My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1990-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1990-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:13:34 PM
Creation date
10/17/2022 1:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1990-1993
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
788
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> WASTE DISCHARGE REQUIREMENTS -12- <br /> FORWARD INC.,FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> this requirement shall close by 9 October 1996,unless otherwise extended by the Board. (40 <br /> CFR 258.16) <br /> 20. Dewatered sewage or water treatment sludge may be accepted for disposal if the sludge contains <br /> at least 20 percent solids (primary sludge) or 15 percent solids(secondary sludge), is mixed with <br /> refuse at a minimum solids-to-liquid ratio of 5:1 by weight and shall not exceed the initial <br /> moisture holding capacity of the solid waste. <br /> 21. Dewatered sewage or water treatment sludges shall only be landfilled in units D and H equipped <br /> with composite liners. <br /> 22. Leachate generation by a landfill unit LCRS shall not exceed 85% of the design capacity of the <br /> sump pump. If leachate generation exceeds this value or if the depth of fluid in an LCRS exceeds <br /> the minimum needed for pump operations then the Discharger shall immediately cease the <br /> discharge of sludges and other high-moisture wastes to the landfill unit and shall notify the Board <br /> in writing within seven days. Notification shall include a timetable for corrective action necessary <br /> to reduce leachate production. <br /> SURFACE IMPOUNDMENT SPECIFICATIONS <br /> 23. Design and construction plans and specifications shall be submitted to the Board for approval <br /> before construction of any surface impoundment. After surface impoundment construction, a <br /> construction quality assurance report shall be submitted to the Board and approved by Board <br /> staff prior to operation of the surface impoundment. <br /> 24. Leachate generation by a surface impoundment LCRS shall not exceed 85% of the design <br /> capacity of the sump pump. If leachate generation exceeds this value or if the depth of fluid in an <br /> LCRS exceeds the minimum needed for safe pump operation,then the Discharger shall <br /> immediately cease the discharge of waste,excluding leachate,to the impoundment and shall <br /> notify the Board in writing within seven days. Notification shall include a timetable for remedial <br /> action to repair the upper liner of the impoundment or other action necessary to reduce leachate <br /> production. <br /> LAND TREATMENT UNIT SPECIFICATIONS <br /> 25. WMU G, a land treatment unit,may be sited at any point in the area described in Attachment B. <br /> WMU G may not overlay any existing elements of a WMU. Design and construction plans shall <br /> be submitted to the Executive Officer for approval before construction of any land treatment unit. <br /> 26. As site conditions change,WMU G may be shifted to another point in the area described in <br /> Attachment B. The new location must be approved by Board staff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.