My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0082695
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2900 - Site Mitigation Program
>
SR0082695
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2022 2:23:43 PM
Creation date
10/18/2022 2:05:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0082695
PE
2903
FACILITY_ID
FA0016571
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTE
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
23912001
ENTERED_DATE
10/5/2020 12:00:00 AM
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Investigation Work Plan <br /> Carousel Cleaners, Sacramento, California References <br /> 7.0 References <br /> American Society for Testing and Materials(ASTM). 1985.D2487-83, Classification of Soils for <br /> Engineering Purposes. In Annual Book of ASTM Standards: Vol. 04.08:395-408. <br /> California Department of Toxic Substances Control(DTSC). 2015 (July).Advisory,Active Soil Gas <br /> Investigations. <br /> U.S. Environmental Protection Agency(USEPA). 2006(February). Guidance on Systematic Planning <br /> Using the Data Quality Objectives Process. EPA QA/G-4. <br /> 2020.National Functional Guidelines for Organic and Inorganic Data Review. <br /> URS Corporation(URS). 2011 (May 8).Baseline Sampling Results, Pilot Test Activities, and Second <br /> Quarter 2011 Groundwater Monitoring Report. <br /> 2015 (February 3).Deuel Vocational Institution Burn Pit:Focused Passive Soil Gas and <br /> Groundwater Investigation and Well Installation Work Plan—Phase 2 Groundwater Sampling <br /> Locations. <br /> 2016a(April 15).MW26-BP Well Installation Report and Work Plan for Additional In Situ <br /> Remediation, Deuel Vocational Institution Burn Pit[In Situ Remediation Work Plan]. <br /> 2016b (August 15).PFOA Sampling in Selected Wells, Deuel Vocational Institution Burn Pit. <br /> 2016c.Fourth Quarter 2016 Groundwater Monitoring Report, Deuel Vocational Institution— <br /> Burn Pit. <br /> 2017.Fourth Quarter 2017 Groundwater Monitoring Report, Deuel Vocational Institution—Burn <br /> Pit. <br /> 2020. (January 31)2019 Annual Groundwater Monitoring Report, Deuel Vocational Institution— <br /> Burn Pit. <br /> 7-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.