My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:14:05 PM
Creation date
10/21/2022 10:00:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2002
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND RPORTING PROGRAM NO. 10 <br /> FORWARD INC. AND ALLIED INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS H LANDFILL <br /> SAN JOAQUIN COUNTY <br /> approved by the Executive Officer. Landfill gas monitoring points shall be <br /> sampled and analyzed for the monitoring parameters specified in Table II. The <br /> Discharger shall collect, preserve, and transport samples in accordance with the <br /> quality assurance/quality control standards contained in the approved Sample <br /> Collection and Analysis Plan. <br /> 6. Facility Monitoring <br /> a. Facility Inspection <br /> Annually,prior to the anticipated rainy season,but no later than 30 <br /> September, the Discharger shall conduct an inspection of the facility. The <br /> inspection shall assess damage4o the drainage control system, <br /> groundwater monitoring equipment(including wells, etc.), and shall <br /> include the Standard Observations contained in section FA.f. of Order No. <br /> Any necessary construction, maintenance, or repairs shall be <br /> completed by 31 October. By 15 November of each year, the Discharger <br /> shall submit an annual report describing the results of the inspection and <br /> the repair measures implemented, including photographs of the problem <br /> and the repairs. <br /> b. Storm Events <br /> The Discharger shall inspect all precipitation, diversion, and drainage <br /> facilities for damage within 7 days following major storm events. <br /> Necessary repairs shall be completed within 30 days of the inspection. <br /> The Discharger shall report any damage and subsequent repairs within 45 <br /> days of completion of the repairs, including photographs of the problem <br /> and the repairs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.