My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0085020 (4)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
311
>
2900 - Site Mitigation Program
>
SR0085020 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 8:56:22 AM
Creation date
10/19/2022 8:38:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0085020
PE
2903
FACILITY_ID
FA0027064
FACILITY_NAME
UNKNOWN PCE RIPON
STREET_NUMBER
311
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25907008
ENTERED_DATE
3/17/2022 12:00:00 AM
SITE_LOCATION
311 W MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 Introduction <br /> The policy of Aptim Environmental & Infrastructure, LLC (APTIM) is to provide a safe and healthful work <br /> environment for all employees. APTIM considers' no phase of operations or administration to be of <br /> greater importance than injury and illness prevention. Safety takes precedence over expediency and <br /> shortcuts. APTIM believes that all accidents and injuries are preventable. APTIM will take every <br /> reasonable step to reduce the possibility of injury, illness, or accident. <br /> This Health and Safety Plan's (HASP) objective is to help establish safe working conditions at the site. <br /> Safety procedures and protective equipment are chosen according to potential hazards. Specific hazard <br /> control methods have been evaluated and selected to minimize the potential of accident or injury. <br /> This HASP prescribes the procedures that must be followed during specific site activities. Operational <br /> changes that could affect the health and safety of personnel, the community, or the environment will <br /> not be made without the prior approval of the Project Manager (PM) and the Health, Safety & <br /> Environmental (HSE) Manager(HSM). <br /> The provisions of this plan are mandatory for all personnel and subcontractors assigned to the project. <br /> All visitors to the work site must abide by the requirements of this plan. All project participants will <br /> attend a pre-job briefing where the contents of this HASP and the Activity Hazard Analysis (Appendix B) <br /> will be discussed. Project staff assigned to this project must sign the HASP Agreement and <br /> Acknowledgement Sheet (below) to confirm that they understand and agree to abide by the provisions <br /> of this plan. Daily, the Site Supervisor (SS) or designee will need to complete a Tailgate Safety Meeting <br /> Form (Appendix A) and a Job Safety Analysis (JSA) Form (Appendix A) and ensure all personnel working <br /> on site sign both forms. <br /> All work will comply with the Occupational Safety and Health Act (OSHA) standard, "Hazardous Waste <br /> Operations and Emergency Response" (29 Code of Federal Regulations [CFR] 1910.120), APTIM Health <br /> and Safety Procedures, client requirements, and other federal, state, and local procedures that require <br /> the development and implementation of a HASP. Generation of this document certifies that the <br /> workplace has been evaluated for hazards. A hazard assessment has been performed and the adequacy <br /> of the personal protective equipment (PPE) selected was evaluated as required by 29 CFR 1910.132(d), <br /> 1910.134, 1926.25, and 1926.55, and is duly noted by the signature(s) and date appearing on the cover <br /> page of this document. <br /> 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.