My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082695
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
SR0082695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 2:23:43 PM
Creation date
10/18/2022 2:05:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0082695
PE
2903
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
23912001
ENTERED_DATE
10/5/2020 12:00:00 AM
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adam Wolfe - 3 - 14 October 2021 <br /> Department of Corrections and Rehabilitation <br /> anticipated. If all primary sample devices perform as intended the additional <br /> canister could be used for an additional indoor air sample location if an <br /> appropriate location is identified, or as a duplicate sample. <br /> 2. Section 4.4 indicates that permanent soil gas sampling wells will be installed in <br /> borings advanced to up to 20 feet bgs, with wells set at depths of roughly 5 and <br /> 15 feet below ground surface. However, groundwater levels at the nearest <br /> groundwater monitoring wells, MW-9-BP and MW-8-BP, have varied between <br /> approximately 4.6 and 6.8 feet bgs over the past 5 years and the maximum depth <br /> to water observed across the Site over the past 20 years is approximately 12 feet <br /> bgs. Staff therefore recommends installing the shallower sampling point at a <br /> depth likely to remain above the water table, and no deeper than 5 feet bgs. If <br /> lithologic logging and measured depth to water during drilling activities suggests <br /> a deeper sampling point may be of value, Staff agrees that a deeper sampling <br /> point should also be installed, but based on available water level data priority <br /> should be given to installing the shallow sampling point at an interval where it will <br /> be able to consistently provide quality data. Staff agree that an initial boring to a <br /> maximum depth of 20 feet bgs for lithologic logging is acceptable, but <br /> subsequent borings should target the proposed soil gas well interval(s). <br /> Central Valley Water Board staff concurs with the proposed site investigation work plan <br /> with the notes above. Due to the restrictions on site access, please notify staff as soon <br /> as the field schedule is confirmed so that staff may be present to observe sampling <br /> activities. Please submit the proposed Technical Memorandum providing results of the <br /> investigation to this office no later than 24 December 2021. <br /> If you have questions regarding this letter or would like to discuss the technical aspects <br /> of the Site, please contact me by email at Durin.Linderholm(Dwaterboards.ca.gov, or by <br /> phone at 916-464-4657. <br /> oHw,6je° <br /> Durin Digitally signed by � ` '.0 0 }+® <br /> Durin Linderholm e®, <br /> Linderholm Date: 2021.10.14 <br /> 16:40:33-07'00' 9342 <br /> Durin Linderholm, P.G. <br /> Engineering Geologist <br /> Site Cleanup Unit <br /> �Of <br /> Digitally signed by MAL CAs° O< <br /> Nathan Casebeer Q�?►� a <br /> �I Date: 2021.10.14 <br /> 16:43:15-07'00' 8359 <br /> Nathan Casebeer, P.G. <br /> Senior Engineering Geologist <br /> Chief, Federal and Private Site Cleanup Unit CW <br />
The URL can be used to link to this page
Your browser does not support the video tag.