Laserfiche WebLink
�ZOPauw� 2� SANJ0AQUIN Environmental Health Department <br /> C U N T Y Jasjit Kang,REHS,Director <br /> r Muniappa Naidu,REHS,Assistant Director <br /> `CiQFOa�' Greatness grows here. PROGRAM COORDINATORS <br /> Robert McClellan, REHS <br /> Jeff Carruesco, REHS,RDI <br /> Willy Ng, REHS <br /> Melissa Nissim,REHS <br /> Steven Shih, REHS <br /> April 19, 2022 <br /> ATTN: Marty Kaufman <br /> Kaufman Construction Inc <br /> 733 Loring Ave <br /> Crockett, CA 94525 <br /> RE PROPOSED: Aspire Stockton Elementary <br /> 1605 E March Ln <br /> Stockton, CA 95210 <br /> SR0085111 <br /> Dear MOMS. Kaufman: <br /> This letter indicates San Joaquin County Environmental Health Department (EHD) approval of <br /> drawings submitted for the proposed Aspire Stockton Elementary, subject to the following <br /> condition(s): <br /> 1. The floor surfaces in all food preparation or packaging areas, open food storage <br /> areas, utensil washing areas, refuse storage areas, janitorial areas, and all <br /> restrooms and employee change areas, shall be smooth and of durable construction <br /> and nonabsorbent material which is easily cleaned. These floor surfaces shall be coved <br /> at the juncture at the floor and wall with a three-eighths (3/8) inch minimum radius <br /> coving and shall extend up the wall at least four (4) inches. Rubber or vinyl top set <br /> base is not permitted in these areas [CRFC §114268]. <br /> 2. Provide enclosed light fixtures, or shatterproof shields for light fixtures, over all areas <br /> where food is prepared, utensils cleaned, or open food is stored [CRFC §114252.1]. <br /> 3. Provide well fitting, self-closing doors to all toilet rooms [CRFC §114276]. <br /> 4. All manufactured and custom-made food service equipment must be certified for <br /> sanitation by an American National Standards Institute (ANSI) accredited certification <br /> program. All proposed equipment is subject to EHD approval [CRFC §114130]. <br /> The EHD must be kept informed of the construction progress. A final inspection must be <br /> performed, operating permit fees paid, and approval to operate granted prior to opening for <br /> business. All equipment must be installed and thorough cleaning completed prior to the final <br /> inspection. Inspections must be scheduled at least 48 hours in advance. Charges for additional <br /> inspections, re-inspections and/or consultations may be assessed at the EHD hourly rate of $ <br /> 152 per hour. <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />