PLUMBING LEGEND GENERAL PLUMBING NOTES GENERAL PLUMBING NOTES (cont.) GENERAL PLUMBING NOTES (cont.)
<br /> 1. ALL EQUIPMENT AND MATERIALS USED SHALL 5E NEW AND SHALL PROVIDE TRAPS FOR ALL FIXTURES. TRAPS FOR SINKS AND LAVS EMBED ALL UNDERGROUND PIPING, OTHER THAN GAS PIPING, IN
<br /> SYMBOL DESCRIPTION 5E EQUAL IN QUALITY, TYPE, CAPACITY AND ACCESSORIES TO THE SHALL 5E BRASS, 11 GAGE MINIMUM THICKNESS, WITH INTEGRAL SIEVED EARTH FOR A DEPTH OF 4" A50VE THE PIPE. SMOOTH THE
<br /> EQUIPMENT NOTED ON THE DRAWINGS. ADJUSTMENTS TO CLEANOUT. TRENCHING BELOW THE PIPING FREE FROM ANY ROCKS OR SIMILAR
<br /> SOIL, WASTE OR SANITARY SEWER BELOW GRADE OR SLAB CONSTRUCTION AND ACCESSORIES ON SUBSTITUTED EQUIPMENT OBSTRUCTIONS, AND PROVIDE SPACE FOR BELLS OR MECHANICAL
<br /> GW GREASE WASTE BELOW GRADE MAY 5E REQUIRED TO ACHIEVE THIS EQUALITY, AND SHALL 5E PROVIDE CHROME PLATED ESCUTCHEON PLATES ON ALL PIPES JOINTS FOR ALL WASTE PIPING. LATERALLY BRACE PIPING TO
<br /> INCLUDED AT NO EXTRA COST TO THE OWNER. MAKE ANY CHANGES PASSING THROUGH WALLS OR CEILINGS. ALL EXPOSED PIPING PREVENT PIPE MOTION DURING BACK FILLING OPERATIONS.
<br /> — — — — — — VENT PIPING IN PIPING, FRAMING, ETC., AS REQUIRED TO ACCOMMODATE SHALL 5E CHROME PLATED.
<br /> - COLD WATER PIPING SUBSTITUTED EQUIPMENT. PROVIDE SHOCK ABSORBERS (WATER HAMMER ARRESTOR) AT NOT
<br /> - - HOT WATER PIPING PROVIDE PERMANENT CLEV15 TYPE OR LOOP HANGERS FOR AND COLD WATER AT ALL FIXTURES. ABSORBER SHALL 5E A LINE
<br /> - - - HOT WATER RETURN PIPING I 2. INSTALL ALL EQUIPMENT AND MATERIALS AND PERFORM ALL WORK PIPING AS REQUIRED. WIRE, ROPE, WOOD BLOCKING OR SIZE PIPE RISER CONNECTING TO A 12" HIGH CAPPED PIPE
<br /> IN ACCORDANCE WITH ALL APPLICABLE CODES. APPLICABLE PERFORATED METAL TAPE WILL NOT BE ACCEPTED. PROVIDE CHAMBER, SIZED ONE SIZE LARGER THAN THE RISER. A SINGLE
<br /> G GAS PIPING - PRESSURE NOTED I CODES SHALL INCLUDE, 5UT NOT 5E LIMITED TO THE 2019 PLASTIC WRAPPING OF PIPE WHERE DISSIMILAR METALS OCCUR, MECHANICAL SHOCK ABSORBER MAY 5E UTILIZED FOR A BATTERY
<br /> P4TR PRESSURE AND TEMPERATURE RELIEF PIPING CALIFORNIA MECHANICAL CODE, 2019 CALIFORNIA PLUMBING CODE, SUCH AS BETWEEN COPPER AND IRON PIPING AND SUPPORTS. OF FIXTURES, PROVIDED THE ABSORBER IS SIZED FOR THE MAIN ASPIRE
<br /> CD CONDENSATE DRAIN PIPING I 2019 CALIFORNIA CODE OF REGULATIONS (CCR), 2019 CALIFORNIA LINE SERVING THE BATTERY OF FIXTURES. PER CPC 609.10
<br /> EIRE CODE AND 2019 TITLE 24 ENERGY EFFICIENCY STANDARDS. PROVIDE WRAP ON WASTE, HOT AND COLD WATER PIPING UNDER STOC KTO N
<br /> EXISTING PIPING OR FIXTURE TO BE REMOVED OR ABANDONED IN PLACE WHERE HEAVIER GAGES OF MATERIAL, LARGER SIZES OR MORE ADA ACCESSIBLE PLUMBING FIXTURES. PLUMBEREX CHLORINATE ALL WATER PIPING FOR A PERIOD OF S HOURS, BY
<br /> UNION I STRINGENT REQUIREMENTS THAN THE CODES ARE REQUIRED 5Y "PRO-EXTREME" ONE-PIECE PROTECTOR WITH FULL ROTATION CHARGING WITH A CHLORINE OR HYPO CHLORITE SOLUTION TO
<br /> SOV SHUT OFF VALVE THE CONTRACT DOCUMENTS, SUCH INCREASED REQUIREMENTS OPTION, AND 3-M DUAL LOCK FASTENERS SECURED WITH SELF ACHIEVE A 5 PPM STRENGTH AT THE FIXTURE FURTHEST FROM THE
<br /> ELEMENTARY
<br /> —r>4— I SHALL APPLY. LOCKING NYLON STRAPS. POINT OF APPLICATION. UPON COMPLETION OF CHLORINATION,
<br /> GV GATE VALVE FLUSH ALL PIPING UNTIL NO CHLORINE CAN BE DETECTED 5Y SCHOOL
<br /> GV/VB GATE VALVE IN VALVE BOX I 3 PIPING MATERIALS SHALL 5E AS FOLLOWS:
<br /> 5. CATHODIC PROTECTION: TASTE.
<br /> CKV CHECK VALVE - DIRECTION OF FLOW INDICATED PROJECT NO:: 2013.00
<br /> BV BALL VALVE I STORM, WASTE AND VENT SHALL 5E SCHEDULE 40 PVC. WRAP ALL COPPER OR STEEL WATER PIPING UNDER FLOOR OR AFTER CHLORINATION AND ALL TESTING HAS BEEN COMPLETED,
<br /> POLYVINYL CHLORIDE (PVC) PLASTIC PIPE. ALL BELOW GRADE WITH TWO LAYERS OF PABCO-WRAP, OR SIMILAR CLEAN ALL FIXTURE STRAINERS, AND SET WATER FLOWS FROM 1605 EAST MARCH LANE I STOCKTON,CA 1 95210
<br /> DT4 AUTOMATIC GAS SHUT-OFF VALVE I PIPE, COUPLINGS AND FITTINGS SHALL 5E MANUFACTURED OF MATERIALS, INCLUDING ALL JOINTS. GAS PIPING BELOW GRADE FIXTURES IN ACCORDANCE WITH THE REQUIREMENTS OF T24, CCR. P:000.000.0000 I F000.000.0000
<br /> P4TRV PRESSURE AND TEMPERATURE RELIEF VALVE MATERIAL CONFORMING TO ASTM D 1105. PLASTIC SOLVENT CEMENT SHALL 5E WRAPPED AS DESCRIBED FOR WATER PIPING, OR, AT
<br /> GCO, FCO GRADE CLEAN OUT, FLOOR CLEAN OUT FOR PVC PLASTIC PIPE SHALL CONFORM TO ASTM D 2235. CONTRACTOR'S OPTION, MAY HAVE EXTRU-COAT OR SIMILAR 8. TESTS:
<br /> CO, WCO CLEANOUT, WALL CLEANOUT (ALTERNATIVE (ABS BELOW SLAB, OR IN WALL)) COVERING. ALL FIELD JOINTS SHALL 5E WRAPPED AS FOR BARE
<br /> I PIPING JOINTS. PLACE EXTRU-GOAT GAS PIPING IN A SAND OR TEST ALL GAS PIPING FOR A PERIOD NOT LESS THAN 15 MIN.
<br /> FD FLOOR DRAIN CONDENSATE DRAIN PIPING: TYPE DWV COPPER TUBING AND SIEVED EARTH BED, WITH SIMILAR COVERING TO A LEVEL OF 4" AT A PRESSURE OF NOT LESS THAN 10 PSIG, USING SOAP AND
<br /> FS FLOOR SINK FITTINGS OR I MALLEABLE BOND FITTINGS. PVC PIPINULE 40 G WILEL PIPE L NOT BEAND A50VE TOP OF PIPE, WATER OR SIMILAR MATERIALS AT ALL JOINTS. WELDED GAS PIPING Pro-Tec Plumbing
<br /> + HB HOSE 5158 SHALL BE TESTED 60 PSI FOR 30 MIN, PER CPC.
<br /> POC POINT OF CONNECTION I ACCEPTABLE.) 916 WRAP WATER, WASTE AND GAS PIPING THROUGH THE FLOOR SLAB ) 337-2138
<br /> POD POINT OF DISCONNECT WITH 1/2" THICK THERMASEAL, 2" A50VE AND BELOW THE SLAB TEST ALL WASTE AND VENT PIPING FOR A PERIOD OF NOT LESS Ed Bosque
<br /> WATER PIPE (HOT AND COLD WATER). TYPE L BELOW GRADE, SURFACES. THAN 8 HOURS 5Y CAPPING OR PLUGGING ALL JOINTS TO A LEVEL
<br /> I.E. INVERT ELEVATION I TYPE M ABOVE GRADE, COPPER TUBING, HARD-TEMPER, WITH OF THE HIGHEST FIXTURE OR FITTING, FILLING THE SYSTEM WITH
<br /> F.F. FINISHED FLOOR WROUGHT COPPER FITTINGS. SOLDERING / BRAZING MATERIAL �o. INSULATION: WATER, AND OBSERVING FOR LEAKS. TEST UNDERGROUND SECTION
<br /> /FT PER FOOT I SHALL 5E LEAD FREE, SILVER SOLDER BELOW GRADE, 95-5 OR OF PIPE WITH A RISER TO ACHIEVE THE PRESSURE EQUIVALENT TO
<br /> SIMILAR A50VE GRADE. CAPPED OR PLUGGED OUTLETS SHALL 5E WRAP ALL HOT WATER SUPPLY AND RETURN PIPING WITH P THICK THE HIGHEST FIXTURE OR FITTING, SACRAMENTO
<br /> US,UF,UG UNDER SLAB, UNDER FLOOR, UNDERGROUND I ENG/NEER/NG
<br /> SCHEDULE 40 SCREWED BRASS. ELBOWS AT BRANCH OUTLETS THERMASEAL INSULATION OR EQUAL. TAPE ALL BUTTED JOINTS CONSULTANTS
<br /> TYP, TYPICAL SHALL 5E SCREWED OUTLET, WITH EARS, FOR NAILING OR SCREWING WITH TAPE AS RECOMMENDED 5Y THE MANUFACTURER. USE TEST WATER PIPING AT 100 PSIG FOR A PERIOD OF EIGHT HOURS, 10555 Old Placerville Road
<br /> I TO WALL BACKING. ENLARGED SECTIONS AT FITTINGS, WHERE REQUIRED, AND OBSERVING FOR ANY VISIBLE LEAKS. TEST PIPING AGAIN WITH
<br /> Sacramento,
<br /> 6) 368-4468 3
<br /> (N) NEW Phone: 916
<br /> MITERED JOINTS AT ELBOWS, ETC. VALVE AND PUMP BODIES FIXTURES INSTALLED AT 60 PSIG. REGISTERED IN
<br /> (E), EXISTING EXISTING TO BE FIELD VERIFIED BY CONTRACTOR GAS PIPING: PIPING SHALL BE BLACK STEEL, ASTM A-53, WITH NEED NOT BE INSULATED. so STATES
<br /> AFF ABOVE FINISHED FLOOR I MALEA5LE STEEL FITTINGS. PIPE SIZES 3" AND OVER SHALL REPAIR ANY LEAKS FOUND 5Y REMAKING THE JOINT. DO NOT USE Job No. 21508
<br /> AFG ABOVE FINISHED GRADE HAVE WELDED JOINTS: SIZES 2-1/2" AND SMALLER MAY 5E THREADED INSTALLATION: CAULKING OR SIMILAR METHODS TO CORRECT LEAKS. UPON
<br /> V, VR, VTR VENT, VENT RISER, VENT THRU ROOF I OR WELDED, AT CONTRACTOR'S OPTION, REPAIRING ANY LEAKS FOUND, AGAIN TEST THAT PORTION OF THE
<br /> INSTALL ALL PIPING IN ACCORDANCE WITH THE CALIFORNIA PLUMBING SYSTEM AS DESCRIBED ABOVE.
<br /> W, WD WASTE, WASTE DROP I ABOVE OR BELOW GRADE: ALL WASTE, VENT, SEWER AND CODE WITH THE STATE OF CALIFORNIA AMENDMENTS. SLOPE ALL
<br /> HW, HWD, HWR, HW(R) NOT WATER, NOT WATER DROP, NOT WATER RISER, NOT WATER RETURN WASTE PIPING AS INDICATED ON THE DRAWINGS, AND ALL WATER 9. CONTRACTOR SHALL VERIFY ALL WORK CONDITIONS, PRIOR TO
<br /> STORM LINES SHALL BE OF CAST IRON SOIL PIPE AND FITTINGS
<br /> CA CWD, CWR COLD WATER, COLD WATER DROP, COLD WATER RISER I AND SHALL CONFORM TO THE REQUIREMENTS OF CISPI PIPING TO INSURE ELIMINATION OF AIR. CAREFULLY GRADE ALL COMMENCING WORK, INCLUDING, BUT NOT LIMITED TO: PIPING SIZES,
<br /> REF REFERENCE STANDARD *301, ASTM A 888 OR ASTM A 14 FOR ALL PIPE AND WASTE PIPING TO ENSURE A UNIFORM SLOPE IS ACHIEVED, WITHOUT INVERT ELEVATIONS, POINTS OF CONNECTION, FIXTURES AND
<br /> RD ROOF DRAIN I FITTINGS. PIPE AND FITTINGS SHALL BE MARKED WITH THE ANY DIPS OR HIGH POINTS IN THE PIPING. EQUIPMENT, STRUCTURAL ELEMENTS AND MATERIALS INDICATED AS
<br /> EXISTING, AS WELL AS THE COORDINATED INSTALLATION OF ALL
<br /> OD OVERFLOW DRAIN 1 COLLECTIVE TRADEMARK OF THE CAST IRON SOIL PIPE CAREFULLY TRENCH FOR ALL UNDERGROUND PIPING, AVOID OTHER NEW WORK, MATERIALS, EQUIPMENT, ETC. VERIFY THE LOCATION AND
<br /> TDL TOTAL DEVELOPED LENGTH I INSTITUTE AND BE LISTED NSF INTERNATIONAL, OR RECEIVE UTILITIES, AND REPAIR ANY DAMAGES TO SAME CAUSED BY THE REQUIRED PIPING CONNECTIONS OF ALL HVAC OR OTHER
<br /> NIPC NOT IN PLUMBING CONTRACT I APPROVAL OF THE ENGINEER WORK OF THIS CONTRACT. PROVIDE PROPER SHORING FOR ALL MECHANICAL EQUIPMENT. NOTIFY ARCHITECT OF ANY
<br /> 5V/V5 BALL VALVE IN VALVE BOX DEEP TRENCHES, AS REQUIRED BY THE SAFETY REGULATIONS OF DISCREPANCIES PRIOR TO TRENCHING OR COMMENCING OTHER
<br /> 1 JOINTS: THE STATE OF CALIFORNIA, AND 5Y OSHA. PROVIDE ALL REQUIRED WORK,
<br /> I I. NO NUB STANDARD COUPLINGS SHALL CONFORM TO CISPI BARRICADES, WARNING SIGNS, ETC. CAP ALL PIPING ENDS AT THE
<br /> STANDARD 310 (LATEST EDITION) AND SHALL BE LISTED BY CLOSE OF THE DAY'S WORK TO PREVENT ENTRY OF FOREIGN 10, ROUTE CONDENSATE PIPING FROM EQUIPMENT TO NEAREST
<br /> NSF INTERNATIONAL. (THIS CURRENTLY IS TYLER, ANACO, MATERIALS. FLUSH PIPING OF ALL DEBRIS BEFORE CONNECTING TO APPROVED RECEPTOR. ALL CONDENSATE SYSTEMS SHALL
<br /> MISSION AND IDEAL) FIXTURES. TERMINATE INTO THE STORM DRAINAGE SYSTEM, UNLESS NOTED
<br /> OTHERWISE, AND SHALL OTHERWISE 5E INSTALLED IN ACCORDANCE
<br /> 2. HEAVY DUTY COUPLINGS SHALL CONFORM TO THE WITH ALL APPLICABLE LOCAL AND STATE CODES. CONNECT TO
<br /> REQUIREMENTS OF ASTM C 5ll (CURRENTLY IS HUSKY 4000, EQUIPMENT COMPLETE WITH VENTED P-TRAP.
<br /> AND CLAMP ALL H TORQ 125,
<br /> FIXTURE CONNECTION SCHEDULE 3 THEMPRESSION GASKETS REQU RMENTS OF ASTMUB 1540 (GT) SHALL CONFORM TO
<br /> WASTE WATER GAS 4. JOINTS FOR PIPE AND FITTINGS SHALL CONFORM TO THE
<br /> SYMBOL FIXTURE DESCRIPTION VENT MANUFACTURES INSTALLATION INSTRUCTIONS AND LOCAL CODE
<br /> DIRECT IND. CW HW MBH REQUIREMENTS.
<br /> WC WATER CLOSET, FV 2 3 - 11/2 - -
<br /> 4. PIPING AND EQUIPMENT ACCESSORIES SHALL 5E AS FOLLOWS:
<br /> UR URINAL 11/2 2 - 1 - - REVIEWED FOR CODE COMPLIANCE
<br /> PROVIDE STOPS FOR ALL FIXTURES. STOPS SHALL HAVE January 13, 2022
<br /> L LAVATORY 11/2 2 - 3/4 3/4 - THREADED INLETS, SIMILAR TO SPEEDWAY SR 3112. STOPS WITH BUREAU VERITAS NORTH AMERICA, INC.
<br /> BRAZED (SOLDERED) OR COMPRESSION INLET CONNECTIONS WILL
<br /> S SINK 11/2 2 — 3/4 3/4 - NOT 5E ALLOWED.
<br /> MS MOP SINK 11/2 2 - 3/4 3/4 - PROVIDE ELBOWS AT ALL PIPING PENETRATIONS OF WALLS TO
<br /> STOPS. ELBOWS SHALL HAVE NAILING EARS, AND SHALL 5E
<br /> DF DRINKING FOUNTAIN 11/2 2 - 3/4 I SECURELY FASTENED TO THE STRUCTURE. NIPPLES THROUGH THE
<br /> FD/FS 2" FLOOR DRAIN/SINK 2 2 - _ _ _ WALLS SHALL 5E IPS WEIGHT THREADED COPPER OR BRASS.
<br /> TP TRAP PRIMER - - - 1/2 - -
<br /> BUILDING PERMIT
<br /> APPLICATION SUBMITTAL 08.20.2021
<br /> BUILDING PLAN CHECK
<br /> RESPONSE COMMENTS 10.28.2021
<br /> OWNER
<br /> 2 CHANGES 10.28.2021
<br /> QROF�ssio,�
<br /> o. M-029816
<br /> EXP. 6-30—�oz�
<br /> CITY OF S T O C KTO N • • .••��-
<br /> ,ii7 ANICF ��
<br /> Ora
<br /> A P P ROV E D P LAN S Date Signed: November 16, 2021
<br /> By:rflores Date:01/19/2022
<br /> SCALE AS NOTED
<br /> PLUMBING LEGEND,
<br /> NOTES & SCHEDULE
<br /> (EXCERPT FROM BUILDING
<br /> PERMIT NO. BP21 -06913;
<br /> FOR REF.)
<br />
|