Laserfiche WebLink
Violation #4 — Failed to electronically submit the Business Activities or Owner/Operator Identification Page. <br /> SUPPORTING DOCUMENTS INCLUDED <br /> Describe actions taken or will be taken to correct the violation : <br /> As noted below Complete Welders Supply has submitted the required information through the CERS portal as indicated <br /> below on January 140 2022 . <br /> Cabfomu FnNmnmental Hegottiaa system: Business nets AaaeuM Sljns L 9« Has <br /> Submittal History: CONIPLETE WELDERS <br /> Summa! - Previous Submittalsforthis Facility <br /> - <br /> Submittals -. . - in <br /> Subm8led Fa;7Ay _ Im'epl 7 H Plans UST Wasle RecyclingRemoemo! 4Ya le I Tenk Cbsure APSA <br /> Submittal Elements <br /> 111422 AMPM A44€pted Accepted <br /> Nutlecadons <br /> 2222022 2222022 X2222022 � <br /> Compliance 1221 AczappldAccepled - AMIded i <br /> _ - 2221121 2W021 2182021 <br /> i <br /> 1220 '.. AccerlLd Aae led Acmphml <br /> d YNN 41i32020 x132020 <br /> 1128118 A-gi d AmeM Asmajed f�f <br /> Wma19 ' UL320ia. 1232018 <br /> Violation #5 — Failed to electronically submit hazardous materials inventory for all reportable materials on site . <br /> DESCRIBE ACTIONS TAKEN OR WILL BE TAKEN TO CORRECT THE VIOLATION : <br /> Our inventory was submitted through the CERS portal but some of the technical options were needing to be updated or <br /> corrected . The submitted inventory was reviewed and resubmitted through the CERS portal . The specific fields noted <br /> for storage temperature and pressure were updated . <br /> Violation #6 — Failed to electronically submit a site map with all required content. <br /> DESCRIBE ACTIONS TAKEN OR WILL BE TAKEN TO CORRECT THE VIOLATION : <br /> The site map was updated, the facility operates as a supply depot and the products move within the storage area based <br /> on customer demand and business activities. CC <br /> REEF VED <br /> NOV 18 2022 <br /> ENVIRONMENTAL HEALTH <br /> PERMITISERVICES <br />