My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1990-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_1990-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:13:34 PM
Creation date
10/17/2022 1:45:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1990-1993
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
788
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM -11- <br /> FORWARD INC.,FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY <br /> 4 . Points of Compliance <br /> The Points of Compliance for surface water are the downstream sampling points identified <br /> above for surface water monitoring points. The Points of Compliance for ground water are the <br /> downgradient wells identified above for ground water monitoring points. The Points of <br /> Compliance for vadose zone monitoring program are the lysimeters identified above other than <br /> the background lysimeter. <br /> 5 . Compliance Period <br /> The Compliance Period for the facility shall be the number of years equal to the active life of <br /> the facility plus the closure period. Each time the Standard is exceeded (i.e., a release is <br /> discovered), the facility begins a Compliance Period on the date the Board directs the <br /> Discharger to begin an Evaluation Monitoring Program. If the Discharger's Corrective Action <br /> Program (CAP)has not achieved compliance with the Standard by the scheduled end of the <br /> Compliance Period, the Compliance Period is automatically extended until the facility has been <br /> in continuous compliance for at least three consecutive years. <br /> 6 . Monitoring Parameters <br /> The Discharger shall analyze water samples from each water-bearing medium separately for <br /> the following Monitoring Parameters, and shall test the resulting data using either the statistical <br /> or non-statistical methods listed in the Standard Provisions (or alternative methods the Board <br /> finds meets the requirements of 23 CCR 2550.7(e)(6-10) and 40 CFR 258.53): <br /> a. Parameters that use statistical methods: <br /> i. pH, total dissolved solids, specific conductivity,chloride, sulfate, and nitrate <br /> nitrogen; <br /> ii. Barium and strontium (an additional requirement for WMU A/B/C/D area monitoring <br /> points); <br /> iii. Each VOC listed in Attachment E that equals or exceeds its respective MDL in at least <br /> ten percent of the samples taken from the Background Monitoring Points for a <br /> monitored water-bearing medium (i.e., surface water body, aquifer, perched zone, <br /> or soil-pore liquid) during a given Reporting Period; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.