Laserfiche WebLink
MONITORING AND RPORTING PROGRAM NO. 10 <br /> FORWARD INC. AND ALLIED INDUSTRIES <br /> FOR OPERATION OF <br /> FORWARD CLASS H LANDFILL <br /> SAN JOAQUIN COUNTY <br /> approved by the Executive Officer. Landfill gas monitoring points shall be <br /> sampled and analyzed for the monitoring parameters specified in Table II. The <br /> Discharger shall collect, preserve, and transport samples in accordance with the <br /> quality assurance/quality control standards contained in the approved Sample <br /> Collection and Analysis Plan. <br /> 6. Facility Monitoring <br /> a. Facility Inspection <br /> Annually,prior to the anticipated rainy season,but no later than 30 <br /> September, the Discharger shall conduct an inspection of the facility. The <br /> inspection shall assess damage4o the drainage control system, <br /> groundwater monitoring equipment(including wells, etc.), and shall <br /> include the Standard Observations contained in section FA.f. of Order No. <br /> Any necessary construction, maintenance, or repairs shall be <br /> completed by 31 October. By 15 November of each year, the Discharger <br /> shall submit an annual report describing the results of the inspection and <br /> the repair measures implemented, including photographs of the problem <br /> and the repairs. <br /> b. Storm Events <br /> The Discharger shall inspect all precipitation, diversion, and drainage <br /> facilities for damage within 7 days following major storm events. <br /> Necessary repairs shall be completed within 30 days of the inspection. <br /> The Discharger shall report any damage and subsequent repairs within 45 <br /> days of completion of the repairs, including photographs of the problem <br /> and the repairs. <br />