Laserfiche WebLink
REVISIONS <br /> 1 BLDG REV1 12/31/21 <br /> CW PIPE IN WALL <br /> STU D WALL <br /> 1/2" SOV <br /> � 7, <br /> SLOPE PIPING AS MUCH TRAP PRIMER <br /> AS POSSIBLE TOWARD SECURE TO STUD <br /> DISCHARGE, TYPICAL CONNECT TO CW <br /> ACCESS PANEL PIPE IN WALL QftOFESS/Oy9 <br /> INDIRECT WASTE 2" VENT RISER UNIONMAD 0 F,G <br /> PIPING �� IN WALL <br /> FINISHED 1/2" CW PIPE <br /> FIN. FLOOR <br /> MIN 2" FLOOR FLOOR DRAIN OR * No. 67047 <br /> FLOOR SINK Exp. 09-30-2022 <br /> ° ROUTE PIPING INCONSPICUOUSLY s�9T C/V <br /> ° . .0 °. ° AND UNOBTRUSIVELY. HANG PIPE F OF C Fv�F <br /> AS REQUIRED. DO NOT INSULATE <br /> FLOOR SINK INDIRECT DRAIN PIPE WHEN EX— WASTE LINE (SI <br /> POSED IN FOOD SERVICE FACILITY. PER PLAN) I <br /> 2 WATER TIGHT SEAL <br /> 2" "P" TRAP <br /> 1/2" CW BELOW FLOOR <br /> 1/2" CW TO TRAP <br /> CONNECT AS REQ'D <br /> 6 <br /> FLOOR SINK DETAIL TRAP PRIMER TO FLOOR DRAIN <br /> 1 <br /> NTS NTS <br /> CONTRACTOR TO CONFIRM AND INFORM THE STRUCTURAL ENGINEER <br /> PRIOR TO ANY CUTTING IF THE (E) SLAB IS POST TENSION TYPE. <br /> #3 REBAR 20" STAGGER 2" VENT <br /> ON EACH SIDE, TYP. IN WALL <br /> 1 " H&CW, SEE PLANS <br /> #3 REBAR FOR CONTINUATION <br /> DOWELED TO A MIN OF 6" 5/8" CONDENSATE CONNECTION. <br /> (E) CONCRETE SLAB 12" MIN 12" MIN IN (E) FLOOR SLAB. BOND 0 0 CONNECT TO DRAIN LINE AND <br /> (E) VAPOR BARRIER WITH EPDXY. TYP. ROUTE TO MOP SINK. 3" SUPPLY & RETURN VENT PER <br /> (E) DRAIN ROCK FINISHED FLOOR MANUFACTURER RECOMMENDATIONS. <br /> FLOW CONTROL 1 " BALL VALVE IN SEE HVAC PLANS. <br /> 2Al GAP ACCESSIBLE LOCATION <br /> HAG—BA-1 1 " LOW PRESSURE NATURAL GAS <br /> a ' a a THERMOMETER SUPPLY, SEE PLANS <br /> a a a STRAINER BASKETS <br /> O O O O O O O O O O <br /> ® HAG-2 AIR GAP 2 GALLON THERMAL EXPANSION <br /> O TANK WITH NSF LINER. I I 1 " AGA RATED GAS VALVE IN <br /> =I=I=I=I=I=I I=I=I=I=I=II = ACCESSIBLE LOCATION <br /> w <br /> =I =I =I =I =I =I =I =I =I FLOOR ASME RATED TEMPERATURE & <br /> EXTEND REQ RELIEFVALVE. <br /> TANKLESS WATER HEATER <br /> —I I I I I I I I I— FLOOR DRAIN/SINK TO SPILL INTO MOP SINK SECURE TO WALL PER <br /> (E) NATIVE SOIL =I=I=I=I=I =II II 11-111— , — MANUFACTURER'S RECOMMENDATIONS <br /> 3/4" DRAIN VALVEUNION (TYP X 3) Z <br /> TRENCH BACKFILL SHALL BE MOISTURE CONDITIONED OVERLAP NEW VAPOR BARRIER ' I 8" LONG CAPPED <br /> TO AT LEAST 5% OVER OPTIMUM MOISTURE CONTENT ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS OR MEET LOCAL _ � _ �J DIRT LEG <br /> FOR A MINIMUM OF 6 ON BOTH CODE REQUIREMENTS. HUBLESS CAST IRON PIPE, FITTINGS AND CONNECTORS ALL AROUND CL <br /> AND COMPACTED TO 85-90% RELATIVE COMPACTION SIDES WITH (E) VAPOR BARRIER SINK AND TRAP. <br /> PER ASTM D1557 WITH STEGO WRAP TAPE. TYP. O <br /> GREASE INTERCEPTOR: BIG DIPPER, W-200—IS, 20GPM, 2" INLET OUTLET, WHITE DUCO <br /> COATING INSIDE AND OUTSIDE, BASKETS, SUPPORT LEGS AND WALL BRACKETS. <br /> V p ,o <br /> TYP. SLAB CUT/POUR BACK DETAIL HYDROMECHANICAL GREASE INTERCEPTOR GAS FIRED WATER HEATER DETAIL p Z � <br /> 8 5 2 � � <br /> NTS NTS NTS � V)a 01-1 <br /> ROOF U Q <br /> QU <br /> PIPE WITHOUT UNIONS OR O <br /> • H L 5/8" GYP. WALL W/ S/S VALVES IN CEILING SPACE WALL LINER, TYP. L/) r 1 <br /> ME GAS LOCK OR SHUT OFF O>, Q <br /> LAY—IN CEILING 0 � � <br /> t/� O* <br /> WATER HEATER GWH-1 D GAS PIPE SIZED PER <br /> MANUF'R SPECIFICATIONS GAS PIPING DOWN IN WALL <br /> FLEXIBLE GAS LINE TO EQUIP., PIPE WITHOUT UNIONS OR � <br /> VALVES DATE <br /> SIZED PER MFG. SPECIFICATION. 09/15/2021 <br /> ALLOW ENOUGH SLACK LINE TO SCALE AS <br /> PULL EQUIP. 24" MIN. FROM DRAWN NOTED <br /> WALL, TYP. MSK <br /> FLEXIBLE APPLIANCE JOB 21035 <br /> STORAGE SHELF CONNECTOR. TYPICAL 6" <br /> DSHEET TITLE <br /> IRT LEG TO <br /> MOP HOOK uCC ABOVE . PLUMBING <br /> FLOOR DETAILS <br /> MANUAL GAS VALVE, APPROVED PROVIDE LINE SIZED <br /> RESTAINING CABLE FLEXIBLE GAS PIPING, AND QUICK APPROVED GAS PIPING TEE <br /> DISCONNECT MOUNTED IN ON CONCEALED PIPING IN <br /> ACCESSIBLE LOCATION BEHIND WALL, FOR APPLIANCE <br /> 1 EQUIPMENT. CONNECTION. <br /> MOP SINK ELEVATION 7 GAS EQUIPMENT CONNECTION DETAIL GAS EQUIPMENT CONNECTION DETAIL SHEET 4 3 <br /> NTS NTS NTS P3 " 0 <br />