My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085020 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
311
>
2900 - Site Mitigation Program
>
SR0085020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 8:56:22 AM
Creation date
10/19/2022 8:38:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085020
PE
2903
FACILITY_ID
FA0027064
FACILITY_NAME
UNKNOWN PCE RIPON
STREET_NUMBER
311
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25907008
ENTERED_DATE
3/17/2022 12:00:00 AM
SITE_LOCATION
311 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— Use flag person; <br /> — Use flashing arrow sign; <br /> — Use "MEN WORKING"signs liberally; <br /> — Obtain lane closing permits; <br /> — Engage police details. <br /> 9.1.1.2 Working at Excavation/Trenching Sites <br /> Observe the following site control practices and procedures when working in streets or roadways: <br /> • "Competent person" is required per OSHA 29 CFR 1926 Subpart P. <br /> • Safeguard open excavations by restricting unauthorized access. <br /> • Highlight work area using prominent warning signs (cones, saw horses/barricades, and signage) <br /> placed a minimum of 10 feet back from excavation opening. <br /> — Maintain zone definition along perimeter with a continuous string of yellow orange <br /> caution tape. <br /> 9.1.1.3 Excavations Left Unattended or Overnight <br /> Use one of the following methods for excavations left unattended or overnight: <br /> • Surround entire perimeter with plastic or cloth construction net fencing. Anchor fence to ground <br /> using steel posts driven into ground. Space out posts no greater than 8 feet apart. Fence height <br /> minimum 4 feet high. Fence material must be of a quality capable of withstanding a pressure of <br /> 200 pounds. Place fence a minimum of 10 feet back from excavation opening. <br /> • Place 8-foot-long barricades affixed with flashing lights end to end with 4-foot high construction <br /> net fence attached to barricades. <br /> — Use temporary curbing or concrete 'jersey" barriers affixed with flashing signal <br /> lights or other effective warning signs. <br /> 9.2 Field Communications <br /> Communications between all APTIM employees and subcontractors at the work site can be verbal <br /> and/or non-verbal. Verbal communication can be affected by the on-site background noise and various <br /> PPE. See Table 7 for a list of the type of communication methods and equipment to use, depending on <br /> site conditions. Communication equipment must be checked daily to ensure proper operation. All <br /> 9-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.