AIR DISTRIBUTION DEVICE SCHEDULE MECHANICAL GENERAL NOTES MECHANICAL LEGEND
<br /> MANUFACTURER FRAME BLOW 1. SCOPE: DESCRIPTION SYMBOL .00
<br /> MK. NO. & MODEL# TYPE PATTERN OBD REMARKS r ■A REMODEL OF THE HVAC SYSTEM, INCLUDING MECHANICAL EQUIPMENT& DUCTWORK AS Stu CI I �
<br /> z CS-1 NAILOR#7500-L 24x24 LAY-IN SEE PLAN NO MODULAR CORE, ROUND NECK, #26 OFF WHITE FINISH GENERALLY DELINEATED ON THE DRAWINGS. EQUIPMENT SHALL COMPLY WITH TITLE 24 SUPPLY AIR DUCT SECTION ® SA
<br /> O CALIFORNIA CODE OF REGULATIONS. RETURN AIR DUCT SECTION RA
<br /> CS-2 NAILOR#7500-S SURFACE SEE PLAN NO MODULAR CORE, ROUND NECK, #26 OFF WHITE FINISH 2. CODES:
<br /> v WS-1 NAILOR#51 DH SURFACE SEE PLAN NO #26 OFF WHITE FINISH ALL WORK MATERIAL AND EQUIPMENT SHALL BE FURNISHED AND INSTALLED IN COMPLIANCE
<br /> DUCT SIZE NET INSIDE DIMENSION zx8 zxs
<br /> C�V
<br /> 0f WITH THE FOLLOWING CODES AS ADOPTED AND AMENDED BY THE INSPECTING AUTHORITY EXHAUST AIR DUCT SECTION ® EA
<br /> CR-1 NAILOR#4360-L 24x24 LAY-IN --- NO ROUND NECK, #26 OFF WHITE FINISH SPLITTER DAMPER W/LOCKING QUADRANT
<br /> HAVING JURISDICTION. NOTHING IN THESE PLANS SHALL BE CONSTRUED TO PERMIT THE
<br /> CR-2 NAILOR#4360-S SURFACE --- NO SQUARE NECK, #26 OFF WHITE FINISH INSTALLATION OF WORK, MATERIAL OR EQUIPMENT NOT CONFORMING TO THESE OR OTHER Architecture
<br /> w FLEXIBLE DUCT CONNECTION �N
<br /> [If CODES APPLICABLE TO THIS PROJECT:CE-2 NAILOR#4360-S SURFACE --- NO ROUND NECK, #26 OFF WHITE FINISH DUCT DROP/RISE
<br /> w
<br /> A. 2019 CALIFORNIA ADMINISTRATIVE CODE (CAC) PART 1, TITLE 24, CALIFORNIA CODE OF DOOR LOUVER
<br /> REGULATIONS (CCR) AIR EXTRACTOR
<br /> LU B. 2019 CALIFORNIA BUILDING CODE (CBC) PART 2, TITLE 24, CCR BASED ON THE 2018
<br /> J INTERNATIONAL BUILDING CODE (IBC) ACCESS DOOR-A.D. AD 110 LINDEN STREET OAKLAND,CA 1 94607
<br /> 00 C. 2019 CALIFORNIA ELECTRICAL CODE (CEC) PART 3, TITLE 24, CCR BASED ON THE 2017 VOLUME DAMPER W/LOCKING QUADRANT5 10.836.6594 I stud i o b o n d y.c o m
<br /> EXHAUST FAN SCHEDULE VD
<br /> NATIONAL ELECTRICAL CODE (NEC) AUTO MOTORIZED CONTROLLED DAMPER MD MD-
<br /> _J
<br /> DJ D. 2019 CALIFORNIA MECHANICAL CODE (CMC) PART 4, TITLE 24, CCR BASED ON THE 2018
<br /> e_ MK. NO. MANUFACTURER DESCRIPTION CFM FAN SONES S.P. MOTOR ELECTRICAL OP. DBA REMARKS UNIFORM MECHANICAL CODE (UMC) FIRE DAMPER/CEILING FIRE DAMPER FD FD11M
<br /> a_ & MODEL# RPM POWER VOLT PH WEIGHT E. 2019 CALIFORNIA PLUMBING CODE (CPC) PART 5, TITLE 24, CCR BASED ON THE 2018 MOTORIZED FIRE/SMOKE DAMPER 777-
<br /> FSD FSD
<br /> Q EF-1 GREENHECK#SQ-99-VG INLINE EXHAUST FAN 530 1582 11.6 0.75" 1/4 HP 115 1 58 LBS 59 SEE NOTE#1 UNIFORM PLUMBING CODE (UPC)
<br /> EF-2 GREENHECK#SQ-99-VG INLINE EXHAUST FAN 400 1676 11.9 1.0" 1/4 HP 115 1 58 LBS 59 SEE NOTE#1 F. 2019 CALIFORNIA ENERGY CODE (CEC) PART 6, TITLE 24 CCR. 1 ST LETTER- LOCATION C-CEILING f
<br /> LL G. 2019 CALIFORNIA FIRE CODE (CFC) PART 9, TITLE 24, CCR BASED ON THE 2018 W-WALL
<br /> CEF-1 GREENHECK#CSP-A250 CEILING EXHAUST FAN 230 1000 2.0 0.3" 63 WATT 115 1 23 LBS 38 SEE NOTE#1 INTERNATIONAL FIRE CODE (IFC) F-FLOOR ASPIRE
<br /> Q NOTES: H. 2019 CALIFORNIA GREEN BUILDING STANDARDS (CGBSC) PART 11, TITLE 24, CCR
<br /> D 1. INTERLOCK WITH LIGHT SWITCH. PROVIDE WITH BACKDRAFT DAMPER. CS-5 CS-5
<br /> z 300 CFM 300 CFM STOCKTON
<br /> Q 3. WORKMANSHIP: 2ND LETTER-SERVICE S-SUPPLY 12x12 12x12
<br /> ALL WORKMANSHIP SHALL BE DONE IN A NEAT AND ORDERLY MANNER ACCORDING TO THER-RETURN
<br /> BEST TRADE PRACTICE BY THOSE SKILLED IN THE PARTICULAR TRADE. EQUIPMENT, DUCTS, E-EXHAUST ELEMENTARY
<br /> v GRILLES, ETC., SHALL BE PLUMB, LEVEL, SQUARE OR CENTERED ETC., TO GIVE A NEAT AND
<br /> w VAV BOX/REHEAT COIL SCHEDULE PLEASING APPEARANCE. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH
<br /> SCHOOL
<br /> MANUFACTURER UNIT INLET OUTLET CFM AIR WATER WEIGHT NOTES
<br /> MANUFACTURER'S RECOMMENDATIONS.
<br /> O NUMBER 5-SEE SCH WS-1
<br /> REHEAT COIL 4. AVAILABLE POWER: FOR TYPE 300 CFM
<br /> e_ MK. NO. & MODEL# SIZE SIZE SIZE PD PD EWT LWT EAT LAT ROWS GPM MBH CONTROL THE MECHANICAL CONTRACTOR SHALL CONFIRM ALL SYSTEMS VOLTAGES BEFORE BIDDING OR 14x8
<br /> w DEG.F DEG.F VALVE DP ORDERING EQUIPMENT, AND SHALL ALLOW FOR BUCK& BOOST TRANSFORMERS IF REQUIRED. PROJECT NO:: 2013.00
<br /> = VAV-1-1A(E) EXISTING - - - 970 - - - - - - - - - - - - 5. AIR BALANCE: 300 CFM = CUBIC FEET PER MINUTE
<br /> THE AIR DISTRIBUTION SYSTEM SHALL BE BALANCED TO DELIVER SPECIFIED AIR QUANTITIES 12 X 12 = NECK SIZE
<br /> VAV-1-1B(E) EXISTING - - - 1940 - - - - - - - - - - - - 1605 EAST MARCH LANE 1 STOCKTON,CA 1 95210
<br /> O FOLLOWING THE PROCEDURES OF THE LATEST EDITION OF THE SMACNA PUBLICATION SD P:000.000.0000 1 F:000.000.0000
<br /> VAV-1-1C(E) EXISTING - - - 485 - - - - - - - - - - - - PROCEDURAL STANDARDS FOR TESTING ADJUSTING & BALANCING OF ENVIRONMENTAL SMOKE DETECTOR 0
<br /> VAV-1-1D(E) EXISTING - - - 970 - - - - - - - - - - - - SYSTEMS. CONTRACTOR SHALL PROVIDE ACCESSIBLE &ADJUSTABLE VOLUME DAMPERS AS DUCT WITH ACOUSTICAL LINING
<br /> LU REQUIRED TO BALANCE THE SYSTEMS & MAINTAIN A NOISE CRITERIA LEVEL NOT TO EXCEED 30. X X X X X X X X
<br /> ,� TO BE REMOVED �
<br /> LU VAV-1-2(E) EXISTING - - - 780 - - - - - - - - - - THE AIR BALANCE TECHNICIAN SHALL BE RESPONSIBLE TO MODIFY ALL SUPPLY, RETURN, AND
<br /> VAV-1-3(E) EXISTING - - - 1380 - - - - - - - - - - - - EXHAUST FAN SHEAVES &VFD OUTPUT FREQUENCY LIMITS AS APPLICABLE SUCH THAT THE THERMOSTAT, MOUNT TOP AT+48"A.F.F. 0 $
<br /> U) VAV-1-4(E) EXISTING - - - 880 - - - - - - - _ _ _ _ _ DESIGN AIR FLOWS ARE MET. ALL SUPPLY FANS CONTROLLED FOR FILTER LOADING SHALL CONDENSATE DRAIN LINE CD
<br /> z SIMILARLY BE MODIFIED TO ENSURE THE FULL RANGE OF MOTOR POWER IS AVAILABLE TO THE STRUCTURAL ENGINEER
<br /> VAV-1-5(E) EXISTING - - - 730 - - - - - - - - - - - - CONTROL SYSTEM. RATED MAXIMUM FAN SPEED SHALL NOT BE EXCEEDED. ABOVE FINISHED FLOOR A.F.F. PEOPLES ASSOCIATE
<br /> W VAV-1-6(E) EXISTING - - - 1100 - - - - - - - - - - - - 6. PERMITS AND UTILITY SERVICE FEES: ACCESS DOOR/ACCESS PANEL A.D. /A.P. STRUCTURAL ENGINEERS
<br /> > VAV-1-7(E) EXISTING - - - 900 - - - - - - _ _ _ _ _ _ CONTRACTOR TO ARRANGE AND PAY FOR ALL PERMITS, INSPECTIONS AND SERVICE CHARGESoo
<br /> 1150 CAMPBELL AVE, SAN JOSE, CA 95126
<br /> 0 REQUIRED IN THE INSTALLATION OF THE WORK. ANALOG INPUT/ANALOG OUTPUT Al /AO CONTACT: MICHAEL DEIGERT
<br /> VAV-1-8(E) EXISTING - - - 2300 - - - - - - - - - - - - 7. EXISTING INFORMATION: AUTOMATIC AIR VENT AAV 408.957.9220 x 108 P
<br /> VAV-1-9(E) EXISTING - - - 1200 - - - - - - - - - _ _ _ LOCATION, SIZE, MATERIAL, ETC. OF EXISTING SYSTEMS, ETC., IS PROVIDED FROM SOURCES oo E-MAIL: mdeigert@pase.com
<br /> VAV-1-10(E) EXISTING - - - 1480 - - - - - _ _ _ _ _ _ DEEMED TO BE RELIABLE BUT IS NOT GUARANTEED. CONTRACTOR SHALL FIELD VERIFY ALL CUBIC FEET PER HOUR (1000 BTU) CFH
<br /> Q DATA BEFORE PROCEEDING WITH ANY WORK. NO EXTRA COST WILL BE ALLOWED FOR CUBIC FEET PER MINUTE CFM
<br /> LU VAV-1-11(E) EXISTING - - - 1000 - - - - - - - - - - - - CONDITIONS NOT AS SHOWN. CIVIL ENGINEER
<br /> VAV-1-12(E) EXISTING - - - 1215 _ _ _ _ _ _ _ _ _ 8. ACCURACY: DIFFERENTIAL PRESSURE TRANSDUCER DPT
<br /> PLANS ARE DIAGRAMMATIC. CONTRACTOR SHALL CONFIRM ALL DIMENSIONS AND LOCATIONS SIEGFRIED
<br /> J VAV-1-13(E) EXISTING - - - 525 - - - - - - - - - - - - OF AC UNITS, EXHAUST FANS, WALLS, PARTITIONS ETC., AGAINST ARCHITECTURAL AND DIGITAL INPUT/DIGITAL OUTPUT DI /DO 3428 BROOKSIDE ROAD
<br /> z VAV-1-15(E) EXISTING - - - 480 - - - - - - - - - - - - STRUCTURAL DESIGN PLANS FOR LOCATION CONSISTENCY&ACCURACY PRIOR TO EXISTING (E) STOCKTON, CA 95825
<br /> AV-1-15A(E) EXISTING - - - 550 - - - - - - _ _ _ _ _ _ COMMENCING WITH ANY WORK. 2 ONTA T: ADAM MERRIL
<br /> 9. PAINTING: FLOW SWITCH FS
<br /> Q AV-1-15B(E) EXISTING - - - 480 - - - - - - - - - - - - PAINT ALL VISIBLE INTERIOR PORTIONS OF TERMINAL DEVICES & CANS WITH FLAT BLACK E-MAIL: amerrill@siegfriedeng.com
<br /> z ENAMEL PAINT. GALLONS PER MINUTE GPM
<br /> z VAV-1-17(E) EXISTING - - - 400 - - - - - - - - - - - -
<br /> 0- VAV-1-18(E) EXISTING - - - 1140 - - - 10. SIZES: GALVANIZED SHEET METAL GSM
<br /> DUCTWORK SIZES ON PLANS ARE INSIDE NET FREE AREA. LANDSCAPE ARCHITECT
<br /> z VAV-1-19(E) EXISTING - - - 520 - - - - - - - - - - - - 11. MECHANICAL EQUIPMENT: THOUSANDS OF BTU'S PER HOUR MBH SIEGFRIED
<br /> o VAV-2-1(E) EXISTING - - - 1880 - - - - - - _ _ _ _ _ _ ALL EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY AND INSTALLED IN NEW (N) 3428 BROOKSIDE ROAD
<br /> z ACCORDANCE WITH ITS INSTALLATION INSTRUCTIONS AND LISTING. STOCKTON, CA 95825
<br /> Q VAV-2-2(E) EXISTING - - - 980 - - - - - - - - - - - - 12. PROVIDE EACH CLASSROOM WITH A(CO2) CARBON DIOXIDE MONITORING DEVICE PER PUC 1625. NOT IN MECHANICAL CONTRACT N.I.M.C. CONTACT: ROBERT NORBUTAS
<br /> W VAV-2-3(E) EXISTING - - - 980 - - - - - - - - - _ _ _ 13. ALL EXISTING DUCTWORK SHALL BE INSPECTED AND CLEANED. OUTSIDE AIR OSA 209.943.2021 P
<br /> 3: VAV-2-4(E) EXISTING - - - 1140 _ E-MAIL: bnorbutas@siegfriedeng.com
<br /> Q - - - - - POINT OF CONNECTION P.O.C.
<br /> J VAV-2-5(E) EXISTING - - - 940 - - - - - - - - - - - - REFRIGERANT LIQUID/ REFRIGERANT SUCTION RL/RS
<br /> = VAV-2-6(E) EXISTING - - - 1120 - - - - - - - - - - - - MECHANICAL
<br /> (D VAV-2-7(E) EXISTING - - - 1540 - - - - - - _ _ _ _ _ _ MEP Component Anchorage Note TEMPERATURE CONTROL PANEL TCP MODERN AIR MECHANICAL
<br /> VAV-2-9(E) EXISTING - - - 1180 - - - - - - - - - - - - WELL TEMPERATURE SENSOR WTS 2200 COOPER AVENUE
<br /> All mechanical, plumbing, and electrical components shall be anchored and installed per the MERCED, CA 95344
<br /> VAV-2-10(E) EXISTING - - - 1540 - - - - - - - - - - - - CONTACT: MARK LEITING
<br /> o details on the DSA approved construction documents. The following components shall be
<br /> v VAV-2-11(E) EXISTING - - - 1220 - - - - - - - - - - - - 209.722.0076 P
<br /> anchored or braced to meet the force or displacement requirements prescribed in the 2019 CBC, .00 E-MAIL:mleiting@modernair.biz
<br /> U' VAV-2-12(E) EXISTING - - - 1380 - - - - - - - - - - - - Sections 1617A.1.18 through 1617.A.1.26 and ASCE 7-16 Chapter 13, 26 and 30. DUCTWORK NOTES
<br /> VAV-2-13(E) EXISTING - - - 750 - - - - - - - - - - - -
<br /> Q VAV-2-14(E) EXISTING - - - 910 - - - - - - - - - - - - 1. All permanent equipment and components. ELECTRICAL
<br /> co AV-2-14A(E) EXISTING - - - 910 - - - - - - - - - - - - 2. Temporary, movable or mobile equipment that is permanently attached (e.g. hard wired) 1. ALL WORK TO BE DONE IN ACCORDANCE WITH THE LATEST EDITIONS OF THE NORTH STATE ELECTRICAL CONTRACTORS
<br /> o APPLICABLE SMACNA STANDARDS AND FABRICATION GUIDELINES. oo SCOTT JACOBS
<br /> LU VAV-2-15(E) EXISTING - - - 1560 - - - - - - - - - - _ _ to the building utility services such as electricity, gas or water. 2. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT DETAILED SHOP
<br /> 3. temporary, m 11101 WHITE ROCK ROAD
<br /> z VAV-2-18(E) EXISTING - - - 2635 - - - - - - - - - - - - movable or mobile equipment which is heavier than 400 pounds or has a DRAWINGS SHOWING ACTUAL EQUIPMENT SELECTION, CONFIGURATION AND RANCHO CORDOVA, CA 95670
<br /> AV-2-19A(E) EXISTING - - - 1860 - - - - - - - - - _ _ _ center of mass located 4 feet or more above the adjacent floor or roof level that directly LOCATION; DUCTWORK SIZE, ROUTING AND PENETRATION LOCATIONS. oo CONTACT: SCOTT JACOBS
<br /> } support the component is required to be restrained in a manner approved b DSA. 3. ALL SUPPLY AND RETURN DUCTS SHALL BE INSULATED PER T24 THICKNESS AND 916.462.0817 P
<br /> m VAV-2-20(E) EXISTING - - - 3945 - - - - - - - - - - - - pp p q pp y R-VALUE REQUIREMENTS. EXTERIOR INSULATION EXPOSED TO WEATHER SHALL oo E-MAIL: scott@northstate-eci.com
<br /> NOTES: The following mechanical and electrical components shall be positively attached to the structure BE WEATHERPROOFED AND SHALL BE PAINTED TO MATCH ADJACENT SURFACE.
<br /> LU 1. PROVIDE WITH ZONE THERMOSTAT, MOUNT TOP AT+48"AFF. 4. ALL METAL DUCTS SHALL BE CONSTRUCTED OF GALVANIZED SHEET METAL PER PLUMBING
<br /> but need not demonstrate design compliance with the references noted above. These components CALIFORNIA MECHANICAL CODE STANDARDS. 000
<br /> v 2. MIN. CFM = 30%AIRFLOW. 5. ALL RECTANGULAR BRANCHES SHALL BE CONSTRUCTED OF WYE FITTINGS. PRO-TEC PLUMBING
<br /> LU shall have flexible connections provided between the component and associated ductwork piping CONTACT: ED BOSQUE
<br /> 6. PROVIDE TURNING VANES ON ALL SQUARE AND RECTANGULAR ELBOWS.
<br /> o and conduit. Flexible connections must allow movement in both transverse and longitudinal 916.337.2138 P
<br /> directions.
<br /> E-MAIL: ed protecplumbing net
<br /> co PACKAGED ROOFTOP AC UNIT SCHEDULE A. Components weighing less than 400 pounds and have a center of mass located 4 feet or
<br /> ~ MARK MANUFACTURER DESCRIPTION NOM. SUPPLY RETURN OSA COOLING MBH SUPPLY RETURN SUPPLY RETURN ELECTRICAL OP. WT. EER NOTES less. SHEET INDEX oo
<br /> o NO. & MODEL# TONS CFM CFM CFM TOTAL SENS E.S.P. E.S.P. MOTOR MOTOR VOLTS PH HZ MCA MOCP LBS. B. Components weighing less than 20 pounds, or in the case of distributed systems, less
<br /> z IN W.G. IN W.G. B.H.P. B.H.P. than 5 pounds per foot, which are suspended from a roof or floor or hung from a wall. SHEET NO. DESCRIPTION
<br /> Q AC-2 YORK#YPAL090CVE28BBGXN ROOFTOP PACKAGE UNIT 90.0 35,000 10,500 10,500 1054.9 804.4 1.50" 1.00" 35.9 5.0 230 3 60 395 450 13,812 10.5 -
<br /> oo
<br /> The anchorage of all mechanical, electrical and plumbing components shall be subject to the
<br /> v NOTES: M0.01 MECHANICAL- LEGEND, SCHEDULES AND NOTES
<br /> SERIES 100,SINGLE PACKAGE R-410A AIR CONDITIONER,COOLING ONLY,VARIABLE(VFD)VOLUME FLOW,SUPPLY AIR OPENING LOCATION IS BOTTOM,RETURN AIR OPENING IS BOTTOM, FULL MODULATION WITH MIN. POSITION ECONOMIZER,SINGLE ENTHALPY approval of the design professional in general responsible charge or structural engineer delegated
<br /> ECONOMIZER CONTROL,STANDARD DAMPER,ODP-PREMIUM SUPPLY FAN MOTOR TYPE, 1"SPRING ISOLATION FOR SUPPLY AND RETURN FAN,VFD FAN-SPEED CONTROL, RUBBER ISOLATION FOR RETURN FAN, 12"MERV 14 WITH 2"MERV 8 PRE-FILTERS WITH DIRTY FILTER responsibility and acceptance b DSA. The project inspector will verifythat all components and M2.11 MECHANICAL- FIRST FLOOR PLAN
<br /> 0 SWITCH,ALUMINUM FIN CONDENSER COIL,STANDARD DRIER,WIRE CONDENSER ENCLOSURE, HOT GAS BYPASS,STANDARD CABINET,SINGLE POINT POWER WITH NON-FUSED DISCONNECT,CONVENIENCE OUTLET,SHORT CIRCUIT CURRENT RATING IS 5kA, 1 SENSOR WITH equipment have been anchoredin accordance with above requirements. p
<br /> PHASE MONITOR, FORWARD CURVE CLASS S BLOWER. M2.12 MECHANICAL-SECOND FLOOR PLAN
<br /> Y
<br /> M2.13 MECHANICAL- ROOF PLAN
<br /> Piping, Ductwork, & Electrical Distribution System Bracing Note
<br /> M8.10 MECHANICAL- DETAILS
<br /> co
<br /> Piping, ductwork, and electrical distribution systems shall be braced to comply wth the forces and
<br /> displacements prescribed in ASCE 7-16 Section 13.3 as defined in ASCE 7-16 Section 13.6.5, oo BUILDING PERMIT
<br /> z 13.6.6, 13.6.7, 13.6.8 and 2019 CBC, Sections 1617A.1.24, 1617A.1.25 and 1617A.1.26.
<br /> The method of showing bracing and attachments to the structure for the identified distribution
<br /> `_' system are as noted below. When bracing and attachments are based on a preapproved oo
<br /> installation guide (e.g., OSHPD OPM for 2013 CBC or later), copies of the bracing system PERMIT SUBMITTAL 11.05.2021
<br /> installation guide or manual shall be available on the jobsite prior to the start of and during the BUILDING PLAN CHECK
<br /> AA
<br /> LU hanging and bracing of the distribution systems. The Structural Engineer of Record shall verify the COMMENTS RESPONSE 10.28.2021
<br /> w adequacy of the structure to support the hanger and brace loads.o
<br /> OB PROJECT DEVELOPMENT 10.28.2021
<br /> Mechanical Piping (MP), Mechanical Ducts (MD), Plumbing Piping (PP), Electrical Distribution
<br /> Ac PROJECT REVISIONS 12.17.2021
<br /> Q Systems (E):
<br /> MP®MD®PP❑E❑ Option 1: Detailed on the approved drawings with project specific oo
<br /> Q J notes and details.
<br /> � J
<br /> MP❑MD❑PP❑E❑ Option 2: Shall comply with the applicable OSHPD Pre-Approval (OPM #)
<br /> >1 z
<br /> oo:tf
<br /> w oo
<br /> o
<br /> 0
<br /> o
<br /> a z
<br /> 0 Q
<br /> Q 000
<br /> U W
<br /> O
<br /> 7 2
<br /> Q Ur 000
<br /> d �
<br /> 000
<br /> r }
<br /> m �
<br /> O
<br /> N
<br /> U
<br /> N J
<br /> N
<br /> O J
<br /> N Q
<br /> \ W
<br /> m z
<br /> 000
<br /> zs �
<br /> O
<br /> LU
<br /> 'E �
<br /> QRpFESS/pN MECHANICAL
<br /> � SEN q�F
<br /> LU
<br /> 3 9 m LEGEND , NOTES &
<br /> oo
<br /> Y MODERN AIR TFUHAN��P ��P
<br /> SCHEDULES.00
<br /> '9TF F p�
<br /> o MECHANICAL CONTRACTORS OF CA1�
<br /> V) z 2200 Cooper Ave.P.O.Box 3017 Merced,CA 95344
<br /> O00
<br /> Q m
<br /> Consulting Mechanical Engineers
<br /> Q O 0 1400 Lone Palm Ave,Suite A
<br /> O
<br /> O Tel:209.572.7 399 399Fax:209.236.1579 MO . 01
<br /> D
<br /> N o o www.nexusengineerinq.net
<br /> CO ° QO ° PQO HVAC.Plumbing/Piping.Fire Sprinklers
<br /> oC Process/Plant Engineering.Refrigeration
<br /> N
<br /> N
<br /> O
<br /> N
<br />
|