My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085020 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
311
>
2900 - Site Mitigation Program
>
SR0085020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 8:56:22 AM
Creation date
10/19/2022 8:38:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085020
PE
2903
FACILITY_ID
FA0027064
FACILITY_NAME
UNKNOWN PCE RIPON
STREET_NUMBER
311
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25907008
ENTERED_DATE
3/17/2022 12:00:00 AM
SITE_LOCATION
311 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents (continued) <br /> 9.0 SITE CONTROL/COMMUNICATIONS..........................................................................................................9-1 <br /> 9.1 SITE CONTROL..........................................................................................................................................9-1 <br /> 9.1.1 Site Security and Work Zone Definition...............................................................................................9-1 <br /> 9.1.1.1 Working In Street or Roadway.................................................................................................................9-1 <br /> 9.1.1.2 Working at Excavation/Trenching Sites.....................................................................................................9-2 <br /> 9.1.1.3 Excavations Left Unattended or Overnight................................................................................................9-2 <br /> 9.2 FIELD COMMUNICATIONS..............................................................................................................................9-2 <br /> 10.0 EMERGENCY RESPONSE AND CONTINGENCY PLAN.............................................................................. 10-1 <br /> 10.1 PERSONNEL ROLES/LINES OF AUTHORITY..................................................................................................10-1 <br /> 10.1.1 Project Manager.......................................................................................................................10-1 <br /> 10.2 LIST OF EMERGENCY CONTACTS AND NOTIFICATION.....................................................................................10-2 <br /> 10.3 MEDICAL EMERGENCY RESPONSE ...........................................................................................................10-3 <br /> 10.4 PERSONAL EXPOSURE OR INJURY............................................................................................................10-3 <br /> 10.4.1 Serious Exposures or Injuries Requiring Transport by Ambulance.....................................................10-3 <br /> 10.4.2 Serious Exposures or Injuries Requiring Off-Site Medical Care.........................................................10-5 <br /> 10.5 FIRE CONTROL....................................................................................................................................10-6 <br /> 10.6 SPILL PREVENTION AND CONTROL...........................................................................................................10-6 <br /> 10.6.1 Pre-emptive Measures...............................................................................................................10-6 <br /> 10.6.2 Spill Response.........................................................................................................................10-7 <br /> 10.7 SITE EVACUATION PROCEDURES.............................................................................................................10-7 <br /> 10.8 ADVERSE WEATHER CONDITIONS/NATURAL DISASTERS................................................................................10-8 <br /> 10.9 EMERGENCY EQUIPMENT.................................................................................................................10-8 <br /> 10.10 CRITIQUE AND FOLLOW-UP OF EMERGENCY PROCEDURES............................................................................10-9 <br /> iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.