Laserfiche WebLink
Mr. Kevin Basso. - 2 - 8 March 2000 <br /> install a landfill gas collection and control system from a water quality standpoint after the <br /> intermediate cap is in place. <br /> Forward should submit addendums to the report to address the concems listed above. Upon receipt of <br /> adequate replies to our concerns, we do not anticipate further delay in approval for the Partial Final <br /> Closure Plan. <br /> If you have any questions, please call me at (916) 255-3814. <br /> ROSS D. ATKINSON <br /> Associate Engineering Geologist <br /> cc: Mr. Tom Boardman, GeoSyntec Consultants, Walnut Creek <br /> Mr. Robert McClellan, San Joaquin County LEA, Stockton <br /> Mr. Curt Fujii, Forward Inc. <br /> Mr. Tim Crist, CIMWB, Sacramento. <br /> RDA;C:\nrydocuments\FORWARD\closereptLtr <br />