My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0083161 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOLDEN
>
1002
>
2900 - Site Mitigation Program
>
SR0083161 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 10:34:16 AM
Creation date
10/18/2022 10:32:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0083161
PE
2903
FACILITY_ID
FA0026298
FACILITY_NAME
SEWD-01 (MONITORING WELL F)
STREET_NUMBER
1002
Direction
N
STREET_NAME
HOLDEN
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
10511031
ENTERED_DATE
1/14/2021 12:00:00 AM
SITE_LOCATION
1002 N HOLDEN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: AEC27949-971 E-40CF-9A0 D95171329AA6 <br />TSS Agreement No. 0016 <br />Page 8 of 13 <br />• Dissolved boron, calcium, magnesium, potassium, and sodium (EPA 200.7) <br />• Dissolved hardness (Std Method 2340 B) <br />• Ammonia (EPA 350.1) <br />• Dissolved Ortho -phosphate (DWR-modified EPA 365.1) <br />• Dissolved nitrate + nitrite (Std Method 4500-NO3-1`) <br />• Radionuclides <br />5 —Other Field Activities <br />Data Acquisition <br />Downhole groundwater level monitoring equipment will be installed in each of the monitoring well casings. The <br />equipment will be purchased by DWR and will be installed by the GSA. The GSA will collect data from the <br />loggers and maintain the equipment for the useful life of the project. Data collected will be reported to DWR <br />(as described above in Section 4 for Groundwater Level Measurements) and made public by the GSA. <br />6 —Final Reporting <br />Upon completion of project construction, activities will be summarized by DWR, with applicable input from the <br />GSA, in a final report containing descriptions of project objectives, office and field activities, related outcomes, <br />and field -collected data documentation. The report will contain the following items. <br />• An Executive Summary <br />• The project title and work objective <br />• Names of partnering agencies <br />• Description of outcome of work performed <br />• Log of methods used and observed lithologies during drilling <br />• Borehole geophysical logs <br />• As -built well construction diagram(s) <br />• Description of well development activities <br />• Copy of the Well Completion Report filed by the drilling contractor through DWR's Online System for Well <br />Completion Reports <br />• Descriptions of any ancillary equipment installed <br />• Groundwater sample testing results <br />• Field measurements <br />
The URL can be used to link to this page
Your browser does not support the video tag.