Laserfiche WebLink
• Work Plan, including figures depicting the proposed sample locations and an example of soil <br /> vapor probe construction <br /> • Master File Record form <br /> • Two Site Mitigation Well & Boring Permit Applications, one for each of the two parcels where <br /> drilling is proposed (APNs 21307017 & 21307039; see Figure 1 of workplan) <br /> • A letter from the property owner granting access to the site <br /> We are going to use the online portal to pay a combined fee of $1,596 this afternoon, which <br /> includes a 1.5x charge for the work plan review, and two additional payments of $456 for each of <br /> the permit applications. I wanted to know which of the three options to select for payment (Service <br /> Request or Well Permit, Annual Permit Fees, or Other - Inspections, Misc), and if there is any <br /> required reference info. I will be reaching out separately this afternoon to confirm payment details. <br /> Please reach out if there are any questions or additional information is required. <br /> Thanks, <br /> Tommy <br /> Tommy Winger, PG <br /> Senior Consultant <br /> Ramboll I Emeryville, CA <br /> D +1 510 420 2546 <br /> M +1 207 807 8232 <br /> twinger(a)ramboll.com <br /> Ramboll <br /> 2200 Powell Street <br /> Suite 700 <br /> Emeryville, CA 94608 <br /> USA <br /> https://ramboll.com <br />