROOMS INTERIOR ELF-,TIONS FOR COLOR SCHEME SAMPLE MECHANICAL
<br /> 0 223 BOYS' RESTRO0MS(GRADES K-2) CT-2/GRT-2 CT-3/GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB J CT PT-7 J CT-1 */GRT-1 GWB/CT PT-7/CT-1 */GRT-1 GWB J CT PT-7/CT-1 */GRT-1 GWB-1 PT-7 CERAMIC TILE WAI NSCOT;*ACCENT COLORS CT4 THRU CT-7;SEE BOYS' RESTROOMS INTERIOR ELEVTIONS FOR COLOR SCHEME SAMPLE MODERN AIR MECHANICAL
<br /> 224 (E) ELECTRICAL CONC-1 WB-1 * E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-7 * REPAIR/REPLACE EXIST]NG WALL BASE AS NEEDED 2200 COOPER AVENUE
<br /> a 225 (E) I.T. CONC-1 WB-1 * E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-6 E-GWB PT-7 * REPAIR/REPLACE EXISTING WALL BASE AS NEEDED MERCED, CA 95344
<br /> 0 226 STORAGE VCT-1 WB-1 GWB PT-6 GWB PT-6 GWB PT-6 GWB PT-6 GWB-1 PT-7 CONTACT: MARK LEITING
<br /> U 209.722.0076 P
<br /> U) E-MAIL:mleiting@modernair.biz
<br /> FINISH SCHEDULE KEY
<br /> AREA KEY LOCATION FINISH DESCRIPTION VENDOR/MFR. PRODUCT SPECIFICATION /COLOR PROPERTIES/INSTALLATION REMARKS ELECTRICAL
<br /> U) NORTH STATE ELECTRICAL CONTRACTORS
<br /> w FLOOR CPT-1 ADMIN AREAS(OFFICE, MEETING, ETC.) CARP ET TI LE SHAW CONTRACT GROUP STYLE:VAST TILE 5T009;COLOR: BOUNDLESS 09485;24"X24" QUARTER-TURN SCOTT JACOBS
<br /> 11101 WHITE ROCK ROAD
<br /> CPT-2 ENTRIES/CLASSROOM 107 WALK-OFF CARPET TILE SHAW CONTRACT GROUP STYLE:PORTAL TILE 5T035;COLOR: LAVA 34549;24"X24" MONOLITHIC RANCHO CORDOVA, CA 95670
<br /> z
<br /> Z) RF-1 FUTURE SERVERY NON-SLI P RESI LI ENT FLOORING ALTRO FLOORING ALTRO STRONGHOLD 30;COLOR:TBD w/ INTEGRAL COVE CONTACT: SCOTT JACOBS
<br /> >_ VCT-1 CIRCULATION/CLASSROOMS PERIMETER BORDER/STORAGES VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR: FIELD GRAY 51927; 12"X12" 916.462.0817 P
<br /> 00 VCT-2 CLASSROOMS VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR:SOFT WARM GRAY 51861; 12"X12" E-MAIL: scott@northstate-eci.com
<br /> LU PLUMBING
<br /> �
<br /> VCT-3 CAFETERIA VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR:50FT000LGRAY51860; 12"X12" PRO-TEC PLUMBING
<br /> w SEE FINISH FLOOR PLANS AND FINISH FLOOR
<br /> CONTACT: ED BOSOUE
<br /> 0 VCT-3A CAFETERIA PERIMETER BORDER VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR:STERLING 51904; 12"X12" COLOR SCHEMES 916.337.2138 P
<br /> VCT-4 ACCENT TI LE/CIRCULATION VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR: RUBY RED 57534; 12"X12" E-MAIL: ed@protecplumbing@net
<br /> a VCT-5 ACCENT TI LE/CIRCULATION VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR: KICKIN' KIWI 57510; 12"X12"
<br /> VCT-6 ACCENT TI LE/CIRCULATION VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR: LEMON LICK 57509; 12"X12"
<br /> ~ VCT-8 ACCENT TI LE/CIRCULATION VINYL COMPOSITION TILE ARMSTRONG FLOORING STYLE:STANDARD EXCELON IMPERIALTEXTURE, COLOR:VICOTIRA BLUE 59230; 12"X12"
<br /> 0 CT-2 RESTROOMS CERAMIC TILE DALTI LE D208 SUEDE GRAY SPECKLE;2"X2" MOSAIC INSTALL WITH GRT-2
<br /> Q GRT-2 RESTROOMS FLOOR TI LE GROUT CUSTOM BUILDING PRODUCTS DOVE GRAY#370; I NSTALL WITH CT-2
<br /> CONC-1 UTILITY ROOMS TO REMAI N(SEE PLAN) EXISTING CONRETE; FINISH W/SEALANT
<br /> RU-1 INTERIOR STAIRS RUBBER THREAD AND RISER BURKE FLOORING RESI U ENT THERMOSET RUBBER(TS)STAIR TREAD, ENDURA ROUND RAISED DIS PATTERN W/ INTERGRATED RISER; REVIEWED FOR CODE COMPLIANCE
<br /> o (SOLID COLOR): COLOR: 523 BLACKBROWN W/2"CONTRASTING STRIPE COLOR ABRASIVE January 13, 2022
<br /> GRIT STRIP BUREAU VERITAS NORTH AMERICA, INC.
<br /> RU-2 INTERIOR STAIRS LANDINGS/ELEVATOR CABIN RUBBER FLOORING BURKE FLOORING ENDURA ROUND RAISED DISC PATTERN (SOLID COLOR);COLOR:523 BLACKBROWN
<br /> Y
<br /> 0 WALL PT-1 SEE EXTERIOR ELEVATIONS A3.01-A3.03
<br /> 3: PT-2 SEE EXTERIOR ELEVATIONS A3.01-A3.03
<br /> U) PT-3 SEE EXTERIOR ELEVATIONS A3.01-A3.03
<br /> = PT-4 SEE EXTERIOR ELEVATIONS A3.01-A3.03 BUILDING PERMIT
<br /> ~ PT-5 SEE EXTERIOR ELEVATIONS A3.01-A3.03
<br /> z
<br /> PT-6 INTERIOR WALLS,TYP. WALL PAI NT BENJAMIN MOORE COLOR PREVIEW SW ISS COFFEE OC-45 EGGSHELL SHEEN, U.O.N.
<br /> W PT-7 RESTROOM WALLS.TYP. WALL PAINT BENJAMIN MOORE COLOR PREVIEW SWISS COFFEE OC-45 SEMI-GLOSS SHEEN. U.O.N.
<br /> = PT-8 EXISTING INTERIOR DOOR FRAMES& DOORS LEAFS TO REMAIN,TYP PAI NT BENJAMIN MOORE CLASSIC COLORS SWISS COFFEE OC-45 SEMI-GLOSS SHEEN, U.O.N. MATCH TYP.WALL
<br /> CD
<br /> PT-9 HM. DOOR& WINDOW FRAMES,TYP.;STAIR STRINGER,GUARDRAIL, PAINT BENJAMIN MOORE CLASSIC COLORS EBONY SLATE 2118-30 SEMI-GLOSS SHEEN, U.O.N.
<br /> } HANDRAIL ANDALL EXPOSED METAL WORK FOR VERTICAL PERMIT SUBMITTAL 09.01.2021
<br /> CIRCULATION,SEE VERTICAL CIRCULATION DETAILS
<br /> 0- PT-10 DOOR LEAF (OTHER THAN CLASSROOMS) PAINT ACCENT COLOR BENJAMIN MOORE CLASSIC COLORS SEA LIFE 2118-40 SEMI-GLOSS SHEEN, U.O.N.
<br /> PT-11 DOOR LEAF (CLASSROOM) PAINT ACCENT COLOR BENJAMIN MOORE CLASSIC COLORS MILLION DOLLAR RED 2003-10 SEMI-GLOSS SHEEN, U.O.N.
<br /> Of EACH NEW DOOR LEAF WI LL BE PAINTED AS AN ACCENT COLOR: PT11 THRU PT-14 (SEE
<br /> a PT-12 DOOR LEAF (CLASSROOM) PAI NT ACCENT COLOR BENJAMIN MOORE CLASSIC COLORS AMERICAN CHEESE 2019-10 SEMI-GLOSS SHEEN. U.O.N. CIRCULATION 118 INTERIOR ELEVATIONS FOR COLOR SCHEME SAMPLE)
<br /> PT-13 DOOR LEAF (CLASSROOM) PAI NT ACCENT COLOR BENJAMIN MOORE CLASSIC COLORS BLUEBERRY HILL812 (OR SIM.;CONFIRM W/ARCHITECT) SEMI-GLOSS SHEEN, U.O.N.
<br /> Q PT-14 DOOR LEAF (CLASSROOM) PAI NT ACCENT COLOR BENJAMIN MOORE CLASSIC COLORS HUNTINGTON GREEN 406 (OR SIM.;CONFIRM W/ARCHITECT) SEMI-GLOSS SHEEN, U.O.N.
<br /> PT-15 INTERIOR WALLS,CIRCULATION WALL PAI INT ACCENTCOLOR BENJAMIN MOORE CLASSIC COLORS AMERICAN CHEESE 2019-10 EGGSHELLSHEEN, U.O.N.
<br /> U
<br /> PT-16 INTERIOR WALLS,CIRCULATION WALL PAI INT ACCENTCOLOR BENJAMIN MOORE CLASSIC COLORS METRO GRAY 1459 EGGSHELLSHEEN, U.O.N.
<br /> J PT-17 INTERIOR WALLS,CIRCULATION WALL PAI INT ACCENTCOLOR BENJAMIN MOORE CLASSIC COLORS HUNTINGTON GREEN 406 (OR SIM.;CONFIRM W/ARCHITECT) EGGSHELLSHEEN, U.O.N.
<br /> u' PT-18 ONE INTERIOR WALL AT STAIR-1 WALL PAI INT ACCENTCOLOR BENJAMIN MOORE CLASSIC COLORS COLOR:TBD EGGSHELLSHEEN, U.O.N. SEE FLOOR PLANS AND INTERIOR ELEVATIONS
<br /> z PT-19 ONE INTERIOR WALL ATSTAIR-2 WALL PAI INT ACCENTCOLOR BENJAMIN MOORE CLASSIC COLORS COLOR:TBD EGGSHELLSHEEN, U.O.N. SEE FLOOR PLANS AND INTERIOR ELEVATIONS
<br /> WB-1 I INTER OR WALLS,TYP., U.O.N. RUBBER WALL BASE BURKE FLOORING 4" RUBBER WALL BASE TYPE TP W/MOLDED CORNERS;COLOR:523 BLACKBROWN W/TOED PROF)LE
<br /> = WB-2 FUTURE SERVERY I NTEG RAL COVE BASE ALTRO FLOORING ALTRO STRONGHOLD 30;COLOR:TBD* INSTALL WITH EP-1 ��� �SED ARCy�
<br /> CT-1 RESTROOMS/CLASSROOM 108 CERAMIC TILE FIELD COLOR DALTI DESERT GREY X114;SEMI-GLOSS COLLECTION;4 X 4 1 NSTALL WITH GRT-1 AT TOP OF WAINSCOT AND WALL CONER, USE BULLNOSE TRIM TILE S A.
<br /> O FC
<br /> o CT-3 RESTROOMS/CLASSROOM 108 CERAMIC TI LE FLATTOP COVED BASE DALTI LE DESERT GREY X114;SEMI-GLOSS COLLECTION; 12 X 4 1 NSTALL WITH GRT-1 USE FLATTOP COVED BASE; USE BULLNOSE TRIM TILE LEFT/RIGHT WERE EXPOSED,AND AS 33 _
<br /> a APPLICABLE
<br /> U) CT-4 RESTROOMS/CLASSROOM 108 CERAMIC TI LE ACCENT COLOR DALTI LE SUNFLOWER DH50;SEMI-GLOSS COLLECTION; INSTALL WITH GRT-1 EXP:02/28/23
<br /> CT-5 RESTROOMS CLASSROOM 108 CERAMIC TI LE ACCENT COLOR DALTI LE
<br /> CT-6 RESTROOMS/CLASSROOM 108 CERAMIC TI LE ACCENT COLOR DALTI LE KEY Lf
<br /> IME 1098;SEMI-GLOSS COLLES EM I-GLOSS CO CTII0 N;4 X 4 1 INSTALL W I TH G RT-1 SCTTERED PATTERN ACCENT COLORS CT-4 THRU CT-7 (SEE INTERIOR BOYS' RESTROOMS 121
<br /> ON;4 X 4 1 NSTALL WITH GRT-1 INTERIOR IOR E E ATIONS FOR COLORS SCHEME SAMPLE)
<br /> o 0�
<br /> CT-7 RESTROOMS/CLASSROOM 108 CERAMIC TI LE ACCENT COLOR DALTI LE GALAXY 1469;SEMI-GLOSS COLLECTION;4 X 4 1 NSTALL WITH GRT-1
<br /> GRT-1 RESTROOMS/CLASSROOM 108 WALL TI LE GROUT CUSTOM BUILDING PRODUCTS DRIFTWOOD#543
<br /> 0
<br /> U FRP-1 SERVERY/STORAGES FIBER REINFORCED PANEL INNOVATIVE FINISHES LI NENTEXTURE LINE/COLO R:TBD
<br /> J E-GWB UTILITY ROOMS TO REMAIN(SEE PLAN) EXSITING GWB PARTITIONS, PAINT
<br /> a E-CO INC STORAGE 113A EXSITING CONCRETE WALL, PAINT
<br /> U)
<br /> z CEILING ACT-1 SEE FINISH SCHEDULE&A6.01 ACO USTI CAL C El LI NG TILE CERTAINTEED SYMPHONY F NARROW REVEAL EDGE;24"X24'; 1" PANEL
<br /> 0 ACT-2 ADMIN AREAS(OFFICE, MEETING, ETC.) ACO USTI CAL C El LI NG TILE CERTAINTEED SYMPHONY M NARROW REVEAL EDGE;24"X24";3/4" PANEL
<br /> w
<br /> ACT-3 FUTURE SERVERY STAIN-RESISTANT FIBERGLASS CEILING PANEL(CLEANABLE) CERTAINTEED PERFORMA VOC COMPLIANT RX SYMPHONY F; 24"X24'; 1" PANEL N.T.S.
<br /> � GWB-1 RESTROOMS/SOFFITS GYPSUM WALL BOARD CITY O F STOCKTON
<br /> E-GWB MAIN ENTRY/UTILITY ROOMS WITH CEILING TO REMAIN (SEE GYPSUM WALL BOARD
<br /> w
<br /> REFLECTED CEILING PLANS) APPROVED PLANS FINISH SCHEDULE
<br /> = MILLWORK PLAM-1 CASEWORK COUNTERTOP AND BAC KSPLAS H,TYP. PLASTIC LAMINATE WILSON ART COLOR:T.B.D. By:rflores Date:01/19/2022
<br /> U
<br /> Of PLAM-2 CASEWORK CABINETS,TYP. PLASTIC LAMINATE WILSON ART COLOR:T.B.D.
<br /> Q PLAM-3 ELEVATOR CAB IN WALLS P LASTI C LAM I NATE WILSON ART CO LO R:T.B.D. (EXCERPT FROM BUILDING
<br /> o WD-1 RECPETION DESK/INTERIOR STAIRS GUARDRAILCAP WOOD MAPLE;QUARTER SAWN;CLEAR FINISH
<br /> z
<br /> PERMIT NO. BP21 -06913;
<br /> 0
<br /> In FOR REF.)
<br /> 0
<br /> Aluouw0
<br />
|