<br />PARTIAL SITEPLAN
<br />SCALE: 1"= 40'_ 0"
<br />=R LINE
<br />CK
<br />)EED
<br />S880 16'22" E 1311.06'
<br />E R T Y L I N E
<br />1 I I— JJI LaaGl I ICI II ]a LI IG II a%.y La1�e Preserve which was established CA.)C1 mitigation project with the
<br />sole goal of maintaining existing habitat values. The preserve is all lakebed which is flooded seasonally.
<br />The Preserve was developed under the guidelines of the SJC Multi -species Habitat and Conservation
<br />Open Space Plan (SJMCCP, 2001). Prohibited uses within the preserve include residential construction.
<br />However, this project is not within the preserve and no setbacks are indicated within the legal
<br />description of the preserve. The legal documents which define the Preserve and the Management Plan
<br />prepared for the Preserve have been provided for your reference.
<br />Our construction is apx. 50' from the Preserve, apx. 150' from the high water line and well within the
<br />Zone X (i.e., areas determined to be outside the 0.2% annual chance of flood plain).
<br />R. WORK PERFORMED UNDER THESE PLANS SHALL NOT BE CONSIDERED COMPLETE
<br />UNTIL FINAL ACCEPTANCE HAS BEEN GIVEN BY ALL GOVERNING AGENCIES
<br />HAVING JURISDICTION OVER THE WORK.
<br />S. A COPY OF THE APPROVED SET OF THESE PLANS SHALL BE KEPT ON SITE DURING
<br />CONSTRUCTION.
<br />T. "IF APPLICABLE" 48 HOURS BEFORE DIGGING, THE CONTRACTOR SHALL CALL
<br />UTILITY SERVICES ALERT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION
<br />OF ALL UTILITIES.
<br />U. CONSTRUCTION STAKING SHALL BE IN PLACE PRIOR TO APPROVAL OF SITE
<br />PREPARATION.
<br />V. ANY MONUMENTS DISTURBED DURING CONSTRUCTION SHALL BE RESET.
<br />W. WORK SHALL BE PERFORMED DURING DAYLIGHT HOURS, MONDAY THROUGH
<br />FRIDAY. NO WORK REQUIRING COUNTY INSPECTION SHALL BE PERFORMED
<br />DURING HOLIDAYS.
<br />SITE HOUSEKEEPING REQ. NOTES
<br />CONSTRUCTION WASTE REDUCTION DISPOSAL AND RECYCLING
<br />A. ALL LOOSE STOCKPILED CONSTRUCTION MATERIALS THAT ARE NOT ACTIVELY BEING
<br />USED ( CONSTRUCTION MATERIALS) CONTRACTOR SHALL BE RESPONSIBLE TO
<br />BECOME FAMILIAR AND APPLY 2019 CalGreen 4.408.1
<br />B. ALL CHEMICALS SHALL BE STORED IN WATERTIGHT CONTAINERS (WITH APPROPRIATE
<br />SECONDARY CONTAINMENT TO PREVENT ANY SPILLAGE OR LEAKAGE ) OR IN A
<br />STORAGE SHED (COMPLETELY ENCLOSED).
<br />C. EXPOSURE OF CONSTRUCTION MATERIALS TO PRECIPITATION SHALL BE MINIMIZED.
<br />THIS DOES NOT INCLUDE MATERIALS AND EQUIPMENT THAT ARE DESIGNED TO BE
<br />OUTDOORS AND EXPOSED TO ENVIRONMENTAL CONDITIONS (LE POLES, EQUIPMENT
<br />PADS, CABINETS, CONDUCTORS, INSULATORS, BRICKS ETC.),
<br />D. BEST MANAGEMENT PRACTICES TO PREVENT THE OFF-SITE TRACKING OF LOOSE
<br />CONSTRUCTION AND LANDSCAPE MATERIALS SHALL BE IMPLEMENTED
<br />CONSTRUCTION WASTEMANAGEMENTCONTRACTOR SHALL BE RESPONSIBLE TO BECOME
<br />AMILIAR AND APPLY 2019 CalGreen 4.408.2
<br />A. DISPOSAL OF ANY RINSE OR WASH WATERS OR MATERIALS ON IMPERVIOUS OR
<br />PERVIOUS SITE SURFACES OR INTO THE STORM DRAIN SYSTEM SHALL BE PREVENTED.
<br />B. SANITATION FACILITIES BE CONTAINED (E.G., PORTABLE TOILETS) TO PREVENT
<br />DISCHARGES OF POLLUTANTS TO THE STORM WATER DRAINAGE SYSTEM OR
<br />RECEIVING WATER, AND SHALL BE LOCATED A MINIMUM OF 20 FEET AWAY FROM AN
<br />INLET, STREET OR DRIVEWAY, STREAM, RIPARIAN AREA OR OTHER DRAINAGE FACILITY.
<br />C. SANITATION FACILITIES SHALL BE INSPECTED REGULARLY FOR LEAKS AND SPILLS AND
<br />CLEANED OR REPLACED AS NECESSARY
<br />D. COVER WASTE DISPOSAL CONTAINERS AT THE END OF EVERY BUSINESS DAY AND
<br />DURING A RAIN EVENT.
<br />E. DISCHARGES FROM WASTE DISPOSAL CONTAINERS TO THE STORM WATER DRAINAGE
<br />SYSTEM OR RECEIVING WATER SHALL BE PREVENTED.
<br />F. STOCKPILED WASTE MATERIAL SHALL BE CONTAINED AND SECURELY PROTECTED
<br />FROM WIND AND RAIN AT ALL TIMES UNLESS ACTIVELY BEING USED.
<br />G. PROCEDURES THAT EFFECTIVELY ADDRESS HAZARDOUS AND NON -HAZARDOUS SPILLS
<br />SHALL BE IMPLEMENTED.
<br />H. EQUIPMENT AND MATERIALS FOR CLEANUP OF SPILLS SHALL BE AVAILABLE ON SITE
<br />AND THAT SPILLS AND LEAKS SHALL BE CLEANED UP IMMEDIATELY AND DISPOSED OF
<br />PROPERLY; AND CONCRETE WASHOUT AREAS AND OTHER WASHOUT AREAS THAT
<br />MAY CONTAIN ADDITIONAL POLLUTANTS SHALL BE CONTAINED SO THERE IS NO
<br />DISCHARGE INTO THE UNDERLYING SOIL AND ONTO THE SURROUNDING AREAS.
<br />VEHICLE STORAGE AND MAINTENANCE
<br />A. MEASURES SHALL BE TAKEN TO PREVENT OIL, GREASE, OR FUEL TO LEAK IN TO THE
<br />GROUND, STORM DRAINS OR SURFACE WATERS.
<br />B. ALL EQUIPMENT OR VEHICLES, WHICH ARE TO BE FUELED, MAINTAINED AND STORED
<br />ONSITE SHALL BE IN A DESIGNATED AREA FITTED WITH APPROPRIATE BMPS.
<br />C. LEAKS SHALL BE IMMEDIATELY CLEANED AND LEAKED MATERIALS SHALL BE DISPOSED
<br />OF PROPERLY.
<br />LANDSCAPE MATERIAL NOTES
<br />A. CONTAIN STOCKPILED MATERIALS SUCH AS MULCHES AND TOP SOIL WHEN THEY ARE
<br />NOT ACTIVELY BEING USED.
<br />B. CONTAIN FERTILIZERS AND OTHER LANDSCAPE MATERIALS WHEN THEY ARE NOT
<br />ACTIVELY BEING USED.
<br />C. DISCONTINUE THE APPLICATION OF ANY ERODIBLE LANDSCAPE MATERIALS WITHIN 2
<br />DAYS BEFORE A FORECASTED RAIN EVENT OR DURING PERIODS OF PRECIPITATION.
<br />D. APPLY ERODIBLE LANDSCAPE MATERIAL AT QUANTITIES AND APPLICATION RATES
<br />ACCORDING TO MANUFACTURE RECOMMENDATIONS OR BASED ON WRITTEN
<br />SPECIFICATIONS BY KNOWLEDGEABLE AND EXPERIENCED FIELDS PERSONNEL
<br />E. STACK ERODIBLE LANDSCAPE MATERIAL ON PALLETS AND COVERING OR STORING
<br />SUCH MATERIALS WHEN NOT BEING USED OR APPLIED.
<br />KEY NOTES
<br />1. PROVIDE AN APPROVED ILLUMINATED NUMBERS OR ADDRESSES. PLACED IN SUCH
<br />POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET. THIS MAY
<br />NECESSITATE PLACING ADDRESS NUMBER AT THE DRIVEWAY ENTRANCE TO THE
<br />PROPERTY. NUMBERS SHALL CONTRAST WHIT THEIR BACKGROUND. PER C.F.C. 505 (TO
<br />BE FIELD VERIFY)
<br />2. THERE SHALL BE LANDING IN ALL EXTERIOR D LANDSC7CP@-BE816 THE
<br />WIDTH SHALL NOT BE LESS THAN THE DOOR SERVED & 36" MIN. CONCRETE LANDING IN
<br />DIRECTION OF TRAVEL.
<br />• THE SLOPE FOR DRAINAGE +12 MIN.(2 % MAX.) 2019 C.R.C. 311.3.
<br />• LANDING OR FLOORS AT THE REQUIRED EGRESS DOOR SHALL NOT BE MORE
<br />THAN 1-V2" LOWER THAN THE TOP OF THRESHOLD.
<br />• DOORS OTHER THAN THE REQUIRED EGRESS DOOR SHALL NOT BE MORE THAN
<br />7-3%4" BELOW THE TOP OF THE THRESHOLD. 2019 C.R.C. R 11.3.1 EXCEPTION & R
<br />11.3.3
<br />• DOORS DOES NOT SWING OVER THE LANDING OR FLOOR. 2019 C.R.C. R11.3.1
<br />EXCEPTION & R11.3.3
<br />3. ALL FENESTRATION SHALL COMPLY WJ TITLE 24 ENERGY CALCULATIONS REGARDING
<br />ENERGY.
<br />4. CONTRACTOR SHALL READ BECOME FAMILIAR AND APPLY 2019 CALIFORNIA GREEN
<br />CODE REQUIREMENTS SHEET A0.1 SECTIONS 4.106.2, 4.106.3 AND 4.408, 4.408.1, 4.408.2.
<br />• SEE HOUSE KEEPING REQUIREMENTS ON THIS SHEET
<br />5. DRIVEWAY, SEE LANDSCAPE DESING BY OTHERS
<br />LLI
<br />U
<br />Z
<br />UJ
<br />0 a
<br />(n cn z
<br />LLJ�o
<br />n�Q
<br />= J U
<br />W 0
<br />Z0> n�
<br />UJ
<br />in U
<br />�e Q
<br />z
<br />Q
<br />J
<br />m
<br />I
<br />c.� N � 085
<br />2
<br />)X,\,E WAL j}
<br />DATE
<br />a� z
<br />BLANKENSHIP
<br />RESIDENCE
<br />PARTIAL
<br />SITE PLAN 1__Jml
<br />PROJECT PHASE
<br />DATE DESCRIPTION
<br />PLAN REVISIONS
<br />REV # DESCRIPTION
<br />DRAWINGS:
<br />REVI
<br />SITE PLAN
<br />GENERAL SITE GRADING NOTES
<br />ApMlcafon#
<br />9ij
<br />WIMB
<br />CHECKED: EAZ
<br />A.
<br />THE GROUND IMMEDIATELY ADJACENT TO THE FOUNDATION SHALL BE SLOPED AWAY FROMTHE
<br />BUILDING.
<br />4
<br />M
<br />B.
<br />CONTRACTOR SHALL VERIFY ALL EXISTING FIELD DIMENSIONS, CONDITIONS, AND NOTIFY TO THE
<br />/
<br />n U
<br />(0
<br />%c)
<br />ARCHITECT OF ANY DISCREPANCIES, PRIOR TO PROCEEDING WITH THE WORK.
<br />J
<br />C.
<br />CONTRACTOR SHALL VERIFY THE LOCATION OF ALL THE UTILITIES WITHIN THE CONSTRUCTION AREA.
<br />Cb
<br />C6
<br />D.
<br />"IF APPLICABLE" CONTRACTOR SHALL IMPLEMENT EROSION CONTROL MEASURES AND BMP'S AS THE
<br />WORK PROGRESSES. EROSION CONTROL
<br />'`� 5
<br />�.�
<br />N
<br />AND WINTERIZATION SHALL INCLUDE BUT IS NOT LIMITED TO
<br />SEEDING AND SPREADING STRAW ON ALL CUT AND FILL SLOPES WITH RAMSEY SEED EROSION CONTROL
<br />$ V
<br />0
<br />C)
<br />MIX RS501, OR EQUAL, AT 50 LBS/ACRE DURING AND AFTER CONSTRUCTION PERIOD.
<br />- '�' u-
<br />F4
<br />N
<br />W
<br />\--,
<br />E.
<br />EXCESS MATERIAL SHALL BE DISPOSED OF OFF-SITE AT AN APPROVED LOCATION AND PLACED IN
<br />Q
<br />ACCORDANCE WITH THE CURRENT CBC AND LOCAL COUNTRY STANDARDS. ALL NECESSARY EROSION
<br />;a v,z
<br />z
<br />CONTROL MEASURES SHALL BE IMPLEMENTED AT THE OFF-SITE LOCATION.
<br />. Q
<br />O
<br />F.
<br />THE CONTRACTOR SHALL MAINTAIN A CLEAN, SAFE AND SECURE WORK SITE CONTRACTOR ASSUMES
<br />COMPLETE RESPONSIBILITY FOR THE CONDITION OF THE SITE. CONTRACTOR SHALL MAINTAIN
<br />LL
<br />a_
<br />CONSTRUCTION ACTIVITIES IN SUCH A MANNER AS TO NOT CREATE A PUBLIC NUISANCE, INCLUDING
<br />DUST CONTROL AND TRAFFIC SAFETY. CONTRACTOR SHALL REMEDY ANY COMPLAINT MADE BY THE
<br />OWNER OR PUBLIC AGENCY IMMEDIATELY UPON NOTIFICATION REGARDING ANY CONDITION OF THE
<br />SITE AND CONSTRUCTION ACTIVITY.
<br />G.
<br />THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL REQUIREMENTS AND
<br />ORDINANCES REGARDING CONSTRUCTION ACTIVITY, INCLUDING ALL HEALTH, SAFETY AND
<br />f-
<br />EMPLOYMENT REQUIREMENTS. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED FEDERAL AND STATE
<br />w
<br />_..
<br />(')
<br />H.
<br />THE CONTRACTOR SHALL PROVIDE AND MAINTAIN SANITARY FACILITIES.
<br />�' _ _
<br />-
<br />I.
<br />ALL GRADING SHALL BE IN ACCORDANCE WITH THE CURRENT CALIFORNIA BUILDING CODE AN COUNTY
<br />tgk _ Qf\
<br />Q
<br />L~1J
<br /><
<br />U
<br />GRADING ORDINANCE ALL WORK SHALL MEET OR EXCEED ALL STATE AND LOCAL BUILDING CODES AND
<br />�`
<br />W
<br />INDUSTRIAL STANDARDS.
<br />LL
<br />�
<br />C�
<br />J.
<br />IF NEW BUILDING CONCRETE PAD IS 8" ABOVE SUNROUNDING NATURAL GRADE OR COMPACTION IS
<br />W
<br />U)
<br />OTHERWISE REQUIRED CONTRACTOR SHALL PROVIDE COPIES OF ANY COMPACTION OR SOILS
<br />"s.; ; ,
<br />W
<br />ANALYSIS REPORTS TO THE BUILDING DEPARTMENT PRIOR TO THE FOUNDATION INSPECTION.
<br />Z
<br />0
<br />CD
<br />O
<br />K.
<br />IF APPLICABLE THE OWNER f CONTRACTOR SHALL ENGAGE THE SERVICES OF A CERTIFIED MATERIALS
<br />W.
<br />TESTING CONSULTANT TO PERFORM COMPACTION TEST. ALL FILLS FOR $UILDING PADS AND ROADS'A
<br />r --
<br />S E COMPACTED TO A MINIMUM OF 90% OF MAXIMUM DENSITY. A COPY OF THE TEST RESULTS
<br />INCLUDI E TEST METHOD USED SHALL BE PROVIDED TO THE COUNTY.
<br />L
<br />"IF APPLICABLE" THE CHNICAL ENGINEER SHALL CERTIFY THAT ALL GRADING WORK, SLOPES AND
<br />PADS ARE STABLE AND IN CCWI<MANCE WITH GEOTECHNICAL REQUIREMENTS.
<br />M.
<br />AREAS TO RECEIVE FILL SHALL BE STRIP OF VEGETATION OR OTHER UNSUITABLE MATERIAL,
<br />SCARIFIED AND COMPACTED. NO FILLS SH E PLACED UNTIL THE APPROVAL OF THE SITE
<br />PREPARATION WORK HAS BEEN OBTAINED FROM T UNTY ENGINEER OR THE GEOTECHNICAL
<br />ENGINEER.
<br />N.
<br />ALL CUTS AND FILLS SHALL BE 2:1 OR FLATTER.
<br />O.
<br />CONTRACTOR SHALL PROVIDE CERTIFICATION THAT ALL GRADING WAS DONE IN AC NCE WITH
<br />THE PLANS AND IN ACCORDANCE WITH ANY ADDITIONAL WORK AUTHORIZED BY THE COUNT .
<br />P.
<br />THE CONTRACTOR SHALL NOTIFY AND SCHEDULE ALL REQUIRED INSPECTIONS. THE CONTRACTOR
<br />SHALL NOTIFY COUNTY PUBLIC WORKS, SOILS ENGINEER AND ANY OTHER INSPECTION AGENCIES 48
<br />HOURS PRIOR TO THE ACTUAL INSPECTION DATES.
<br />S880 16'22" E 1311.06'
<br />E R T Y L I N E
<br />1 I I— JJI LaaGl I ICI II ]a LI IG II a%.y La1�e Preserve which was established CA.)C1 mitigation project with the
<br />sole goal of maintaining existing habitat values. The preserve is all lakebed which is flooded seasonally.
<br />The Preserve was developed under the guidelines of the SJC Multi -species Habitat and Conservation
<br />Open Space Plan (SJMCCP, 2001). Prohibited uses within the preserve include residential construction.
<br />However, this project is not within the preserve and no setbacks are indicated within the legal
<br />description of the preserve. The legal documents which define the Preserve and the Management Plan
<br />prepared for the Preserve have been provided for your reference.
<br />Our construction is apx. 50' from the Preserve, apx. 150' from the high water line and well within the
<br />Zone X (i.e., areas determined to be outside the 0.2% annual chance of flood plain).
<br />R. WORK PERFORMED UNDER THESE PLANS SHALL NOT BE CONSIDERED COMPLETE
<br />UNTIL FINAL ACCEPTANCE HAS BEEN GIVEN BY ALL GOVERNING AGENCIES
<br />HAVING JURISDICTION OVER THE WORK.
<br />S. A COPY OF THE APPROVED SET OF THESE PLANS SHALL BE KEPT ON SITE DURING
<br />CONSTRUCTION.
<br />T. "IF APPLICABLE" 48 HOURS BEFORE DIGGING, THE CONTRACTOR SHALL CALL
<br />UTILITY SERVICES ALERT. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION
<br />OF ALL UTILITIES.
<br />U. CONSTRUCTION STAKING SHALL BE IN PLACE PRIOR TO APPROVAL OF SITE
<br />PREPARATION.
<br />V. ANY MONUMENTS DISTURBED DURING CONSTRUCTION SHALL BE RESET.
<br />W. WORK SHALL BE PERFORMED DURING DAYLIGHT HOURS, MONDAY THROUGH
<br />FRIDAY. NO WORK REQUIRING COUNTY INSPECTION SHALL BE PERFORMED
<br />DURING HOLIDAYS.
<br />SITE HOUSEKEEPING REQ. NOTES
<br />CONSTRUCTION WASTE REDUCTION DISPOSAL AND RECYCLING
<br />A. ALL LOOSE STOCKPILED CONSTRUCTION MATERIALS THAT ARE NOT ACTIVELY BEING
<br />USED ( CONSTRUCTION MATERIALS) CONTRACTOR SHALL BE RESPONSIBLE TO
<br />BECOME FAMILIAR AND APPLY 2019 CalGreen 4.408.1
<br />B. ALL CHEMICALS SHALL BE STORED IN WATERTIGHT CONTAINERS (WITH APPROPRIATE
<br />SECONDARY CONTAINMENT TO PREVENT ANY SPILLAGE OR LEAKAGE ) OR IN A
<br />STORAGE SHED (COMPLETELY ENCLOSED).
<br />C. EXPOSURE OF CONSTRUCTION MATERIALS TO PRECIPITATION SHALL BE MINIMIZED.
<br />THIS DOES NOT INCLUDE MATERIALS AND EQUIPMENT THAT ARE DESIGNED TO BE
<br />OUTDOORS AND EXPOSED TO ENVIRONMENTAL CONDITIONS (LE POLES, EQUIPMENT
<br />PADS, CABINETS, CONDUCTORS, INSULATORS, BRICKS ETC.),
<br />D. BEST MANAGEMENT PRACTICES TO PREVENT THE OFF-SITE TRACKING OF LOOSE
<br />CONSTRUCTION AND LANDSCAPE MATERIALS SHALL BE IMPLEMENTED
<br />CONSTRUCTION WASTEMANAGEMENTCONTRACTOR SHALL BE RESPONSIBLE TO BECOME
<br />AMILIAR AND APPLY 2019 CalGreen 4.408.2
<br />A. DISPOSAL OF ANY RINSE OR WASH WATERS OR MATERIALS ON IMPERVIOUS OR
<br />PERVIOUS SITE SURFACES OR INTO THE STORM DRAIN SYSTEM SHALL BE PREVENTED.
<br />B. SANITATION FACILITIES BE CONTAINED (E.G., PORTABLE TOILETS) TO PREVENT
<br />DISCHARGES OF POLLUTANTS TO THE STORM WATER DRAINAGE SYSTEM OR
<br />RECEIVING WATER, AND SHALL BE LOCATED A MINIMUM OF 20 FEET AWAY FROM AN
<br />INLET, STREET OR DRIVEWAY, STREAM, RIPARIAN AREA OR OTHER DRAINAGE FACILITY.
<br />C. SANITATION FACILITIES SHALL BE INSPECTED REGULARLY FOR LEAKS AND SPILLS AND
<br />CLEANED OR REPLACED AS NECESSARY
<br />D. COVER WASTE DISPOSAL CONTAINERS AT THE END OF EVERY BUSINESS DAY AND
<br />DURING A RAIN EVENT.
<br />E. DISCHARGES FROM WASTE DISPOSAL CONTAINERS TO THE STORM WATER DRAINAGE
<br />SYSTEM OR RECEIVING WATER SHALL BE PREVENTED.
<br />F. STOCKPILED WASTE MATERIAL SHALL BE CONTAINED AND SECURELY PROTECTED
<br />FROM WIND AND RAIN AT ALL TIMES UNLESS ACTIVELY BEING USED.
<br />G. PROCEDURES THAT EFFECTIVELY ADDRESS HAZARDOUS AND NON -HAZARDOUS SPILLS
<br />SHALL BE IMPLEMENTED.
<br />H. EQUIPMENT AND MATERIALS FOR CLEANUP OF SPILLS SHALL BE AVAILABLE ON SITE
<br />AND THAT SPILLS AND LEAKS SHALL BE CLEANED UP IMMEDIATELY AND DISPOSED OF
<br />PROPERLY; AND CONCRETE WASHOUT AREAS AND OTHER WASHOUT AREAS THAT
<br />MAY CONTAIN ADDITIONAL POLLUTANTS SHALL BE CONTAINED SO THERE IS NO
<br />DISCHARGE INTO THE UNDERLYING SOIL AND ONTO THE SURROUNDING AREAS.
<br />VEHICLE STORAGE AND MAINTENANCE
<br />A. MEASURES SHALL BE TAKEN TO PREVENT OIL, GREASE, OR FUEL TO LEAK IN TO THE
<br />GROUND, STORM DRAINS OR SURFACE WATERS.
<br />B. ALL EQUIPMENT OR VEHICLES, WHICH ARE TO BE FUELED, MAINTAINED AND STORED
<br />ONSITE SHALL BE IN A DESIGNATED AREA FITTED WITH APPROPRIATE BMPS.
<br />C. LEAKS SHALL BE IMMEDIATELY CLEANED AND LEAKED MATERIALS SHALL BE DISPOSED
<br />OF PROPERLY.
<br />LANDSCAPE MATERIAL NOTES
<br />A. CONTAIN STOCKPILED MATERIALS SUCH AS MULCHES AND TOP SOIL WHEN THEY ARE
<br />NOT ACTIVELY BEING USED.
<br />B. CONTAIN FERTILIZERS AND OTHER LANDSCAPE MATERIALS WHEN THEY ARE NOT
<br />ACTIVELY BEING USED.
<br />C. DISCONTINUE THE APPLICATION OF ANY ERODIBLE LANDSCAPE MATERIALS WITHIN 2
<br />DAYS BEFORE A FORECASTED RAIN EVENT OR DURING PERIODS OF PRECIPITATION.
<br />D. APPLY ERODIBLE LANDSCAPE MATERIAL AT QUANTITIES AND APPLICATION RATES
<br />ACCORDING TO MANUFACTURE RECOMMENDATIONS OR BASED ON WRITTEN
<br />SPECIFICATIONS BY KNOWLEDGEABLE AND EXPERIENCED FIELDS PERSONNEL
<br />E. STACK ERODIBLE LANDSCAPE MATERIAL ON PALLETS AND COVERING OR STORING
<br />SUCH MATERIALS WHEN NOT BEING USED OR APPLIED.
<br />KEY NOTES
<br />1. PROVIDE AN APPROVED ILLUMINATED NUMBERS OR ADDRESSES. PLACED IN SUCH
<br />POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET. THIS MAY
<br />NECESSITATE PLACING ADDRESS NUMBER AT THE DRIVEWAY ENTRANCE TO THE
<br />PROPERTY. NUMBERS SHALL CONTRAST WHIT THEIR BACKGROUND. PER C.F.C. 505 (TO
<br />BE FIELD VERIFY)
<br />2. THERE SHALL BE LANDING IN ALL EXTERIOR D LANDSC7CP@-BE816 THE
<br />WIDTH SHALL NOT BE LESS THAN THE DOOR SERVED & 36" MIN. CONCRETE LANDING IN
<br />DIRECTION OF TRAVEL.
<br />• THE SLOPE FOR DRAINAGE +12 MIN.(2 % MAX.) 2019 C.R.C. 311.3.
<br />• LANDING OR FLOORS AT THE REQUIRED EGRESS DOOR SHALL NOT BE MORE
<br />THAN 1-V2" LOWER THAN THE TOP OF THRESHOLD.
<br />• DOORS OTHER THAN THE REQUIRED EGRESS DOOR SHALL NOT BE MORE THAN
<br />7-3%4" BELOW THE TOP OF THE THRESHOLD. 2019 C.R.C. R 11.3.1 EXCEPTION & R
<br />11.3.3
<br />• DOORS DOES NOT SWING OVER THE LANDING OR FLOOR. 2019 C.R.C. R11.3.1
<br />EXCEPTION & R11.3.3
<br />3. ALL FENESTRATION SHALL COMPLY WJ TITLE 24 ENERGY CALCULATIONS REGARDING
<br />ENERGY.
<br />4. CONTRACTOR SHALL READ BECOME FAMILIAR AND APPLY 2019 CALIFORNIA GREEN
<br />CODE REQUIREMENTS SHEET A0.1 SECTIONS 4.106.2, 4.106.3 AND 4.408, 4.408.1, 4.408.2.
<br />• SEE HOUSE KEEPING REQUIREMENTS ON THIS SHEET
<br />5. DRIVEWAY, SEE LANDSCAPE DESING BY OTHERS
<br />LLI
<br />U
<br />Z
<br />UJ
<br />0 a
<br />(n cn z
<br />LLJ�o
<br />n�Q
<br />= J U
<br />W 0
<br />Z0> n�
<br />UJ
<br />in U
<br />�e Q
<br />z
<br />Q
<br />J
<br />m
<br />I
<br />c.� N � 085
<br />2
<br />)X,\,E WAL j}
<br />DATE
<br />a� z
<br />BLANKENSHIP
<br />RESIDENCE
<br />PARTIAL
<br />SITE PLAN 1__Jml