Laserfiche WebLink
MONITORING AND REPORTING PROGRAM NO. 8 <br /> FORWARD INC. AND ALLIED INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS H LANDFILL <br /> SAN JOAQUIN COUNTY <br /> *Proposed new wells or new well pairs. <br /> Note that a suffix A was added to previous Austin Road well names to prevent <br /> confusion with old Forward wells. <br /> Hydrographs of each well shall be submitted showing the elevation of <br /> groundwater with respect to the elevations of the top and bottom of the screened <br /> interval and the elevation of the pump intake. Hydrographs of each well shall be <br /> prepared quarterly and submitted annually. <br /> Groundwater samples shall be collected from the point-of-compliance wells, <br /> evaluation wells,background wells, and any additional wells added as part of the <br /> approved groundwater monitoring system. Samples shall be collected and <br /> analyzed for the monitoring parameters in accordance with the methods and <br /> frequency specified in Table I. <br /> The monitoring parameters shall also be evaluated annually with regards to the <br /> cation/anion balance, and the results shall be graphically presented using a Stiff <br /> diagram, a Piper graph, or a Schueller plot. Samples for the constituents of <br /> concern specified in Table I shall be collected and analyzed in accordance with the <br /> methods listed in Table VI every five years. <br /> 2. Unsaturated Zone Monitoring <br /> The Discharger shall operate and maintain an unsaturated zone detection <br /> monitoring system that complies with the applicable provisions of§20415 and <br /> §20420 of Title 27 in accordance with a detection monitoring plan approved by <br /> the Executive Officer. The Discharger shall collect,preserve, and transport <br /> samples in accordance with the quality assurance/quality control standards <br /> contained in the approved Sample Collection and Analysis Plan. <br /> Unsaturated zone samples shall be collected from the monitoring devices (either <br /> suction lysimeters or pan lysimeters) and background monitoring devices of the <br /> approved unsaturated zone monitoring system. The collected samples shall be <br /> analyzed for the listed constituents in accordance with the methods and frequency <br /> specified in Table H. All monitoring parameters shall be graphed so as to show <br /> historical trends at each monitoring point. Samples for the constituents of concern <br /> specified in Table II shall be collected and analyzed in accordance with the <br /> methods listed in Table VI every five years. <br /> The pan lysimeters shall be checked monthly for liquid and monitoring shall also <br />