My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082695
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
SR0082695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 2:23:43 PM
Creation date
10/18/2022 2:05:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0082695
PE
2903
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
23912001
ENTERED_DATE
10/5/2020 12:00:00 AM
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Investigation Work Plan <br /> Deuel Vocational Institution(DVI), Tracy, California Introduction <br /> aspects of the project and the project team, including schedules and completion of all phases of <br /> field activities, data analysis, and report preparation. <br /> • Project Chemist, Stacy Louie, is responsible for laboratory coordination, quality assurance/quality <br /> control(QA/QC), data validation, and ensuring that the data are uploaded and flagged <br /> appropriately in the project database. <br /> • Field team members(to be determined)are responsible for all on-site operations, field sampling, <br /> and day-to-day coordination associated with this project. This includes ensuring that all health <br /> and safety measures specified in the site-specific Health and Safety Plan are effectively <br /> implemented and executed, and that all personal protective equipment(PPE) and other safety <br /> equipment are available at the project site and in working order. <br /> The fundamental goal of these positions is to perform field operations in a safe and efficient way,to acquire <br /> usable data and produce a quality work product. <br /> 1.6 Project Schedule <br /> Investigation activities are proposed to begin upon approval from the CVWB and funding is in place. <br /> 1-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.