My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084907 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
401
>
2900 - Site Mitigation Program
>
SR0084907 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 11:12:11 AM
Creation date
10/14/2022 11:06:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0084907
PE
2903
FACILITY_ID
FA0027026
FACILITY_NAME
SONORA SQUARE APARTMENTS PHASE II ESA
STREET_NUMBER
401
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14906217
ENTERED_DATE
2/23/2022 12:00:00 AM
SITE_LOCATION
401 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 5 of 10 <br />Drill rig cables, hoses, and ropes are to be safely secured and periodically checked for abrasion or defect. <br />Unsafe equipment shall be replaced immediately. Other equipment will be safely stored and secured when <br />not in use. <br /> <br />The Site Safety Officer shall review with all personnel and subcontractors the equipment inspection checklist <br />for company vehicles. The Site Safety Officer shall also confirm that the drill rig operator has performed a <br />pre-startup safety inspection/observation prior to the start of work and that adequate water is available at the <br />rig for emergency decontamination and washing in case a worker is exposed to contaminated water or soil. <br /> <br />Field vehicles shall park in an area that is a safe distance from operating equipment and vehicle traffic with <br />the location approved by the Site Safety Officer. Care must be given when approaching heavy equipment. <br />Personnel on foot should approach from a direction facing the operator and not a blind side. Eye-to-eye <br />contact should be made before proceeding within the working limits of the operator and their heavy <br />equipment. <br /> <br />OVERHEAD HAZARDS <br />Overhead hazards include utility lines and trees. Prior to performing work requiring the operation of <br />equipment above eye level, the evaluation of overhead hazards shall be made. Equipment shall be located <br />to maximize the clearance from overhead hazards (minimum 10 feet clearance). <br /> <br />UNDERGROUND UTILITIES <br />Condor personnel have contacted Underground Service Alert prior to drilling or excavation activities. The <br />property owner is responsible for marking the location of their own underground utilities. The approximate <br />location of underground utilities shall be marked on the existing ground surface. A minimum of 3 feet <br />clearance shall be given to marked utilities. If drilling or excavation near utilities is required, hand <br />excavation and probing shall be performed in 6-inch intervals prior to drilling or excavating activities. <br />Ground Penetrating Radar (GPR), will also be utilize the locate any existing USTs or other underground <br />utilities in the area. <br /> <br />MOVING AND ROTATING MACHINERY <br />Drilling activities involve the use of large, heavy, moving, and rotating equipment. Loose fitting clothing <br />that can be caught or snagged should be avoided. Work gloves should be worn while working with moving <br />metal parts and equipment. <br /> <br />PHYSICAL HAZARDS <br />CONFINED SPACES/EXCAVATIONS <br />Condor employees are not authorized to enter confined spaces without prior written approval from Condor’s <br />Corporate Safety Manager or designee. Excavations can be considered confined spaces. Employees are not <br />authorized to enter excavations deeper than 5 feet without proper authorization and without proper shoring <br />of excavation sides approved by a geotechnical engineer. Samples of excavations should be taken from <br />material in the excavator bucket after it is brought to ground surface. Proper barricades shall be placed <br />around open excavations when work is not in progress. <br /> <br />FALL PROTECTION <br />The Site Safety Officer will verify that all Condor employees and its subcontractors are using appropriate <br />fall protection. The three major components of personal fall arrest protection are harness, lanyard, and <br />secure anchorage. OSHA requires that fall protection be used anytime someone is working over six feet <br />above the ground or the floor. MSHA requires that fall protection be used anytime a risk of falling exists. <br /> <br />TRIP AND SLIP PROTECTION <br />Good housekeeping shall be maintained at the site to prevent trip and slip hazards.
The URL can be used to link to this page
Your browser does not support the video tag.