My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084433 (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTRAL
>
0
>
2900 - Site Mitigation Program
>
SR0084433 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 4:55:40 PM
Creation date
10/13/2022 4:53:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084433
PE
2903
FACILITY_ID
FA0026834
FACILITY_NAME
SANDHU PROPERTY - CENTRAL PARKWAY
STREET_NUMBER
0
STREET_NAME
CENTRAL
STREET_TYPE
PKWY
City
TRACY
Zip
95304
APN
20906049
ENTERED_DATE
11/3/2021 12:00:00 AM
SITE_LOCATION
0 CENTRAL PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety and Health Plan <br />Sandhu Property Tracy, California <br />October 22, 2021 Terracon Project No. NA217074 <br />5 <br />§Inspecting and maintaining equipment in compliance with applicable federal, state or local <br />safety regulations. <br />§Enforcement of corrective actions. <br />§Investigation of accidents or injuries. <br />The following individuals will be responsible for implementation and enforcement of the Plan: <br />TITLE NAME PHONE <br />Project Manager and <br />Site Safety Officer Tony Mikacich 916-709-6450 <br />Field Staff Yoni Magallanes 209-294-7014 <br />3.0 MEDICAL SURVEILLANCE REQUIREMENTS <br />All Terracon personnel participating in field operations on this project will be enrolled in a health <br />monitoring program in accordance with the provisions of OSHA 29 CFR 1910.120 and 1910.134. <br />Each project participant must be certified by a Doctor of Medicine as fit for respirator and semi- <br />permeable/impermeable protective equipment use. The content and frequency of physical <br />examinations will be determined by the Consulting physician in compliance with the requirements <br />of 29 CFR 1910.120. <br />Follow-up medical examinations will also be provided in the event of illness or unprotected <br />exposure to contaminants in excess of eight-hour time weighted average permissible exposure <br />limits. <br />4.0 EMPLOYEE TRAINING REQUIREMENTS <br />All Terracon field personnel must have completed 40-hour Hazardous Waste Operations Training <br />per the requirements of OSHA 29 CFR 1910.120. In addition, a current 8-hour annual refresher <br />training certificate will be required for all field personnel. <br />Prior to the start of site activities, the SSO will conduct a pre-project safety and health briefing for <br />all project participants. The personnel responsible for project safety and health will be addressed, <br />as will site history, scope of work, site control measures, emergency procedures and site <br />communications. The briefing will address site contaminants, air monitoring protocols and results <br />and the level of personal protective equipment to be employed for each project task. <br />Daily "tailgate" safety and health briefings will be presented by the SSO at the start of each work <br />day. In addition to a general review of the proposed daily activity and safety requirements, the <br />results of previous air monitoring and any procedural changes will be addressed. A daily tailgate <br />safety meeting documentation form is attached as an Appendix to this plan.
The URL can be used to link to this page
Your browser does not support the video tag.