My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2000-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 4:14:05 PM
Creation date
10/21/2022 10:00:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2002
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•r <br /> INFORMATION SKEET <br /> WASTE DISCHARGE REQUIREMENTS <br /> FORWARD LANDFILL <br /> FORWARD INC. AND ALLIED WASTE INDUSTRIES <br /> SAN JOAQUIN, COUNTY <br /> Allied Waste Industries as Forward Inc. owns and operates Forward and Austin Road Landfills, <br /> two adjacent facilities approximately seven miles southeast of Stockton on Austin Road. The <br /> discharger has requested revised Waste Discharge Requirements that combine the two facilities. <br /> The combined facility will be approximately 567 acres and will include both existing and <br /> planned waste management units. <br /> New waste management units will be designed and constructed for the discharge of designated <br /> waste. The liner system for new units consists of a single composite base liner composed of <br /> from bottom to top: a prepared subgrade, two feet of compacted clay with a hydraulic <br /> conductivity of 10"7 or less, 60 mil HDPE, one-foot gravel drainage layer, filter fabric, and one- <br /> foot operations layer. Double composite liners will be installed under landfill sumps; and a <br /> electric leak test will be conducted over the entire base liner after installation of the operations <br /> layer. <br /> Implementation of a corrective action plan to cleanup a groundwater contaminant plume at <br /> Austin Road Landfill is ongoing. The contamination is characterized by the presence of volatile <br /> organic compounds (VOCs) including but not limited to vinyl chloride, tetrachloroethane, <br /> trichloroethane, and cis-l,2-dichloroethane. The Corrective Actions include installation of a <br /> landfill cover on the unlined waste unit, improvements to the landfill gas extraction system and <br /> groundwater recharge. Additionally, improvements will be made to the monitor well system; <br /> and if groundwater contamination is not contained or if significant progress toward cleanup is <br /> not made additional extraction wells will be brought on line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.