Laserfiche WebLink
•. RESOLUTION NO. 2 <br /> WHEREAS, this liner performance evaluation identified issues that have not been resolved with <br /> respect to the applicability of single composite liners for Class II waste units at Forward Landfill; and <br /> WHEREAS, because of the following site-specific considerations with respect to the final 10 <br /> acre waste management unit(WMU D-02)within the 100 acres of area D, the threat to groundwater <br /> quality at WMU D-02 using a single composite liner with two feet of clay as its bottom component is <br /> minimal: <br /> • Class II waste management units in area D with single composite liners constructed since 1993 <br /> by Forward Inc. have a history of high quality construction, good operational practices and no <br /> evidence of a release of waste constituents to the environment; and <br /> • There are approximately forty-five(45) feet of separation between the bottom of the waste unit <br /> and groundwater, and native soils beneath the unit are intercalated clay, silt, and sand; and <br /> • Forward Inc. proposes to construct WMU -02 with a double composite liner under the sump <br /> area,thus giving an extra level of protection in the area most likely subjected to build—up of <br /> hydraulic pressure head; and <br /> • WMU D-02 is the final 10-acre parcel filling the northeast corner of a larger previously <br /> constructed 100-acre landfill area composed of multiple, single composite lined waste <br /> management units; and <br /> • Construction of a double composite liner at this time would present unique and difficult <br /> constructability problems. Constructability problems that would have to be resolved include: <br /> matching a double liner with two existing single liners; continuity of leachate drainage pipes; and <br /> stability issues resulting from multiple geomebrain layers(which can act as failure plains) in an <br /> area exposed to lateral stresses from two directions; and <br /> • Forward Inc. has proposed to aggressively control landfill gas at the combined Forward/Austin <br /> Road landfill and has submitted a plan for landfill gas control at the Forward site; and <br /> WHEREAS, Forward Inc. will fill the currently operating waste management unit by late <br /> summer 2002 and started construction of the new unit WNW D-02 in April to avoid running out of <br /> capacity; and <br /> WHEREAS, there is insufficient time to resolve all outstanding issues with Forward's liner <br /> performance demonstration for expansion outside of the D area in time to prevent a temporary <br /> shutdown of landfill operations; <br /> Therefore,be it <br /> RESOLVED,that the California Regional Water Quality Control Board, Central Valley <br /> Region, hereby approves construction of a single composite liner for the remaining 10 acres of waste <br /> management unit D-02 provided that it otherwise complies with all the requirements of WDR Order <br /> No. 97-141 and Title 27. <br />