Laserfiche WebLink
DRAFT Geosyntec <br /> consultants <br /> Geosyntec. 2018b. Data Transmittal for Third Quarter 2018 Groundwater Monitoring Results— <br /> Technical Memorandum. 9 November. <br /> Geosyntec. 2018c.Draft Addendum to Draft UST Data Gap Investigation Work Plan. 9 <br /> November. <br /> Geosyntec. 2019a. UST Data Gap Investigation Work Plan, Port of Stockton, Rough and Ready <br /> Island, Stockton, California. 22 January. <br /> Geosyntec. 2019b. Soil Vapor Sampling Work Plan— UST Site 8178, Port of Stockton, Rough <br /> and Ready Island, Stockton, California. 2 May. <br /> Geosyntec. 2019c. Draft Request for Closure of Underground Storage Tank Sites; Low-Threat <br /> Underground Storage Tank Case Closure Policy, UST 517, UST605, UST 91613, Building <br /> 410A OWS, Building 16 Former USTs, Site 48: Building 7070 USTs, Port of Stockton, <br /> Rough and Ready Island. August 7. <br /> State Water Resources Control Board(SWRCB). 2012. Low-Threat UST Case Closure Policy. <br /> 17 August. <br /> Tetra Tech EM Inc. (Tetra Tech). 2001. Building 817-B Underground Storage Tank Site <br /> Investigation Report, Final. DS.0176.13533. 14 August. <br /> Tetra Tech. 2003. Finding of Suitability for Early Transfer, Phase III, Naval Computer and <br /> Telecommunications Station, San Diego Detachment Stockton, Stockton, California. 30 <br /> June. <br /> United States Environmental Protection Agency(USEPA). 2008. Region 9 Preliminary <br /> Remediation Goals. <br /> Draft Soil and Soil Vapor Investigation 15 August 30,2019 <br />