My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084433 (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTRAL
>
0
>
2900 - Site Mitigation Program
>
SR0084433 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 4:55:40 PM
Creation date
10/13/2022 4:53:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084433
PE
2903
FACILITY_ID
FA0026834
FACILITY_NAME
SANDHU PROPERTY - CENTRAL PARKWAY
STREET_NUMBER
0
STREET_NAME
CENTRAL
STREET_TYPE
PKWY
City
TRACY
Zip
95304
APN
20906049
ENTERED_DATE
11/3/2021 12:00:00 AM
SITE_LOCATION
0 CENTRAL PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety and Health Plan <br />Sandhu Property Tracy, California <br />October 22, 2021 Terracon Project No. NA217074 <br />16 <br />If PID readings are less than 10 ppm, monitoring may be conducted at intervals of 10 minutes. If <br />initial PID readings exceed 10 ppm, or if hydrocarbon odors become evident upon during auger <br />advancement, continuous breathing zone air monitoring will be conducted. <br />If sustained PID readings in the breathing zone exceed 25 ppm, personnel will upgrade to <br />respiratory protection as outlined below. Personnel will remain in air purifying respirators until the <br />photoionization detector readings in the breathing zone have fallen and stabilized below 25 ppm. <br />12.1 Site Action Levels <br />Level D/D Modified Level C Site Evacuation <br />< 25 ppm > 25 ppm > 300 ppm <br />The Action Levels indicated above are for air in the breathing zone and NOT applicable to vapor <br />above containerized soil samples. The Action Levels are established to prevent exposure to <br />airborne petroleum hydrocarbon vapors in excess of established exposure limits. Although the <br />Action Levels indicated for Site Evacuation are within the protective capacity of the respirator <br />cartridges specified below, personnel will evacuate to the UPWIND side of the site if the <br />continuous breathing zone vapor concentrations exceed these limits. The SSO will contact the <br />Corporate Safety and Health Manager for discussion and re-evaluation of personal protective <br />equipment and air monitoring requirements if airborne contamination exceeds Site Evacuation <br />Action Levels. In the event that site evacuation is required, a modification of this safety and health <br />plan will be issued with contingencies for combustible gas monitoring and upgrading to Level B <br />personal protective equipment. <br />13.0 PERSONAL PROTECTIVE EQUIPMENT REQUIREMENTS <br />The air monitoring regimen identified above will allow initial project activity to begin in LEVEL D <br />personal protective equipment to include: <br />•Hard Hat <br />•Safety Footwear (ASTM spec; Impermeable or with outer impermeable covers) <br />•Nitrile or Neoprene Rubber Outer Gloves <br />•Nitrile Glove Liners <br />•Safety Eye Wear (ANSI Z-87 specification) <br />•Hearing Protection (if within 10 feet of drill rigs, concrete coring or other equipment <br />which impairs normal conversation at < 5 feet.) <br />If petroleum saturated soils and potential splashing conditions develop during the course of the <br />assessment, personnel will upgrade to LEVEL D MODIFIED personal protective equipment. Level <br />D Modified personal protective equipment ensemble consists of the above, plus:
The URL can be used to link to this page
Your browser does not support the video tag.