6.0 SCHEDULE AND REPORTING <br /> Technical reports and correspondences generated for the project will be submitted to the RWQCB for <br /> review and approval. The final documents will be uploaded to the GeoTracker database in accordance <br /> with the electronic reporting requirements. The following subsections provides the anticipated schedule <br /> and summarize the reports APTIM will prepare at the completion of each phase. <br /> 6.1 Project Schedule <br /> Schedule of Major Activities <br /> Activity Estimated Implementation <br /> Site Walk Completed August 4,2021 <br /> Document Review Ongoing <br /> Utility Location and Video Inspection October/November 2021 <br /> Soil Gas Sampling and Conditional Indoor Air Sampling November/December 2021 <br /> Limited Groundwater Investigation November 2021 <br /> Investigation Report March 2022 <br /> 6.2 Field Investigation Summary Report <br /> Upon completion of the soil gas and groundwater investigation activities, APTIM will present the results <br /> and confirmation of conditional sampling locations in an Interim Field Investigation Memorandum and <br /> confer with the RWQCB. <br /> The Field Investigation Summary Report will summarize investigation activities and present soil, soil gas, <br /> groundwater, and indoor air, sub-slab soil gas,and outdoor air sample results, if collected. Sanitary sewer <br /> line video inspection logs will be included as an appendix as well as field sheets, boring logs, laboratory <br /> analytical reports, and permits. <br /> A summary of deviations between the planned approach presented in the Investigation Work Plan and <br /> the approach employed in the field, including the reasons for the deviations will be discussed. <br /> The Field Investigation Summary Report will also include recommendations for additional investigation <br /> activities, if warranted. <br /> FINAL RIPON PCE INVESTIGATION WORK PLAN.DOCX 6-1 PROJECT NO.631021512 <br />